Developing a High Quality Baseline Salimah Samji & Mona Sur World Bank, New Delhi June 21, 2006.

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

SURVEY QUALITY CONTROL
Elements of Survey Methodology Documentation MICS3 Data Analysis and Report Writing Workshop.
MICS 3 DATA ANALYSIS AND REPORT WRITING. Purpose Provide an overview of the MICS3 process in analyzing data Provide an overview of the preparation of.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Survey Quality Control.
Reasons for Monitoring and Evaluation at the Project Level
Child Care Subsidy Data and Measurement Challenges 1 Study of the Effects of Enhanced Subsidy Eligibility Policies In Illinois Data Collection and Measurement.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Maintaining data quality: fundamental steps
Higher Business Management Budgets. What is a Budget? A document showing what the organisation predicts they are going to spend in the future Usually.
Step by step guide.
© Dr I M Bradley CG109 - Individual Project (Undergraduate) Overview Briefing.
Training for Participants Date, Location, Venue 1 Welcome! Welcome to PEM 2 Module!
1 Fieldwork logistics and data quality control procedures Kathleen Beegle Workshop 17, Session 2 Designing and Implementing Household Surveys March 31,
STATISTICS FOR MANAGERS LECTURE 2: SURVEY DESIGN.
Return On Investment Integrated Monitoring and Evaluation Framework.
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
FINAL REPORT: OUTLINE & OVERVIEW OF SURVEY ERRORS
Creating Research proposal. What is a Marketing or Business Research Proposal? “A plan that offers ideas for conducting research”. “A marketing research.
1 Module 6 Putting It All Together. 2 Learning Objectives At the end of this session participants will understand: The monitoring and evaluation process.
Assessing Financial Education: A Practitioner’s Guide December 2010.
Monitoring & Evaluation in World Bank Agriculture and Rural Development Operations SASAR Monitoring & Evaluation Workshop New Delhi; June 20, 2006.
Asking the right questions Chapter 3. Nonimpact evaluations and when they are most useful Module 3.1.
United Nations Economic Commission for Europe Statistical Division Applying the GSBPM to Business Register Management Steven Vale UNECE
SAMPLE IMPLEMENTATION PLAN OF A POVERTY ASSESSMENT TOOL To Report to the Management of Microfinance Association of Patharland (MAP), Patharland This proposal.
Arun Srivastava. Types of Non-sampling Errors Specification errors, Coverage errors, Measurement or response errors, Non-response errors and Processing.
Power Point Slides by Ronald J. Shope in collaboration with John W. Creswell Chapter 13 Survey Designs.
Sampling : Error and bias. Sampling definitions  Sampling universe  Sampling frame  Sampling unit  Basic sampling unit or elementary unit  Sampling.
Copyright 2010, The World Bank Group. All Rights Reserved. Training and Procedural Manuals Section A 1.
S/W Project Management
RESEARCH A systematic quest for undiscovered truth A way of thinking
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
OECD/INFE Tools for evaluating financial education programmes Adele Atkinson, PhD Policy Analyst OECD With the support of the Russian/World Bank/OECD Trust.
MARKETS II M&E FRAMEWORK AND CHALLENGES Joseph Obado.
AADAPT Workshop South Asia Goa, December 17-21, 2009 Maria Isabel Beltran 1.
Module 5: Data Collection. This training session contains information regarding: Audit Cycle Begins Audit Cycle Begins Questionnaire Administration Questionnaire.
Collecting primary data: use of questionnaires Lecture 20 th.
September 2007 Survey Development Rita O'Sullivan Evaluation, Assessment, & Policy Connections (EvAP) School of Education, University of North Carolina-Chapel.
UK Aid Direct Introduction to Logframes (only required at proposal stage)
Post enumeration survey in the 2009 Pilot Census of Population, Households and Dwellings in Serbia Olga Melovski Trpinac.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Development Impact Evaluation in Finance and Private Sector 1.
Healthy Futures Performance Measures Session. Session Overview Combination of presentation and interactive components Time at the end of the session for.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
“Problems” in Marketing Research MAR 6648: Marketing Research January 6, 2010.
1 Tempus Tempus Workshop Sarajevo 7 June 2006 « Good practice in Preparing an Application » Anne Collette European Training Foundation Tempus Department.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
3-1 Copyright © 2010 Pearson Education, Inc. Chapter Three Research Design.
Program Evaluation Making sure instruction works..
Onsite Quarterly Meeting SIPP PIPs June 13, 2012 Presenter: Christy Hormann, LMSW, CPHQ Project Leader-PIP Team.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
IDPs and Returnees Profiling Joint IDP Profiling Service Presented by William Chemaly Geneva, August 10, 2010 Yemen, June 16-July 10.
Module 7- Evaluation: Quality and Standards. 17/02/20162 Overview of the Module How the evaluation will be done Questions and criteria Methods and techniques.
1 Health Results-Based Financing Impact Evaluation Surveys Quality Assurance and Data Management Álvaro Canales, Beatriz Godoy, Juan Muñoz Sistemas Integrales.
Chapter Two Copyright © 2006 McGraw-Hill/Irwin The Marketing Research Process.
Survey Training Pack Session 3 – Questionnaire Design.
"Key challenges & factors for consideration in installing MIS mid-way in the life of a project: Experiences from the World Bank" Salimah Samji Experience.
Development of Gender Sensitive M&E: Tools and Strategies.
Knowledge Practice & Coverage Survey (KPC) Overview & resources Moving from research objectives, questions, hypothesis to questionnaire design Day 3: Session.
Evaluation What is evaluation?
Session VIII: Work Plan and Budget Plan
Project monitoring and evaluation
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Impact evaluations at IFAD-IOE
III. Practical Considerations in preparing a CIE
Albania 2021 Population and Housing Census - Plans
Sampling for Impact Evaluation -theory and application-
The Estonian experience with ex-ante evaluation – set-up and progress
Developing a High Quality Baseline
Presentation transcript:

Developing a High Quality Baseline Salimah Samji & Mona Sur World Bank, New Delhi June 21, 2006

Overview What is a baseline? Why you should care The phases of conducting a baseline The errors to avoid in each phase How to manage the common errors Elements of a baseline survey (TOR)

What is a baseline? Fixing the time at the base – a benchmark from which you measure progress Snapshot of indicators at a time Instrument used to: Test hypotheses of project (assess results) Planning (refine targeting, indicators to monitor)

Why you should care … To identify whether there were any benefits for the investments made Were objectives met? What factors explain the result? How can the program be improved? Compare alternative models to get the biggest bang for your buck To inform next generation projects Evidence-based policy making – demonstration effect for government

The phases of conducting a baseline Design Implementation – actual survey Data entry and analysis Report writing

Phase 1: Design Phase

P1: Check-list Clear objectives (what is the problem?) Clear idea of how you will achieve the objectives (causal chain or hypotheses) Clear and measurable indicators Clear (precise and unambiguous) Relevant (to objectives) Monitorable

Example of a causal chain Impact Outcomes Outputs Activities Inputs Facilitators, Revolving fund (credit) Forming, federating and organizing SHGs Number of SHGs, decreased input prices Increased use of credit for income generation, Loan repayment rates Higher income levels Example: APDPIP

P1: Check-list (contd) Design survey instrument – keep it simple and related to the objectives and hypotheses you want to test Link surveys to GIS – use consistent units Select controls/counterfactuals to attribute change (causality) Timing of baseline Before project (what if project never materializes)? 2 years into the project (intervention has begun)? Other factors (seasonality)

P1: Check-list (contd) Sampling strategy Random allows inferences about a population Random Stratified random (include groups which could be excluded) Non-random – use a group smaller than the population Introduces selection bias. Note: every stratification introduces a level of bias. Population Size Sample Size , , , ,00,000385

P1: Check-list (contd) Over sample for attrition Design the database system for data entry Translate the questionnaire Back translate to verify Provide adequate training on The objectives and importance of the study How the sections are linked and what the questions mean Attend the training if possible (stay involved)

P1: Check-list (contd) Test the questionnaire Ask yourself, can you answer these questions? Are they relevant to the outcomes? Will they be understood? Field test: To test both how the surveyor administers the instrument AND how the respondent understands the question.

P1: Why it is important to field test (i) When asking a question about the level of awareness, the surveyor used a word that could mean awareness or knowledge – the respondent understood it to mean education. : The question was: Ram/ Gita knows about everything that happens (vikas) in the village. For instance, they know [the name of the sarpanch, when and where the Gram Panchayat meets, nature and type of development work in village, etc.]

P1: Why it is important to field test (ii) CASE STUDY: Domestic Violence Study in India In studying domestic violence, a question in the survey instrument asked if female respondents had ever been beaten by their husbands in the course of their marriage. Only 22 per cent of the women responded positively to this question – a domestic violence rate much lower than studies in Britain and the US had shown. In probing the issue with in- depth interviews we discovered that the women had interpreted the wordbeating to mean extremely severe beating – when they had lost consciousness or were bleeding profusely and needed to be taken to the hospital. Hair pulling, ear twisting, etc, which were thought to be more everyday occurrences, did not qualify as beating. Reponses to a broader version of the abuse question, comparable to the questions asked in the US and UK surveys, elicited a 70 per cent positive response. Source: Vijayendra Rao (1998) – Wife-Abuse, Its Causes and Its Impact on Intra-Household Resource Allocation in Rural Karnataka

Phase 2: Implementation

What would you do if you … Were a city person who didnt speak the local language very well Had to travel to several villages and spend hours asking people questions that have no relevance to you. Were paid a small sum per questionnaire Not monitored by supervisors This is not your full time job

The answer is simple Sit at home or in a bar and fill out the questionnaires!!

P2: Providing incentives and motivation Sub-contracting surveyors from the state who speak the language Include women surveyors Include a supervisor who conducts data scrutiny If possible pay reasonable wages Randomly verify questionnaires to reduce the likelihood of false responses (inform them beforehand - during the training)

Phase 3: Data Entry and Analysis

P3: Check-list Data Entry Make the data entry system as fool proof as possible - has unique identifiers to link both household, village and GIS data Ensure database allows for merging of data Do not change/erase data on questionnaires Raw data should always be input as is, changes can then be made in the database software (programatically) with documentation

P3: Check-list (contd) Often data entry is contracted out. Name variables corresponding to the question and section in the questionnaire – include a dictionary Code descriptive answers (to facilitate analysis) All fields should be filled (NA or NR) Units should be uniform by district Totals calculated by formula not from summary column Consistency checks – check for missing entries, wrong entries, sample statistics, patterns (queries should be inbuilt) Validity checks – similar questions in different places on the questionnaire (RCH example)

P3: Check-list (contd) Data analysis Common mistakes in interpreting data No analysis! No correlations, crosstabs, statistical significance levels or regressions Over generalizing the results Mis-reporting statistics Using % when the numbers are small Attributing causality when it is not demonstrated

Phase 4: Report Writing

P4: What the report should be … Simple, Clear and Relevant State limitations (attribution, causality) Major findings should be upfront Focus on quality rather than quantity Technical details in an appendix Should always include the questionnaire in the appendix ask for electronic copy of data Request copies of filled out surveys Essential if you change consultants at midterm or want to conduct internal analysis to compare modes of delivery (data lost example).

How to manage the common errors Phase 1: Design Clear objectives and hypotheses – know what you want to test Identify a person in your unit who will manage this process Write a good TOR, remember the baseline determines the quality of your panel You can add questions as project evolves but cannot change questionnaire – threat to internal validity Identify consultants Procurement – focus on quality not the cheapest bid if you throw peanuts youll attract monkeys Ideally you should have a black-list of organizations

How to manage the common errors Phase 2: Implementation Organize an impact evaluation workshop if necessary Randomly verify questionnaires to reduce the likelihood of false responses (no filling it in a bar) Pay reasonable wages to surveyors (if possible) Show the client and firm that you care

How to manage the common errors Phase 3: Data entry and analysis Double-data entry (2 separate organizations and verify. Payment based on quality of data entry) Select 15 questionnaires at random and check data entry – person in your unit managing Check data quality (consistency and validity checks) Hold an IE workshop to build data analysis capacity (if necessary)

How to manage the common errors Phase 4: Report writing Agree on an outline beforehand Dedicate a chapter on indicators you are tracking Focus on quality not quantity Think Big Picture

Elements of a Baseline Survey Terms of References 1. Background: Project objectives and components 2. Survey design: Consult a sampling expert!!! 3. Survey instruments 4. Guidance on survey implementation 5. Data processing and analysis 6. Staffing 7. Duration and time schedule 8. Submission of reports and datasets 9. Support to the firm 10. Budget & Payment Schedule 11. Annexes: Draft questionnaires, Results Framework

Baseline Survey Design: Typical Tasks for Consultants Recommend the methodology for sampling Calculate the optimal sample size Develop the sample frame and select the sample The final sample and details of the statistical methodology used to select the sample need to be cleared by the project Construct the sample weights and provide documentation on the methodology used to construct the weights

Survey Instruments: Questionnaires Design or refinement and adaptation of the data collection instruments Specify levels of data collection Length of questionnaires Prepare all support documentation including coding guides, interviewer and supervisor manuals and the data entry manual Translation and back-translation Skip patterns, coding open ended questions

Guidance on Survey Implementation Implementation plan Selection and training of field workers: specify minimum duration of training Pilot testing should be explicitly specified in ToR Responsibility for all field operations, including logistical arrangements for data collection and obtaining household consent lies with Consultants. Ask for field-work progress reports (bi- weekly/monthly)

Staffing Sampling expert/statistician Technical specialists as relevant Economist Sociologist. Core survey staff: the survey manager, the field manager, the data manager Enumerators, supervisors and data entry staff

Baseline Report & Data Explicitly request final electronic datasetswith complete documentation. Agree on outline of baseline report up- front.

Managing a Baseline Survey Consult the expertssurvey specialist and sampling specialist and develop the ToR in consultation. Selection committee should include a survey expert and social scientists in addition to technical experts. You can never over-supervise!!! Hire third-party supervision consultant if needed. Question the data and the findings.

Lets recap what you have learned The devil lies in the detail Be watchful No pain, No gain