MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

AIM Enterprise Central Site Planning
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
Authoring Instructional Materials (AIM)
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM Toolset Interfaces with Authoritative Technical Data
1 AIM/CPM Pilot Project Status Report 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Roy Hoyt & Leslie Desenburg, NETC N74.
Authoring Instructional Materials (AIM)
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
AIM FRB Briefing Jerry Benzel Contractor Support to NAVSEA 07TR3 (202)
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Systems Engineering in a System of Systems Context
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
TELEStraining Inc. The eTrainerCB: Using Instructional Templates To Create Training SCO’s Lucio Teles, Ph.D., President, TELEStraining Inc. Fuchun Xiao,
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1. Report status of traditional and modernized AIM
Lessons Learned from NETPDTC Central Site Implementations Lessons Learned from NETPDTC Central Site Implementations 23 Aug 11 Peg David, NETPDTC Project.
NETC N6 Status Update to AIM FRB 18 Sep 12 Bruce Bare, NETC, N62 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Adoption of Commercial EDI Standards for DoD Logistics Business Transactions Integrated Product Team (EDI IPT) – Expanded DEFENSE LOGISTICS AGENCY Report.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETPDTC AIM Central Site and CPM Hosting 4-6 May 2010 Bruce Bare, NETC, CIO Denise Green, CNATT, N6 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.
1 NETC N7 Status Update to AIM FRB 4 November 2009 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Role of Account Management at ERCOT Nodal Training – Update Pamela Dautel April 10, 2006 Market Education.
ISA 201 Intermediate Information Systems Acquisition
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Presentation transcript:

MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team

Overview MT Continuum overview Application to other communities Project status Lessons learned for other NETC communities SSP Electronic Classroom Control Software Change

MT Continuum Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE-conformant Instructor Led (ILT) and Interactive Multimedia Instruction (IMI) segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: – SSP - Requirements Owners, Afloat Delivery System – Contractor team – ILT development, IMI Storyboard development, SMEs – NAWCTSD / AIM team - CPM/LO Module support – NUWC – LMS (Seaware) – LSI, Inc. - ISD and IMI design/development – CFS – CM/QA agent for SSP – Fleet – SMEs

Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections and design of IMI lessons/sections as well as definition of new JDTA/LO Module versioning concepts Integrated development and maintenance environment for blended, SCORM and 136-compliant learning content Bi-directional interface between LO Module and LSI Venus.net CBT toolset for IMI development/maint.

Project Status Plan, Analyze and Design Completed – JDTA – Establishment of initial 3 major projects – Revised 9-project structure Approval of learning objectives Ongoing development of ISD considerations elements as part of script-storyboard effort Development (production) Phase underway 15 May 11 – 9 projects exported from CPM to LO Module for production development in AIM I Rel 5.0 on fedsun – SWS AIM I instance in production at NETPDTC

Lessons Learned for Other NETC Communities Completion of supporting documentation in Design Phase is crucial – (IMDP, Learning Objectives, Process Documents) Establish standard for estimating TTT in Design Phase Establish change request process in Design Phase Development IMS/POA&M– crucial to support reviews Storyboard Training – Consider Learning Curve for Storyboarding in the LOM

SSP Electronic Classroom Control Software Change Background – The introduction of electronic documentation in the early 2000’s saw the migration of a majority of paper Instructor Guides (IGs) to electronic Lesson Plans (LPs). This required the introduction of tools (TechSight) necessary to access, present and view them – Classroom Control (software) – In 2005 the CCS tool of choice (TechSight) was experiencing obsolescence issues. A replacement product “Elite” was selected (to address these issues) for evaluation and after some modifications for use.

SSP Electronic Classroom Control Software Change (contd) Evolving requirements and obsolescence issues are forcing a Classroom Control Software change. Some of these but not all: – Policy DODI Embedded training and distributed learning shall be considered as the first option. OPNAVINST A – Navy Training Systems Requirement Acquisition and Management DoD directive M – Information Assurance – Standards SCORM 2004 HTML 5, XML – Software Applications – I.E., Flash, MS Office, Java 6.4… Operating Systems (OS) - Windows 7, 64 Bit, Windows Server bit

SSP Electronic Classroom Control Software Change (contd) Approach – Identify and correct issues in the areas of Policy, Standards and Software in an update to the CCS tool or in the development of a new (CCS) tool. Options – SSP has identified 3 potential options to address this approach: Update Current CCS (Elite) Develop New CCS Integrate CCS Software into LMS

SSP Electronic Classroom Control Software Change (contd) Option 1: Update Current CCS (Elite) –Pros Update can be incremental Low schedule risk –Cons Cost Proprietary Risk may drive redesign Retains unused legacy capabilities

Option 2: Develop New CCS –Pros Develop to Software requirements Develop to Standards Develop to Policies –Cons Cost Schedule Unknown Risks SSP Electronic Classroom Control Software Change (contd)

Option 3: Integrate CCS into the LMS –Pros Update can be incremental Low schedule risk – LMS Development efforts underway –Initial feedback indicates a 24 month development effort Develop to Software requirements Develop to Standards Develop to Policies –Cons Cost Schedule Unknown Risks SSP Electronic Classroom Control Software Change (contd)

Questions?

Backup Slides

15 Modernized AIM Modernized AIM can tie the entire process together Modernized AIM can tie the entire process together

MT Continuum Process 16