What have we done? for Run9 around first collision ~2009/03/01 Kotaro Kijima Masaya Nihashi.

Slides:



Advertisements
Similar presentations
A1 Acoustic Rhinometer The following presentation gives an overview of the main functions of the A1Acoustic Rhinometer, it’s accessories and normal operational.
Advertisements

Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
PHENIX FLYING INTO NEW ERA Stefan Bathe, Time Meeting, April 27, 2010.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
Summary of Key Issues Examples of the following contained in the next series of slides: – Add new links and tab options – Move Customise box to bottom.
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
Recognize and Prevent Medication Diversion
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
Alarms and Events Processing Group No. 2 Project Guide: Prof. N.D.R.Sarma.
Database Design Concepts Info 1408 Lecture 2 An Introduction to Data Storage.
Database Design Concepts Info 1408 Lecture 2 An Introduction to Data Storage.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
Chapter 3 Balancing Costs and Benefits McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
DAY 21: MICROSOFT ACCESS – CHAPTER 5 MICROSOFT ACCESS – CHAPTER 6 MICROSOFT ACCESS – CHAPTER 7 Akhila Kondai October 30, 2013.
ONLINE CLAIMS TRACKING
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
The next slide shows a simplified diagram of the pulser. A capacitor is charged up to perhaps 10V. Switches T1 and T2 close. Some of the capacitor current.
Experimental determination of motor model parameters ETEC6419.
A right triangle is shown below. The triangle is dilated by a scale factor of 3.5 to create a new triangle. What is the area of the new triangle? A. 24.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
RICH upgrade simulation: updates RICH upgrade-software meeting 1 S.Easo.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
DAY 21: MICROSOFT ACCESS – CHAPTER 5 MICROSOFT ACCESS – CHAPTER 6 MICROSOFT ACCESS – CHAPTER 7 Aliya Farheen October 29,2015.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
Luminosity Monitoring Issues  ZDC  what’s the advantage?  problems  BBC  can they do it? A. Drees QCD critical point workshop, Mar
Triple GEM Beam Test within PHENIX DC Upgrades Meeting 4/14/04 B. Azmoun PHENIX Brookhaven National Lab.
Sequencers SQO,SQC,SQL.
Jan 7, 2002E. Gallas/Trigger Db1 Trigger Database and Trigger Configurations and Trigger Issues Elizabeth Gallas, Jeremy Simmons (Fermilab - Computing.
AEP ONCOR TNMP TDSP AMS Data Practices Summary TDSP_AMS Data Practices Summary.ppt CenterPoint.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Sequential Processing to Update a File Please use speaker notes for additional information!
BBC Readiness Report for p+p 2008 Jan.29th Misaki Ouchida, Kazuhisa Yamaura Hiroshima University.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 Report on PHENIX work in Apr/May/Jun Kotaro Kijima 大西洋~
Update on B-analysis Introduction Towards a definition of a limited set of plots for TDR, using all available data. Based on few general.
ArgonneResult_ ppt1 Comparison of data and simulation of Argonne Beam Test July 10, 2004 Tsunefumi Mizuno
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
ArgonneResult_ ppt1 Results of PoGO Argonne Beam Test PoGO Collaboration meeting at SLAC, February 7, 2004 Tsunefumi Mizuno
Laser Measurements (as comparison to test beam data) Florian Lütticke University of Bonn 9 th VXD Belle 2 Workshop Valencia,
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
HOW TO FIX MSVCR100. DLL IS MISSING ERROR? missing-error.
Monitoring Energy Gains Using the Double and Single Arm Compton Processes Yelena Prok PrimEx Collaboration Meeting March 18, 2006.
FIXED ETHERNET SWITCH COMPARISON TOOL (v6- presentation mode will activate tool) The information in this document is confidential to Juniper Networks.
Echo Curve Analysis and False Echo Mapping
P2P Module: Ariba P2P INVOICING
INVESTIGATION of noise in amplifiers operating in gain compression
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Calibration Status of the art – the first tTrig calculated from data
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
HFRadMon. Status and Performance.
23 Barrel chambers and 12 Endcap chambers
EMCal Recalibration Check
EMCal Recalibration Check
Load-Pull Measurements
Status report Minjung Kim
Equipment Tests for DHC Tower
Problems with the Run4 Preliminary Phi->KK Analysis
Laser Software Status and Comments on Concerns
23 Barrel chambers and 12 Endcap chambers
Thursday
Presentation transcript:

What have we done? for Run9 around first collision ~2009/03/01 Kotaro Kijima Masaya Nihashi

2 Time Table After first collision, what we have done is shown in this slides. 02/24 # First collision 02/25 AM9 # (EVENTDATA) For HV decision 2/25 PM10 IR Access Switch board ID 1  6 2/26 18:54~ NEW HV applied 02/27 AM6 # (EVENTDATA) For LUT 02/28 15:26~ LUT Update 2009/01/21 Received FEM#6 from Chi DATE FEM board ID problem BBLL1 Masked for 8ch ( ) [2/25.16:xx ~ 2/26.9:50]

3 Board ID FEM board #6 was repaired by Chi in Janualy. Then, the DIP switch was reset from “6” to “1” for the Test. But after the test, it was not switched back it… We found this problem around 2/24. This problem affect BBCLL1 trigger too. I would like to mention that the data is able to correctly read if we don’t use “bbcEvent” class. At 2/25 night, we access to IR with John Haggerty and Jimmy, to switch back DIP switch to “6”. After that, we can see board ID “6” in PRDF!! should be “6”, not “1” in PRDF file Fixed! DIP switch

4 Operational HV for +- field At first of Run9, CM(+-) Magnetic field is operating. We calculated new operational group HV value for +- field as 30pC/MIP HV for inner ring. The gain curve was obtained by laser data. But then, magnetic field was not operated. So, we assume that gain curve (shape) dose not vary so much by magnetic field. To calculate operational group HV, we used pC/MIP obtained by run

5 Comparison of pC/MIP expected and measured We can calculated Expected pC/MIP value from gain curve when we will applied New group HV. # was applied new HV. It is consistent within 5% between expected and measured value. We decided to operate this new HV for Run9 +- field. You can see the monhisto of # at – u.ac.jp/phx/bnl/calibration/rundep/RUN9/Calibrat orOut/PN/BbcCalib_272627/monhist_ pdfhttp:// u.ac.jp/phx/bnl/calibration/rundep/RUN9/Calibrat orOut/PN/BbcCalib_272627/monhist_ pdf (Measured – Expected) / Expected pC/MIP Red: Measured (#272627) Blue: Expected

6 Operational HV for +- field (30, 40pC/MIP HV) HV_BB_S HV_BB_S HV_BB_S HV_BB_S HV_BB_S HV_BB_S HV_BB_S HV_BB_S HV_BB_N HV_BB_N HV_BB_N HV_BB_N HV_BB_N HV_BB_N HV_BB_N HV_BB_N The operational HV was calculated by using pC/MIP obtained from # S3,S7,N3,N7(inner) are applied 30pC/MIP HV, others are applied 40pC/MIP HV. Valid 2/26 18:54~, #272619[EVENTDATA]~

7 run LUT ver.0 is used. applied NEW HV Bbctree is located at /w11/BBC/Run9/calib/BbcCalib_272627

8 LUT version1 for +- field Making new LUT –Used # –Updated BbcCalib.config New HV value –Bbc.offset: -0.57[cm] Same as Run8 Valid Range –2009/02/28 15:26~ Please see below about LUT version – u.ac.jp/phx/bnl/calibration/DB/run9_LUT.htmlhttp:// u.ac.jp/phx/bnl/calibration/DB/run9_LUT.html Input: bbctree_ root

9 run LUT ver.1 is used. Constant of online motor are also updated. It is seems like GOOD. ONLY BBLL1 trigger is enabled. So far latest run

10 summary What we have done is following –board ID problem was fixed –new HV for +- field was calculated and applied –LUT was updated –constants of online monitor were also updated We will update DB soon.

11

12 time_reso vs pmtgain