Background Information on the Flambeau Mine Source: Final Environmental Impact Statement, Flambeau Mining Company Copper Mine, March 1990.

Slides:



Advertisements
Similar presentations
Certification of Compliance By Evita Lagard
Advertisements

Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
Effective October 1, 2011 New Connecticut General Permit for the Discharge of Stormwater Associated with Industrial Activity October 5, 2010 Connecticut.
Our Vision – Healthier Kansans living in safe and sustainable environments.
C&DD Financial Assurance Cost Estimating An introduction to using the FACE tool May 21, 2012, OEPA, SWDO May 31, 2012, OEPA, CO and SEDO June 4, 2012,
1 Air Management Programs Legislative Audit Bureau May 2004.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.
Chubaka Producciones Presenta :.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Primacy Revision Application The Arsenic Rule. Major Points Components of Primacy Revision Application Attorney General’s Statement Special Primacy Requirements.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
CCR Rule: Consultant’s Perspective 2015 Air & Waste Management Association Meeting Callaway Gardens, GA Presented by: Randy Sullivan, Principal & Senior.
Tahera Environmental Monitoring Commitments Summary Use TK in monitoring; cooperate with communities Collect reliable information that will: Allow detection.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
VI. Developing a VSMP Program General Stormwater Training Workshop.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Flanders Soil Policy Current Flemish policy on soil contamination The Soildecree and VLAREBO Indicators in remediation policy Johan Ceenaeme Head of Unit.
Regulatory Framework for Uranium Production Facilities in the U.S.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Water Quality Certification for hydropower licensing in Wisconsin.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
City of Appleton Stormwater Management Update Presented to the June 11, 2013 Utilities Committee.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Wisconsin DNR Waste and Air Management Regulatory Perspective Non-Refillable Gas Cylinder Recycling Stakeholder Symposium October 2009 David Panofsky,
Hexavalent Chromium MCL Regulation Guidance Eric Zuniga, PE San Bernardino District SWRCB – DDW.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
Wisconsin Department of Natural Resources Perspective on the Industrial Sand Industry March 24 th 2016.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
Noncoal Program Fees Environmental Quality Board April 17, 2012 John Stefanko Deputy Secretary for Active and Abandoned Mining Operations.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Environmental Quality Board
Upland Landfill Waste Discharge Application 7295 Gold River Highway
New Licensing and Renewal Requirements
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
Pine cove pit time lapse drone photos
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Georgia Update Jeff Cown Land Protection Branch
Water Quality Rulemaking in Response to S.L
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
Evan Kane Division of Water Resources
The SAT will be given at ECHS on the dates below!
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
Meeting of Water Directors 2/3 December 2004
McDonald’s calendar 2007.
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Nikisi Lesufi Senior Executive Chamber of Mines
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Background Information on the Flambeau Mine

Source: Final Environmental Impact Statement, Flambeau Mining Company Copper Mine, March 1990

1995

How was contaminated water handled during the mining years?

Source: Final Environmental Impact Statement, Flambeau Mining Company Copper Mine, March 1990

1995

WDNR File Photo, May 1997

Source: Flambeau Mining Company, 2005 Annual Reclamation Report, November 2005

Source: Flambeau Mining Company, 2004 Annual Reclamation Report, November 2004

But What About the Water?

WRPC Graphic, adapted from Figure 6, Flambeau Certificate of Completion Stipulation Monitoring Work Plan, Foth, December 7, 2007

1995

Source: Biofilter Management Plan, Flambeau Mining Company, January 2007.

Source: Flambeau Certificate of Completion Stipulation Monitoring Work Plan, Foth, December 7, 2007

1995

WRPC Graphic utilizing FMC data on file with Wisconsin DNR Note: The indicated MCL for manganese of 230 μg/l (deep Precambrian) was specified in the Flambeau Mine Permit.

Location of Pit Monitoring Wells WRPC Graphic, created by overlaying various FMC figures on file with Wisconsin DNR. Note: Groundwater Vector overlay is taken from Figure 3-5, Final Environmental Impact Statement, Flambeau Mining Company Copper Mine, March 1990

1. Chambers & Zamzow Report, June 2009, p. 25

WRPC Graphic utilizing FMC data on file with Wisconsin DNR Note: The indicated MCL for manganese of 230 μg/l (deep Precambrian) was specified in the Flambeau Mine Permit.

WRPC Graphic utilizing FMC data on file with Wisconsin DNR

WRPC Graphic utilizing FMC data on file with Wisconsin DNR

How long will it take the Heavy Metals to come down? Flambeau Mine Permit Application, 1989, Appendix L

WRPC Graphic utilizing FMC data on file with Wisconsin DNR Note: The indicated MCL for manganese of 230 μg/l (deep Precambrian) was specified in the Flambeau Mine Permit.

WRPC Graphic utilizing FMC data on file with Wisconsin DNR Note: The indicated MCL for manganese of 230 μg/l (deep Precambrian) was specified in the Flambeau Mine Permit.

Flambeau River flood, September 1994; Photo by Bob Olsgard of Sarona, WI

Plaque on display at Flambeau Mine site during active mining years; Photo by Kira Henschel of Madison, WI, circa 1995

Source: Final Environmental Impact Statement, Flambeau Mining Company Copper Mine, March 1990

Chapter NR 182 METALLIC MINING WASTES NR Purpose. NR Applicability. NR Definitions. NR License periods and fees. NR General submittal requirements. NR Location criteria. NR Groundwater standards. NR Feasibility report. NR Plan of operation. NR Construction and completion reports. NR Minimum design and operation requirements. NR Inspections. NR Monitoring. NR Requirements for certified or registered laboratory. NR Recordkeeping and reporting. NR Closure. NR Financial responsibility for closure. NR Financial responsibility for long−term care. NR Waste management fund. NR Exemptions and modifications.

Location of Flambeau Mine Compliance Boundary WRPC Graphic, created by overlaying various FMC figures on file with Wisconsin DNR

Location of Flambeau Mine Intervention Boundary Well Nests WRPC Graphic, created by overlaying various FMC figures on file with Wisconsin DNR.

Source: Masinaigan, Summer 1999

What are the applicable water quality standards at the Flambeau Mine Intervention Boundary?

Flambeau Mine Permit Application, 1989, Appendix L

WRPC Graphic utilizing FMC data on file with Wisconsin DNR

Location of Flambeau Mine Compliance Boundary and the single Compliance Boundary Well Nest WRPC Graphic, created by overlaying various FMC figures on file with Wisconsin DNR

Chicago Tribune, August 30, 1991