EBART update and introduction of Next Segment Study.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Great Western Corridor Feasibility Study
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Introductory Training for the Incident Management Team [Emergency Dispensing Site] Operation Part B Transitioning the IAP to the EDS Unit [Jurisdiction.
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Project Update Goat Island Park Ph. 2 Town of Cramerton December 19 th, 2013.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Utility Extension Project
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Title Slide California High Speed Rail Authority Board Meeting September 28, 2005.
California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
College Station ISD Planning for Growth December 12, 2006.
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
The Delta Science Center at Big Break. The Delta Science Center at Big Break MISSION Recreation Education Restoration Research.
Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer.
PMI-SVC Website Redesign Initiative November 9, 2006 John Patricio PMP MBA PMI-SVC Volunteer Information Technology Director.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
CONSULTATION IS THE KEY: THE GEORGETOWN BRANCH PROJECT Jane Diamanti, Director of Library Services Halton Hills Public Library.
City Council Meeting June 16 th, 2013 – Community Center Eric Contreras, Assoc. AIA, CGC AADAG Consulting Services, LLC (ACS) LEED AP® Architecture–Engineering-Construction.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Project Cost Estimating Improvement Actions, Results and Trends CTC Briefing March 16, 2006.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
Diversity Outreach Program Fourth Session Surveying – Setting the Base for the Project January 20, 2015.
Getting the Message Out: Using Technology to Communicate.
Britannia Village Flood Control Project Report Back to RVCA Board of Directors – Dec 16, 2010 after attendance at Community Meeting of November 30, 2010.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
Draw a line through the points A(1,-2) and D(4,4). Find the coordinates of 2 more points on the line.
Indian Hill Grade Separation City Council Meeting February 23, 2016.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Scituate Adaptive Building Reuse. SABR Initiative The Board of Selectmen has established an ad-hoc committee to assist the Board in evaluating and recommending.
What does a Civil Engineer do?
Industry Briefing 25 May 2016.
GAME:IT The Engineering Design Cycle. GAME:IT THE DESIGN CYCLE  The basic steps of design are the same if you are building a bridge, house, skyscraper.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
Board of Supervisors Quarterly Update July 2, 2014.
Hillsborough County Public School Siting MPO SCHOOL TRANSPORTATION WORKING GROUP
Capital Facilities Program Update San Rafael City Schools
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Campus Master Plan.
City Council Study Session March 15, 2010
Downtown Midland Streetscape Redevelopment
Richmond Greenway Phase I
Negotiating Franchise Agreements A Case Study December 7, 2017
D Line TAC Meeting #1: D Line Rapid Bus Project Planning City of Richfield Transportation Commission July 12, 2017 Katie Roth, Project Manager.
Issaquah-Fall City Road
Dublin Unified School District
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
D Line and Station Plan overview
La Grange Plaza Rezoning & Site Plans Site Construction Plans Site
COMMUNICATION PLAN DESIGN GUIDE
Children’s Hospital Update
Galt Court Water Main Replacement
Glenn Engstrom, MnDOT Director, Office of Materials and Road Research
Fairfax County’s Public Facilities Manual (PFM)
North-South Corridor Bus Rapid Transit Project
Central Corridor - Light Rail Transit Metropolitan Council
School Building Committee – December 17, 2018 Design Development Phase
EXECUTIVE STEERING TEAM – DESIGN REVIEW MEETING AGENDA
Garbers Church Road – Shared Use Path Project Update
JLEIC Accelerator R&D Meeting
White Flint North Entrance Feasibility Study
Presentation transcript:

eBART update and introduction of Next Segment Study

2 eBART Phase I construction: tunnel

3

4

5

eBART Phase 1 Construction: train control systems 6

eBART Phase 1 Construction: median barriers 7

eBART Phase 1 Construction: median barriers and transfer platform 8

9 eBART Next Segment Study

10 eBART Next Segment Alignments

11 eBART Next Segment: Example of Laurel Road Station Area

12 eBART Next Segment: Example of Laurel Road Station Area

13 Next Segment Outreach Next Segment public input on: Station sites Land uses at station and surrounding station Access Ridership estimates Conceptual engineering Conceptual station drawings Conceptual cost estimates

14 Next Segment Outreach Public information & input on project & stations: Town Hall meetings with Director Keller City Council presentations Board of Supervisor presentations Tri Delta Board presentations ePPAC discussions BART website at

15 Next Segment Outreach Dates Board of SupervisorsFeb 14 Oakley City CouncilFeb 14 Pittsburg City CouncilFeb 21 Tri Delta Board of DirectorsFeb 22 Brentwood City CouncilFeb 28 Antioch City CouncilMar 13 Director Keller Town HallJune ePPAC discussionsAs scheduled BART websiteOngoing

Introduction of Next Segment Study