Presentation is loading. Please wait.

Presentation is loading. Please wait.

TNPA INFRASTRUCTURE.

Similar presentations


Presentation on theme: "TNPA INFRASTRUCTURE."— Presentation transcript:

1 TNPA INFRASTRUCTURE

2 PORT OF RICHARDS BAY – CURRENT LAYOUT
2

3 PORT OF RICHARDS BAY – LONG TERM LAYOUT
3

4 PORT OF DURBAN – CURRENT LAYOUT
4

5 PORT OF DURBAN – LONG TERM LAYOUT
5

6 PROPOSED DDOP – CURRENT LAYOUT
6

7 PROPOSED DDOP – LONG TERM LAYOUT
7

8 PORT OF EAST LONDON – CURRENT LAYOUT
8

9 PORT OF EAST LONDON – LONG TERM LAYOUT
9

10 PORT OF NGQURA – CURRENT LAYOUT
10

11 PORT OF NGQURA – LONG TERM LAYOUT
11

12 PORT OF PORT ELIZABETH – CURRENT LAYOUT
12

13 PORT OF PORT ELIZABETH – LONG TERM LAYOUT
13

14 PORT OF MOSSEL BAY – CURRENT LAYOUT
14

15 PORT OF MOSSEL BAY – LONG TERM LAYOUT
15

16 PORT OF CAPE TOWN – CURRENT LAYOUT
16

17 PORT OF CAPE TOWN – LONG TERM LAYOUT
17

18 PORT OF SALDANHA BAY – CURRENT LAYOUT
18

19 PORT OF SALDANHA BAY – LONG TERM LAYOUT
19

20 PORT OF PORT NOLLOTH – CURRENT LAYOUT
20

21 PORT DEVELOPMENT FRAMEWORK PLANS
21

22 TNPA PAST 5 YEAR CAPITAL PROGRAMME SPENT
FINANCIAL YEAR 2011/12 2012/13 2013/14 2014/15 2015/16 SPENT R1.618bn R1.704bn R1.218bn R2.909bn R2.960bn Past 5 Year Total = R10.409bn 22

23 TNPA 10 YEAR CAPITAL PROGRAMME FINANCIAL YEAR 2016/17 2017/18 2018/19
2019/20 2020/21 BUDGET R2.8bn R4.1bn R5.4bn R6.9bn R8.3bn FINANCIAL YEAR 2021/22 2022/23 2023/24 2024/25 2025/26 BUDGET R9.8bn R7.6bn R3.1bn R3.4bn R2.2bn 10 Year Total = R53.6bn 23

24 TNPA 10 YEAR CAPITAL PROGRAMME TOP 20 PROJECTS
PORT PROJECT RCB Provide additional Bulk Liquid berth 207 Facility for Liquefied Natural Gas - LNG Bayvue rail yard expansion DBN IV berth 1 Upgrade Edwin Swales Link Road Acquistion of 6 tugs for Dbn Reconstruction of Sheet-Pile Quay Walls at Maydon Wharf Berth Deepening M/Wharf 5-11 & 15 DCT berth deepening 203 to 205 Pier 1 Phase 2 Infill (Salisbury Island) EL Extend main breakwater and deepen entrance NGQ Additional two 70ton bollard pull tugs Automated mooring system at NCT D Manganese project Operationalise Port for Containers Tank farm Berth A100, roads, port entrance and services CPT Expansion of Container Terminal: CPT SLD Ore Expansion Phase 2 Berth Construction DRS Provision of second new TSHD HO Acquisition of associated land sites linked to DIA Site acquisition TOTAL COST R45billion 24