DEDEA STRATEGIC FRAMEWORK STAKEHOLDER BRIEFING 12 OCTOBER 2010
The Province has clustered the necessary infrastructure investments into: – Logistics; – Water and Energy; – Telecommunications; – Renewable Energy; – Forestry and Agriculture; and – Environmental Management. BACKGROUND
Strategic projects in each cluster are further organised into four geographic development zones: – Port Elizabeth and surrounds (Coega Industrial Development Zone); – East London and surrounds (East London Industrial Development Zone); – the Wild Coast Development Zone; and – the Central hinterland. Green initiatives are also clustered geographically BACKGROUND…cont
WILD COASTPORT ELIZABETHEAST LONDONHINTERLAND LOGISTICS 1.Integrated Transport Hub 2.Provincial Parks infrastructure 3.Twinned Gateways 4.Relocation of Tank Farm and Manganese Terminal to Coega 5.Upgrade of EL Harbour 6.R72-N2-N6 Link 2.Provincial Parks infrastructure WATER & ENERGY 7. Ntabelanga Multi Purpose Water Resource Development 8. Project Mthombo 9. CCGT Power Station 10. Bulk Water Transfer from Ntabelanga TELECOMMS 11. SeaCom cable RENEWABLE ENERGY 12.Electric Vehicle Project 13.Bio-fuels Industry Development 14.Enabling Support for Alternative Energy Source Industries FORESTRY & AGRICULTURE 15. Forestry Development 16. Agricultural Development 13.Bio-fuels Industry Development ENVIRONMENTAL MANAGEMENT 17. Environmental Management Framework (EMF) for Wild Coast 18. Wild Coast Illegal Cottages Investigations 17.EMF for Buffalo City Municipality 19. Operationalisation of landfill sites 20. Peddie Revitalisation Programme 21. Environment Sector EPWP Projects
INTEGRATED WILD COAST TRANSPORT HUB
N2 TOLL ROAD APPROVED
INTEGRATED WILD COAST TRANSPORT HUB KEI-RAIL EXTENSION TO KOKSTAD PROPOSAL
INTEGRATED WILD COAST TRANSPORT HUB MTHATHA AIRPORT REFURBISHED
TWINNED GATEWAYS COEGA TO TAMBO SPRINGS Port of Ngqura, Coega IDZ
Twinned Gateways Coega to Tambo Springs Port of Ngqura, Coega IDZ to/from Tambo Springs
RELOCATION OF “OLD PORT” INFRASTRUCTURE PORT OF PE AND PORT OF NGQURA REMOVE OLD FACILITIES RELOCATE FACILITES REHABILITATE LAND
UPGRADE OF EAST LONDON HARBOUR EAST LONDON PORT EXPANSION AND UPGRADING EXPAND AND UPGRADE SERVING
R72 / N2 / N6 LINK R72 / N2 BUFFALO RIVER CROSSING AND N6 UPGRADE
NTABELANGA MULTI PURPOSE WATER RESOURCE DEVELOPMENT HYDROPOWER AND IRRIGATION
PROJECT MTHOMBO OF PETROSA PETRO CHEMICAL REFINERY AT COEGA IDZ
COEGA CCGT POWER STATION COASTAL POWER GENERATION, NETWORK STABILITY, REDUCED TRANSMISSION LOSSES, SECURITY OF SUPPLY, PRIMARY ENERGY DIVERSITY, REDUCED CARBON FOOTPRINT
UNDERSEA CABLES BROADBAND ACCESS FOR THE EASTERN CAPE
UNDERSEA CABLES BROADBAND ACCESS FOR THE EASTERN CAPE
RENEWABLE ENERGY – ELECTRIC VEHICLE MANUFACTURING FACILITY FOR SA’S FIRST LOCALLY DESIGNED ELECTRIC VEHICLE – THE JOULE
THE KEY ARGUMENT The Eastern Cape still remains vulnerable – Lagging behind in delivering critical Capital Investments, with further reduction in government spending on key catalytic interventions planned and a Provincial Budget deficit = slowed economic recovery Thus, national intervention and private sector lobbying is key in realising these strategic interventions
THANK YOU