2007 TRB Planning Application Conference D ELDOT S TATEWIDE E VACUATION M ODEL.

Slides:



Advertisements
Similar presentations
THURSTON REGION MULTIMODAL TRAVEL DEMAND FORECASTING MODEL IMPLEMENTATION IN EMME/2 - Presentation at the 15th International EMME/2 Users Group Conference.
Advertisements

Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
1 Innovative Tools October 27, 2011 Chi Mai. 2 Presentation Overview VISSIM Corridors VISSIM Protocol Hours of Congestion.
Jeannie Wu, Planner Sep  Background  Model Review  Model Function  Model Structure  Transportation System  Model Interface  Model Output.
ISTEA is Now 20 Years Old and We are Still Searching for the Land Use-Transportation Connection. Actually, Analysis of that Connection Has Been Sought.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
MISSISSIPPI CONTRAFLOW OPERATIONS Providing the State of Louisiana Assistance during the Hurricane Emergency Evacuation of New Orleans Bob Chapman Emergency.
TRB Planning Applications Conference Development of Hurricane Rita Evacuation Trip Tables for the Houston-Galveston Region Jim D. Benson, Texas Transportation.
Household-Level Model for Hurricane Evacuation Destination Type Choice Using Hurricane Ivan Data Rodrigo Mesa-Arango, Samiul Hasan, Satish V. Ukkusuri,
ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation GPA Conference Fall 2012 Presented By: David Pickworth,
Simpson County Travel Demand Model July 22, 2003.
12th TRB National Transportation Planning Applications Conference
What is the Model??? A Primer on Transportation Demand Forecasting Models Shawn Turner Theo Petritsch Keith Lovan Lisa Aultman-Hall.
HEADS UP H urricane E vacuation A nalysis and D ecision S upport U tility P rogram.
A GIS Approach to Pedestrian Level of Service Natalia Domarad 14th TRB Transportation Planning Applications Conference Columbus, Ohio May 5-9, 2013.
Session 11: Model Calibration, Validation, and Reasonableness Checks
Estimating Congestion Costs Using a Transportation Demand Model of Edmonton, Canada C.R. Blaschuk Institute for Advanced Policy Research University of.
15 th TRB Planning Applications Conference Atlantic City, New Jersey Joyoung Lee, New Jersey Institute of Technology Byungkyu Brian Park, University.
Planning Applications: A City- wide Microsimulation Model for Virginia Beach Craig Jordan, Old Dominion University Mecit Cetin, Old Dominion University.
14-April Univ of Delaware Philadelphia Engineer District 1 DESTINATIONS OF EVACUATING VACATIONERS - WHERE IS HOME? - WHAT DAY OF THE WEEK IS IT? - STORM.
Automatic loading of inputs for Real Time Evacuation Scenario Simulations: evaluation using mesoscopic models Josep M. Aymamí 15th TRB National Transportation.
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
May 2009 Evaluation of Time-of- Day Fare Changes for Washington State Ferries Prepared for: TRB Transportation Planning Applications Conference.
An Empirical Comparison of Microscopic and Mesoscopic Traffic Simulation Paradigms Ramachandran Balakrishna Daniel Morgan Qi Yang Caliper Corporation 14.
FOCUS MODEL OVERVIEW CLASS FIVE Denver Regional Council of Governments July27, 2011.
Source: NHI course on Travel Demand Forecasting (152054A) Session 10 Traffic (Trip) Assignment Trip Generation Trip Distribution Transit Estimation & Mode.
Regional Traffic Monitoring System for Maryland’s Eastern Shore Dr. Gang-Len Chang Traffic Safety and Operations Lab University of Maryland, College Park.
15 th TRB Transportation Planning Applications Conference Tuesday, May 19 th, 2015 – Atlantic City, NJ Integrating Travel Demand Models & SHRP2 C11 Tools:
May 2007 Developing a Walk-Out Evacuation Plan for Washington, DC TRB National Transportation Planning Applications Conference by Phil Shapiro, VHB.
RCPG Project Update 2013 Whole Community Conference November 22, 2013.
Keir Opie National Center for Transportation and Industrial Productivity (NCTIP) New Jersey Institute of Technology (NJIT) Paramics North American User.
June 15, 2010 For the Missoula Metropolitan Planning Organization Travel Modeling
Maps help us get to know Delaware.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
Module 1 A Nationally Emerging Practice Introduction to Roundabouts Roundabouts in the United States.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
Analysis of a Multimodal Light Rail Corridor using an Activity-Based Microsimulation Framework S. Ellie Volosin & Ram M. Pendyala, Arizona State University,
Hcm 2010: work zones.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco’s Dynamic Traffic Assignment Model Background SFCTA DTA Model Peer Review Panel Meeting July.
2007 TRB Transportation Planning Applications Conference – Daytona Beach, Florida Pseudo Dynamic Traffic Assignment A Duration Based Static Assignment.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Integrated Macro-Micro Highway Demand/Operational Analysis Case Study: Cross Bronx Expressway Corridor, Bronx, NY Presented at the 15 th TRB Transportation.
Dynamic Origin-Destination Trip Table Estimation for Transportation Planning Ramachandran Balakrishna Caliper Corporation 11 th TRB National Transportation.
S. Erdogan 1, K. Patnam 2, X. Zhou 3, F.D. Ducca 4, S. Mahapatra 5, Z. Deng 6, J. Liu 7 1, 4, 6 University of Maryland, National Center for Smart Growth.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Presented by: Pascal Volet, ing. City of Montreal TRB Technical Conference May 9, 2007 A Multi-resolution Modelling Framework in the Montréal Area A Multi-resolution.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Integrated Travel Demand Model Challenges and Successes Tim Padgett, P.E., Kimley-Horn Scott Thomson, P.E., KYTC Saleem Salameh, Ph.D., P.E., KYOVA IPC.
Calibrating Model Speeds, Capacities, and Volume Delay Functions Using Local Data SE Florida FSUTMS Users Group Meeting February 6, 2009 Dean Lawrence.
Forecasting and Evaluating Network Growth David Levinson Norah Montes de Oca Feng Xie.
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
August 20, 2015 Transportation Analysis Meeting 2015 Update Tampa Bay Region Roberto O. Miquel, AICP.
DVRPC TMIP Peer Review Dynamic Traffic Assignment (DTA) Oct. 29 th, 2014.
Taking a Walk: Modeling Pedestrians and Bicycles at the Street Level 15th TRB National Transportation Planning Applications Conference May Atlantic.
Comparative Analysis of Traffic and Revenue Risks Associated with Priced Facilities 14 th TRB National Transportation Planning Applications Conference.
1 Methods to Assess Land Use and Transportation Balance By Carlos A. Alba May 2007.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
Ephemeral Network Broker to Facilitate Future Mobility Business Models/Transactions A collaboration between Ford University Research Program and University.
Best Practices for Collecting Counts and Risk Evaluation for Bicyclists and Pedestrians Krista Nordback, P.E., Ph.D., PSU Taylor Phillips, PSU Mike Sellinger,
EMERGENCY MANAGEMENT WARRANDYTE COMMUNITY FORUM, 12 NOV 2015 TRAFFIC MODELLING.
Urban Planning Group Implementation of a Model of Dynamic Activity- Travel Rescheduling Decisions: An Agent-Based Micro-Simulation Framework Theo Arentze,
Travel Demand Forecasting: Traffic Assignment CE331 Transportation Engineering.
1 Benefits of ITS During Hurricane Evacuations Hurricane Evacuation Transportation Workshop April 5, 2003.
Evaluation of Hard Shoulder vs
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Jim Henricksen, MnDOT Steve Ruegg, WSP
Ventura County Traffic Model (VCTM) VCTC Update
2010 Hurricane Season Update
Application of a Macro Based Capacity Constraint Assignment Technique
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Presentation transcript:

2007 TRB Planning Application Conference D ELDOT S TATEWIDE E VACUATION M ODEL

BACKGROUND In 2006 the Delaware Department of Transportation began updating hurricane evacuation plans for Sussex, Kent, and New Castle Counties. They wanted to develop estimates for the durations of evacuations within each of these counties.

Need for Evacuation Planning  Delaware is located on the Delmarva Peninsula, situated between the Atlantic Ocean, Delaware Bay, and Chesapeake Bay  Their prime beach areas are located about 2 ½ hours from Washington, D.C. and Baltimore, MD BACKGROUND

Need for Evacuation Planning Two of the primary routes on and off of the Peninsula are bridges susceptible to congestion and closure during storm events. BACKGROUND Photo by Scott Kozel

BACKGROUND Need for Evacuation Planning Fortunately, Delaware does not have much history of large-scale evacuations and not much documentation of how long it would take to evacuate.

Background Today we will use a Sussex County evacuation as a case study.

BACKGROUND Need for Evacuation Planning  Over 50% of the Sussex County Summer Population are not full-time residents  Sussex County has no multi-lane east-west roadways and no limited-access highways

BACKGROUND The Delaware Department of Transportation set out to develop a model that would estimate the evacuation durations of different “what would happen if…” scenarios based on:  Behavioral Assumptions  Policy Decisions  Operational Assumptions

BACKGROUND – Behavioral Assumptions  At what pace do people evacuate?  How many people evacuate?  Where would people evacuate to?

BACKGROUND – Behavioral Assumptions At what pace to people evacuate?

BACKGROUND – Behavioral Assumptions How many people evacuate? A 2003 report by the US Army Corps of Engineers estimates that:  Between 45% and 80% of full-time residents would evacuate if ordered to  Between 90% and 95% of vacationers would evacuate if ordered to  Between 65% and 70% of the vehicles available to Evacuating Households would evacuate

BACKGROUND – Behavioral Assumptions Where do they evacuate to? Full-Time Residents  20% stay in their neighborhood  25% would evacuate within Sussex County  25% would stay on the Delmarva Peninsula  30% would evacuate off the Delmarva Peninsula Vacationers  90% would return home

BACKGROUND – Behavioral Assumptions Where do they evacuate to?  35% to Northern Delaware  22% to Western Sussex County  15% to Bay Bridge  11% to I-95 West  9% to I-95 East

BACKGROUND Policy Decisions  When should the evacuation be declared?  Should a “State of Emergency” be declared?

BACKGROUND Operational Assumptions Should the operational plan be implemented?

CHOOSING A MODEL Traditional Approaches  Spreadsheets  Regional Travel Demand Models  Simulation Models

CHOOSING A MODEL Spreadsheets  Benefits: Easily explainable Relatively easy to implement  Drawbacks: Difficult to implement at a large scale Difficult to account for specific operations plans Difficult to estimate where evacuators go Difficult to account for background congestion

CHOOSING A MODEL Regional Travel Demand Model  Benefits: Readily available framework from DelDOT’s Statewide Model Easy to implement statewide Easy to account for background congestion  Drawbacks: Difficult to account for spillover Difficult to account for specific operations plans

Simulation Model  Benefits: Easy to account for specific operations plans Easy to account for spillover  Drawbacks: Difficult to implement statewide Intensive calibration process Must estimate trip table externally CHOOSING A MODEL

MODEL DEVELOPMENT DelDOT chose to use their Statewide Travel Demand Model because of its geographic coverage and ease of implementation.

DelDOT’s Peninsula Model  AADT and peak tourist season assignments  Encompasses Delaware + Maryland’s Eastern Shore (9 Counties)  Covers a population of 1,209,944  Area of 5,375 miles 2 MODEL DEVELOPMENT

Evacuation Model  Capacity constrained model with hourly traffic assignments.  Accounts for the specific traffic control in place at intersections (signals, stop signs, roundabouts). MODEL DEVELOPMENT

Evacuation Model  10 groups of “evacuation zones” and “destination zones” can be specified.  Specify evacuation start time  Model road closures during evacuation  Track spillover between hours  Input the pace of evacuation  Input the percentage of vehicles evacuated  Specify a “State of Emergency” for groups of zones MODEL DEVELOPMENT

Evacuation Model  Trip Generation  Background Assignment  Evacuation Trip Distribution  Evacuation Trip Assignment MODEL DEVELOPMENT

Trip Generation  Uses peak tourist season trip table from Peninsula Model  Determines background trip tables for 96 hours  Determines the number of vehicles in evacuating households (full-time and part-time)  Determines how many vehicles evacuate based on an input assumption (approximately 70% based on US Army Corps of Engineers) MODEL DEVELOPMENT

Background Traffic Assignment  Assigns non-evacuation trips to the network for 96 hours from the start of the evacuation.  Accounts for “State of Emergency” assumption. MODEL DEVELOPMENT

Evacuation Trip Distribution  Uses specified departure curves and specified evacuation and destination areas.  Uses doubly constrained logit distribution model to determine hourly evacuation trip tables for 30 hours of evacuation. MODEL DEVELOPMENT

MODEL DEVELOPMENT – Evacuation Assignment Assign hourly evacuation trip tables to loaded hourly background traffic networks.  Check for Capacity Constraint.  Spill over-capacity trips to subsequent hours.

MODEL DEVELOPMENT – Evacuation Assignment Excess Trips spillover to next hour Assign Subsequent Hour Background trips to spillover network Determine Operating Capacity (Jam Density) Assign Hour 1 Evac. Trips Check roads where volume exceeds Capacity Assign Hour 2 Evac. Trips to Spillover Network Determine Operating Capacity (Jam Density) Check roads where volume exceeds Capacity

Case Study 1 Parameters  50% of non-evacuation traffic in Sussex County stays home  70% of vehicles in Sussex County Beaches evacuate  Fast evacuation (all evacuees depart within 13 hours)  Operational Plan is Implemented  Evacuation is ordered at 6:00 AM  8% of evacuees depart prior to the order, beginning at midnight

Case Study 2 Parameters Same as Case Study 1 except with Ocean City, MD evacuation

Case Study Results US 113 North of Georgetown SR 26 East of Dagsboro

Order at 6:00 AM (2% Evacuating) Evacuation Trips Exceed Capacity at 11:00 AM (12% Evacuating) Majority of Evacuation Complete 4:00 PM (10% Evacuating) Evacuation Complete 7:00 PM Case Study 1 US 113 Northbound – North of Georgetown

Case Study 2 US 113 Northbound – North of Georgetown Order at 6:00 AM (2% Evacuating) Evacuation Trips Exceed Capacity at 6:00 AM (2% Evacuating) Majority of Evacuation Complete 4:00 PM (10% Evacuating) Evacuation Complete 7:00 PM

Case Study 1 SR 26 Westbound – East of Dagsboro Order at 6:00 AM (2% Evacuating) Evacuation Trips Exceed Capacity at Noon (12% Evacuating) Majority of Evacuation Complete 4:00 PM (10% Evacuating) Evacuation Complete 7:00 PM

Case Study 2 SR 26 Westbound – East of Dagsboro Order at 6:00 AM (2% Evacuating) Evacuation Trips Exceed Capacity at 8:00 AM (5% Evacuating) Majority of Evacuation Complete 4:00 PM (10% Evacuating) Evacuation Complete 7:00 PM

Case Study 1 Evacuation Volumes by Time of Day Evacuation at 2:00 am (1%) Evacuation at 8:00 am (5%)

Case Study 2 Evacuation Volumes by Time of Day Evacuation at 2:00 am (1%) Evacuation at 8:00 am (5%)

Case Study 1 Evacuation Volumes by Time of Day Evacuation at Noon (12%) Evacuation at 5:00 pm (2%)

Case Study 2 Evacuation Volumes by Time of Day Evacuation at Noon (12%) Evacuation at 5:00 pm (2%)

Case Study Results  Case Study 1 Evacuation duration is 14 hours  Case Study 2 Evacuation duration is 21 hours

Conclusions  The model would be easily applied to any situation where capacity constrained traffic assignments would be beneficial (ex. Event Planning, Major Roadway Construction)  The model would be easily modified to estimate non- hurricane evacuations

Next Steps  Continue Working with DelDOT to Refine Evacuation Scenarios  Test Road and Bridge Closures Due to Storm Events  Continue to Improve Reporting Capabilities

Questions? Scott Thompson-Graves, PE, PTOE Laura Rice, PE Mike DuRoss