Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

FDOT District 6 ITS Project Update Manuel Fontan, E.I. ITS Project Manager.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
ITS Application of advanced sensor, computer, electronics, and communications technologies and management strategies in an integrated manner providing.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
 Definition  Goals  Elements  Roles and Responsibilities  Accomplishments.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Traffic Incident Management (TIM) Mark Meints NDOR Emergency Program Specialist.
Presented by: SAGE KAMIYA, P.E., PTOE
Road Ranger Basic Training RELOCATING VEHICLES. Road Ranger Basic Training INTRODUCTION Keep travel lanes open and traffic moving Important Road Ranger.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Road Ranger Orientation. What is your Job or Scope of Services Move vehicles from travel lanes (disabled or involved in accidents). Unless injuries are.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
National Road Pricing Conference June 4, 2010 Ginger Goodin, Texas Transportation Institute Greg Jones, Federal Highway Administration.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
ITS America 2007 Annual Meeting Session 41 Traffic Incident Management A Top-Down Vision Charles E. Wallace, Ph.D., P.E.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Md Sakoat Hossan, Research Assistant Xia Jin, PhD, Assistant Professor A Comprehensive Framework for Traffic Incident Management Program Planning and Assessment.
2 Governor’s IT3 Study identified four strategies under better Demand Management. Expanded support for employer-based initiatives Expanded support for.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Prepared by the TIME Task Force Operations Committee 1 T.I.M. TEAMS T.I.M. TEAMS TIM Traffic Incident Management Team.
Module 8 Tabletop Case Exercises MOT Training for Incident Responders in Florida.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
Benefit-Cost Analysis of the SMART SunGuide Operations in Fort Lauderdale, Florida June 2006 Steve Corbin District ITS Operations Manager FDOT District.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Traffic Incident Management F/Lt. Monica Yesh Post Commander, Metro South Michigan State Police.
MODULE 4 Traffic Incident Management and The Road Ranger/TMC Operator
Getting Results from Regional Traffic Incident Management Teams Southwest Florida T I M Teams Collier - Lee - Charlotte and Sarasota - Manatee.
Keeping You Moving. Work Zones Original Maintenance of Traffic.
Florida Traffic Incident Management Performance Measures Paul Clark – Florida DOT Traffic Incident Management and Road Ranger Program Manager.
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
I-95 Managed Lanes CORSIM Analysis Status Meeting Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Road Ranger / TMC Operator Joint Training Module 91 Module 9 RELOCATING VEHICLES.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
Transpo 2012 Yan Xiao, Mohammed Hadi, Maria Lucia Rojas Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida.
Orlando-Orange County Expressway Authority Update L.A. Griffin Manager of Expressway Operations March 20, 2008.
Brian Kary Minnesota Department of Transportation.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Work Zone & Incident Management Strategies Denise Markow, PE, TSMO Administrator Susan Soucie, PE ITS Project Manager ACEC/NHDOT 2016 Technical Exchange.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
Emergency Shoulder Use for Evacuations
Integrating Transit and Highway Solutions In High Volume Corridors
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
FDOT Emergency Shoulder Use (ESU) & One-Way Corridors
Florida Transportation Commission FY 2009
Focus State Initiative: TIM Performance Measures
PROJ. 566(17) LOR PID MAJOR WIDENING
MODULE 2: TSMO Strategies
MOT Training for Incident Responders in Florida
MODULE 2: TSMO Strategies
Interstate 95 Corridor Improvement Plan
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District Six Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District Six 95 Express & Ramp Metering Miami, Florida

 Phase 1 Complete  NB – Dec. 2008; SB – Jan  HOV to HOT Conversion  1 HOV Lane 2 Express Lanes  Congestion-Priced Tolling  Ramp Signaling  Express Lanes Operations FY 11/12  62,700 Average Weekday Trips  57 MPH (NB)  62 MPH (SB)  1,693 Closure Events in EL Phase 1 is complete and Phase 2 will be completed during the next 2-3 years. Legend Phase 1a Phase 2 Phase 1b Fort Lauderdale Miami GGI 2 Project Overview Scope

3 Incident Management Plan Development  Operational Risk Assessment  Incident Management Workshops  Follow-up Meetings with Agency Partners  Developed protocols/agreements  Developed quick clearance procedures  Video sharing opportunities  Updated for Phase 1B (SB) Opening FDOT District Six Team held numerous workshops in preparation for project launch.

4 Incident Management Plan - Resources: TMC Operators  TMC 95 Express Lane Operators  Specially Trained EL procedures  Central Contact Point for Agency Coordination & Dispatchers for Incident Response Operators Express Lanes Operators needed to evolve from traffic managers to travel demand managers.

5 Incident Management Plan - Resources: Road Rangers  I-95 Road Ranger Service Patrol  Specially Trained  Staged Flatbed Tow Trucks, North & South Ends  Weekday o Daytime – 7 RR; Nighttime – 4 RR  Weekend o Daytime – 4 RR; Nighttime – 4 RR Road Rangers are staged along I-95 for faster response and clearance.

6 Incident Management Plan - Resources: Others  Additional Incident Responders  Additional FHP Trooper (6am – 10pm, M-F)  Incident Response Operators (5:30am to 9:30pm, M-F) o Coordinates FDOT resources o Specially Trained  Incident Response Vehicles o Specially Equipped IRV Truck o Flatbed Tow Truck Incident Managers work together to clear event along northbound I-95.

7 Incident Management Plan - Resources: Outreach & Training  Multi-Agency Coordination  One-on-One Meetings  Post Incident Analysis  Multi-Agency Training; MOT, Procedures  Recurring Effort

8 Incident Management Plan Procedures  Road Rangers  FHP support for Road Rangers to cross double white lines and delineators for incidents  Disabled Vehicles  Quickly/safely relocated to designated area  Abandoned Vehicles  Expedite logging the initial discovery  FHP Trooper “sweeps” the 95 EL daily Procedures were developed to ensure efficiency and safety on the field.

9 Incident Management Plan Procedures  Staging  Strategic Locations o 5AM – 1 PM: Park & Ride Lot, 95 Street SB On-Ramp o 1PM – 9PM: Park & Ride Lot, SR 112 Toll Plaza o 9PM – 5AM: Park & Ride Lot  Relocation  Crash Investigations  Motorist Assistance Park & Ride Lot Staging Area SR 112 Toll Plaza Staging Area

10 Incident Management Plan Procedures  Closure Procedures  Less than 30 minutes – Post “Closed”  30 to 60 minutes – Road Rangers  60 minutes plus – Asset Maintenance Contractor  DMS Strategies  MOT Resources

11 Incident Management Plan Procedures  Developed New MOT Plans  Within EL  Redirection  Buses IRV RR CRASH Remove Delineators Daily Average 0.6

Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Joe Snyder, FDOT District Six TMC Manager, AECOM Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Joe Snyder, FDOT District Six TMC Manager, AECOM Ramp Metering for Incident Management Miami, Florida

13 Ramp Metering - Overview  Ramp Signals  Regulate Ramp Traffic; Improve Highway Flow  Support Incident Management Efforts  Follow 95 Express Project Limits; 12 SB; 10 NB  Dedicated CCTVs for Operations, Ramp Monitoring Diagram of Ramp Metering System Components Video of Ramp Metering in Action

14 Ramp Metering - Operations  Typical Operation Timeframes o NB -PM Peak (3:00 p.m. - 7:00 p.m.) o SB -AM Peak (6:30 a.m. -10:00 a.m.)  Ramp Signal Operations is Subject to Traffic Conditions o Incident Management  Resources o Two Dedicated Operators o One Engineering Supervisor o 30+ Dedicated CCTVs

15 Ramp Metering - Operations * Dedicated CCTV for Operations SignalOverviewIntersection

Effect of Ramp Signal Operation during Special Event Marlins Baseball Game on Monday April 02, :50 PM I-95 Southbound No Congestion I-95 N OF NW 151 ST I-95 N OF NW 32 ST Express Lane Average Speed General Purpose Lane Average Speed Threshold Speed (50 mph)

17 Effect of Ramp Signal Operation during Special Event Marlins Baseball Game on Monday April 02, :53 PM Congestion Started to Develop I-95 Southbound I-95 N OF NW 151 ST I-95 N OF NW 32 ST Express Lane Average Speed General Purpose Lane Average Speed Threshold Speed (50 mph)

18 Effect of Ramp Signal Operation during Special Event Marlins Baseball Game on Monday April 02, :10 PM Congestion I-95 N OF NW 151 ST I-95 N OF NW 32 ST I-95 Southbound Express Lane Average Speed General Purpose Lane Average Speed Threshold Speed (50 mph)

19 Effect of Ramp Signal Operation during Special Event Marlins Baseball Game on Monday April 02, :15 PM Ramp Signal were turned on I-95 N OF NW 151 ST I-95 N OF NW 32 ST I-95 Southbound Express Lane Average Speed General Purpose Lane Average Speed Threshold Speed (50 mph) I-95 Southbound RMS 15RMS 16 RMS 17 RMS 18 RMS 19RMS 20 RMS 22 RMS 21 Sample of Operation Express Lane Average Speed General Purpose Lane Average Speed Threshold Speed (50 mph)

20 Effect of Ramp Signal Operation during Special Event Marlins Baseball Game on Monday April 02, :25 PM Ramp Signals under Operation: Congestion Dissipated I-95 Southbound I-95 N OF NW 151 ST I-95 N OF NW 32 ST Express Lane Average Speed General Purpose Lane Average Speed Threshold Speed (50 mph)

21 Results – FY 11/12  EL Closed due to Incidents 2% of time  Travel Lanes Blockage Duration  Express Lanes: 14 min NB, 13 min SB  District wide: 27 min  Volumes Increased 5% NB, 7% SB  50 Million Trips  95 Express Transit Usage Increased 32% The Incident Management Plan has contributed to the overall success of 95 Express.

Questions 22 Thank you, Javier Rodriguez, PE, FDOT District Six Intelligent Transportation Systems Operations Engineer Joe Snyder, FDOT District Six TMC Manager, AECOM; Safety First: Buzzed Driving is Drunk Driving!