Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section.

Slides:



Advertisements
Similar presentations
FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Advertisements

Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
“The Honeywell Web-based Corrective Action Solution”
FDOT State Specifications & Estimates Office
Creating and Entering Additional Pay 1 To enter an Additional Pay Request, you need to be prepared with University specific Payroll codes, compensation.
Presented by Cheri Sylvester Asst. Estimates Coordinator Florida’s Turnpike Enterprise Presented by Cheri Sylvester Asst. Estimates Coordinator Florida’s.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
Module 4: System Maintenance Intuit Financial Services University Internet Banking Certification Training.
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
OnBase E-Forms and Workflow
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
FDOT’s Web Interface Presented by: Paul Herring Florida DOT, Estimates Office
OneOffice has provisions to add Pay Items for modifications to the Contract by Supplemental Agreements, Change Orders and for work covered by Standard.
PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003.
Inter-Warehouse Transfers An Enhancement For iSeries 400 DMAS from  Copyright I/O International, 2004, 2005, 2007, 2010 Skip Intro.
Pay Items, BOE and TRNS*PORT Paul Herring FDOT State Estimates Office (850) SC
EMARS User Group Meeting Don Speer. ETHNIC MINORITY BUSINESS SMALL PURCHASES 2.
ProcureAZ 11 Invoices.
HORIZONT 1 ProcMan ® The Handover Process Manager Product Presentation HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89.
TxEIS Employee Training
Trns*port Data Model Unification Joe Pugh Virginia Department of Transportation Peggy Leight Info Tech Inc 11/06/05.
Change Management Demo for IT 11/06/2013 Change Management, IT Meeting 11/06/
Claim Tracking System. Why was the Claim Tracking System Built? Mandated by the 2002 Legislature Automated Monthly Summary Reports Track and Ensure Construction.
Supplier Invoicing North America
Temporary Removal Request Demo 1.Role of Unit Maker 1.Preparation of Temporary Removal RequestPreparation of Temporary Removal Request 2.Submission of.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
1 12 Easy Steps to Complete an Employment Contract Amendment Campus Human Resources Employment & Compensation Services October, 2009.
Page 1 Returns Receivings By MIS Department. Page 2 The Returns Process When a store or customer wants to return goods, they are supposed to contact the.
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
EaTIS Vendor Training - FY EaTIS Training for Vendors – Process Overview EaTIS Version 3.01 Last Modified on April 5, 2007.
ALDOT’s Proposal and Estimates System (PES) Cookbook (Preliminary Estimates)
AASHTO Estimator Presentation Introduction Obtaining an Estimator Account Log in Estimator Set up Global Options Opening a catalog New items Special Provisions.
1 State-Adopted Textbook Requests Procedures and Policies.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Tracking Project Concepts in PMIS GEF Expanded Constituency Workshop April 5 – 7, 2011 Da Lat, Vietnam.
Nursing Library Training using Sunrise Press data.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
ENCOMPASS Voucher Build Process
1 Presented to the Simplified Acquisition Committee on August 28, 2013 NIHCATS II electronic Government Ordering System (eGOS): An Overview.
Cost Estimation System CES Implementation at NDOR TUG 2006.
Select the Services Purchase Order Menu Select Add Recycling Services Purchase Order to create a new Services Purchase Order.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Welcome to State of Michigan Managerial and SupervisoryExpense Approval & Modification Approval & Modification Tutorial Brought to you by the Office of.
Purchasing Office POISE Distributed Purchasing System (DPS)
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
Welcome to State of Michigan Central Finance Advance Approval & Modification & Modification Tutorial Brought to you by the Office of Financial Management.
To the Unit Agreement Exhibit A Unit Tract Revision Online Training Course The purpose of this course is to provide guidance and information to ETS clients.
2016 TELPAS Online Testing. TELPAS Assessment Management System Accessed at
Purpose of the Project Maintains the flow of the money released by the state government of a particular financial year Because of this, a common citizen.
TEA Student Assessment Division 2  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.  If any slide is.
2016 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
Supply Discrepancy Report-Automation (SDR-A) SDR Submission Wizard "THIS BRIEFING/PRESENTATION/DOCUMENT IS FOR.
SchoolSuccess for Coordinators
Overview Rental Quote Overview
Administrators and System Administrators
Your Name Proposal Creation Module 5 Your Name
Training Documentation – Replacing GSPR with RFQ 2.0
Accounts Payable Workflow
LOCALLY ADMINISTERED PROJECTS
Additional Configuration The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on additional.
Orders & Shipment Tracking
Cost Collections Using DOS CC Interface
Cayuse 424 Proposal Creation.
Additional Configuration The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on additional.
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
Local Review is a web site used by state industry projections analysts to obtain, from local area experts, information about economic activity and any.
Presentation transcript:

Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section

Trnsport Modules Roles and Control Groups Steps in Creating and Estimating Projects and Proposals Project Review Creating an Addendum after Advertisement Re-letting Rejected Bids / No Bids Received Other topics / questions you wish to cover?

Project Data and Pre-Letting Estimate Storage PES Advertising, Bid Letting, and Award Processes LAS Construction Processes SiteManager Temporary location for pricing projects and proposals CES Designer Interface

PES (Proposal and Estimates System) – Preconstruction project data storage module PES contains: Project and Proposal definitions (description, contract time, work type, etc.) Estimate Pay items and quantities, usually from the Designer Interface Unit Prices Other PES functions: Revisions, prior to advertisement Addendums, after advertisement

CES (Cost Estimating System) – Pricing module CES contains libraries for historical pricing, based on: Time period (6, 12, 18 month and 3 years history) All Bidders or Awarded Only Contract time (>729 days) Libraries give customized pricing through regressions and averages

Security Coordinator’s Duties: Provide users with system access to PES, CES, and Designer Interface Request “confidential” access for District users Ensure appropriate access has been given and that unauthorized users do not have access to the system (assigning of Roles). District Estimates Staff Duties: Provide users with project/proposal access at appropriate times in the work flow.

Roles – Users will be assigned a role(s) according to their areas of responsibility, primarily: Designer (for Designer Interface) Estimator (for contract building and pricing)

Control Groups – Used to determine who will have access to a project/proposal at given times in the work flow. Projects are assigned a control group (for example CD07): C=Construction (as opposed to M=Maintenance) D=District project (project control resides in the District) 07 = Managing District Number Design firms are assigned a staff code (for example, V777) The design firm’s staff code is appended at appropriate times when they need access to the project (for example, CD07V777) Design firm’s staff code is not appended to proposals.

How is a Control Group Assigned? When the transfer from FM via TSO is performed by the District Estimates staff, the initial Control Group is automatically assigned by: FM phase number (for example, 52=Construction) Managing District (for example, 07= District 7) When the project and proposal records are passed to the next user group for processing, the District Estimates staff assigns the appropriate Control Group to transfer control.

Put screens 1-5 from Control Group Structure in Pes- Ces 2010

CD07 Central Let District Let CC07 CO Project Review CL07 District Contracts Admin CT07 CO Contracts Admin

Assigning Roles to New Consultant Users- Find the company’s staff code From the PES User List, add UserID From UserID screen, select System Identifiers List, and add PES and Control Group From PES, select System Identifier Role List to add Designer Role For non-designers, refer to Role List for appropriate role(s)

PES Staff List (Designers) User List Add User ID Add Role for PES (Designer or Other) Add PES module & Control Group

Create Project / FM Interface Add Pay Items / Designer Interface Estimate Project in CES Generate Project Reports for Verification Create Proposal Estimate Proposal in CES Final Preparation for Letting

Creating and Estimating Projects and Proposals Step 1: Create project There are 3 ways to create a project: FM Interface (recommended method) Manual entry from menu bar Copy existing project Assign Project to appropriate control group Step 2: Add pay items and quantities There are 2 ways to enter data: Designer Interface (recommended method) Directly into PES (FDOT Estimates staff only)

Creating and Estimating Projects and Proposals Step 3: Estimate Project In CES, use libraries and regressions/averages models (recommended method for initial pricing) In PES, manually enter prices obtained from another source (override based on project conditions) Step 4: Run Project Reports for Verification Project Edit Report Project Summary of Pay Items Step 5: Create Proposal In PES, right click, “Add Proposal” Attach project(s) to proposal

Import / Export are relative to CES Check In / Check Out are relative to PES PESPES CESCES PESPES ImportImportExportExport Check Out Check In

Creating and Estimating Projects and Proposals Step 6: Estimate Proposal In CES, use libraries and regressions/averages models (recommended method for initial pricing) In PES, manually enter prices obtained from another source (override based on project conditions) Step 7: Final Preparation for Letting Generate Proposal Summary of Quantities (for error check purposes) Change Control Group to submit to CO Project Review or District Contracts Administration

Each scope alternate will be built as a standalone project(s) and proposal, by appending a suffix: The non-suffixed project(s) and proposal will exist temporarily to facilitate the creation of the suffixed scope alternate project(s) and proposal.

Prior to the Letting: Delete the non-suffixed project(s) and proposal After the Letting: Select awardable scope alternate based on budget amount programmed; Prepare post-bid analysis reports and other required documentation; The proposal number will have the suffix of the chosen alternate displayed on these documents.

Contracts Administration will run a script to identify the chosen alternate in Trnsport. This will occur after all post-bid documents are complete, and prior to Technical Awards Committee meeting. The script will strip the suffix from the chosen alternate; Alternates not chosen will move to DSS as rejected projects. Before the script is run for Trnsport, the Executive Summary will display: All the alternates, with suffixes. After the script is run for Trnsport, the Executive Summary will display: The chosen alternate without a suffix, and the other alternates with suffixes.

PESPES CESCES PESPES ImportImportExportExport Check Out Check In

Performed only on Tallahassee-let proposals; A limited QA review, intended to identify errors or omissions that would prevent proposal from being let (“show stoppers”); In Trnsport, look for: Correct Contract/Calendar Days, for MOT ; Correct Structure Work Class, for pre-qualification; FA number matches contract documents; Correct rounding of Initial Contingency Amount Quantities of 1 replaced with quantities in plans. More in-depth QA review is performed after letting.

Before creating an Addendum: Open the Proposal, and run the process “Generate Section and Line Numbers (Inquiry)”, and print it for later reference *. Create the Addendum Header, with a description of the change. Modify addendum items as needed: Changes and Deletes Adds require a Project Line Number and a Proposal Line Number *.

Contracts Office will: Change the Letting Status to “Rejected”, and include a reason; Disassociate the project(s) from the Proposal. Project(s) can then be handled as any other project in PES. They can be: Re-estimated; Associated with a new Proposal number (cannot reuse a Proposal number).