UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

Guidelines for Basic Geographic Data DA AIP Phase 2 Kickoff Workshop September 25-26, 2008 Boulder, Colorado, USA Yoshikazu FUKUSHIMA Secretariat.
The IEEE Committee on Earth Observation Dr. Jay Pearlman, Chair Dr. Tom Wiener, Chair elect November 15, 2007.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Energy Task Ellsworth LeDrew, Point of Contact, GEOSS Energy, Thierry Ranchin, Co-chair, Renewable Energy Community of Practice, Marion Schroedter-Homscheidt,
CBC 7 Report to June C4. Discussions in Meeting Next CBC Meeting Coordination with Committees GCI Work Plan Progress Development of 2009 – 2011 Work Plan.
Overview of Capacity Building Committee Activities GEO Capacity Building Committee Meeting Brussels – 14 September 2006 Errol Levy DG Research – European.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
User Interface Mechanism GEO GEO-I Meeting Ad Hoc User Interface Workgroup May 2005 Geneva.
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
GEO User Interface Committee Membership Discussion Lawrence Friedl, UIC Member Representative from USA (NASA) 13 th UIC Meeting Washington, DC USA 15-September-2009.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
ID-06 Building a User-Driven GEOSS Essential Components of User Management for GEO Tasks.
Standards and Interoperability Forum: Status, Issues & Plans GEO Architecture and Data Committee Kyoto, Japan 9 February 2009 Siri-Jodha Singh Khalsa.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
ID-04 Building Communities and Increasing Awareness & ID-06 (proposed) Building a user-driven GEOSS.
Report from the 7th GEO S&T Committee Meeting Gilles OLLIER – Policy Officer « Earth Observation » EUROPEAN COMMISSION Research Directorate General - Environment.
UIC Report to the GEO-VI Plenary: Accomplishments, Activities, and Recommendations November, 2009 The UIC Co-Chairs Ellsworth LeDrew, IEEE Carsten.
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
IGOS-P 15 and GEO Achievements planning meeting in May 2008 at UNESCO, Paris Report to 4 th C4, 17&
Earth Sciences Sector Canada Centre for Remote Sensing The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Francesco Pignatelli,
Draft Report on STC-7 Geneva 22/23 May Udo Gärtner, co-chair STC.
GEOSS Data Sharing Principles Alan Edwards European Commission Report to Capacity Building Committee May 22, 2008.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
ADC Meeting Summary Geneva, May 2008 Alessandro Annoni, JRC Jay Pearlman, IEEE Report to Capacity Building Committee May 22, 2008.
4th Committee Co-Chairs Coordination (C4) Meeting Geneva, June 2008 Reflection on the role of the Science and Technology Committee Gilles OLLIER.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEOSS Common Infrastructure (GCI)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
EGIDA Stakeholder Network and Advisory Board and Their Relevance for EGIDA and GEO Stefano Nativi 1 st Joint Workshop of the EGIDA Stakeholder Network.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
The IGWCO Transition into GEO August 2007 IGWCO Secretariat 7bis, avenue de la paix CH-1211 Geneva 2.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Earth Sciences Sector Canada Centre for Remote Sensing By John Lyon and Co-Chairs, UIC Introduction to the UIC: A User Requirements Approach Gary J. Foley,
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
IGOS Symposium Programme Committee Telecon
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
Earth Sciences Sector Canada Centre for Remote Sensing The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Francesco Pignotelli,
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee.
© GEO Secretariat 10 th UIC Outcomes User Interface Committee Sofia Antipolis, February 2009 UIC co-leads / GEO Secretariat Geneva, Switzerland.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Task ID_01 “Advancing GEOSS Data Sharing Principles” The Group on Earth Observations Data Sharing Activities for 2013 Reported by Lerato Senoko 29 th EXCOM:
GOVST-3, Paris, November 2011 GOVST Symposium, Review etc. Andreas Schiller, Eric Dombrowsky and Kirsten Wilmer-Becker.
UIC Work Plan Analysis Discussion 15 November, 2009 Ellsworth LeDrew, IEEE, Univ. Waterloo Kathy Fontaine, NASA Lawrence Friedl, NASA.
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
GEO Standards and Interoperability Forum SIF First Organizational Meeting 27 July 2007 Barcelona, Spain.
Ellsworth LeDrew (UIC) Gary Foley (UIC) Jay Pearlman (UIC and ADC) Hans-Peter Plag (UIC and ADC) Rudolf Husar (UIC and ADC) David McCabe (ADC)
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
1 BUILDING A USER-DRIVEN GEOSS: Continuing User Engagement as a Priority of GEO Presented by Lerato Senoko, South Africa On behalf of the UIC Co-Chairs:
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
GEOSS Common Infrastructure Slides prepared by Alessandro Annoni, JRC Jay Pearlman, IEEE and GEO Secretariat.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Work Plan Work Plan Management (Document 21)
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
GEOSS Data Sharing Principles
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Presentation transcript:

UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli, EU Gary J. Foley, USA Jai Parihar, Indian Space Research Organisation

Some Conclusions The objectives of the UIC meeting were set and achieved. Fruitful discussion between the different Committees during the week; potential cooperation identified. Stresa meeting (ISRSE-33, UIC meeting in May 2008) - an excellent meeting for advertising GEOSS & engaging users Re-stress the tremendous importance of continuing US and 02 in the new WorkPlan for the recognition of the users importance and requirements within GEOSS Identified the good achievements/plans of the different Communities of Practices and IGOS-themes in UIC Prepared a set of comments about the new WP, identifying where the role of users, CoP/Themes and Committee work should be better described and enhanced.

UIC-ADC Collaboration Populate the Requirements Registry from the work of US plus the work of the CoPs/IGOS-themes Develop jointly, with CBC also, GCI training modules that would be useful to novice users and enhance UIC & CBC member use of GCI A UIC effort, GNU is using the Wiki. More use of Wiki by UIC activities will happen Joint work on AIP2 is progressing very well

UIC-CBC Collaboration Build a common CBC/UIC Call for Participation (based on the ADC CFP model) for issuing in 2009 for engaging users from both Committee perspectives of the GEOSS process Agreement on the importance of the process to link technology (built by ADC), to users and their audience including donors and decision makers In the framework of task US-06-01, agreement to jointly identify the names of experts, who will populate the Advisory Groups in charge of the implementation of this task

UIC and CoPs/IGOS-themes A dozen comprehensive presentations of accomplishments and plans Workshops being planned by most groups that can be used to engage users for GEOSS and, in some cases, identify requirements. (To list on UIC web site) A significant body of science unveiled that needs to become part of GEOSS through GCI & the Wiki. Also to point to from the UIC web site

Some Issues Work Plan is a start, but needs much more work iteratively with the Committees Integration of Work Plan, Targets and Performance Metrics is needed to finalize Present this as a draft Work Plan to Plenary for guidance; insufficient time to finalize The plans of CoPs/IGOS-themes need to be explicitly in this Work Plan

Some Issues US & 02 are ongoing tasks and need to be reviewed/reinstated in this Work Plan The UIC has embraced the increased oppor- tunities for collaboration with the other GEO Committees. This renewed focus on user needs and Committee collaboration requires additional UIC skills and membership. This includes the development and issuance of a broad call for participation to be circulated by the GEO Secretariat to greatly expand the membership.

Some Issues (continued) Expand the Task/Sub-task write-ups in this Work Plan to describe role of each Committee in 2-3 sentences. Either the Secretariat or the Committees could do this between now and the Plenary and presented as a draft. Show all comments received in each version of this Work Plan for the Committees and Member Countries to see

Some Issues (continued) Have more conference calls of Co-Chairs, both two Committee calls and all Committee calls Monthly? reports to Committees by GEO Director Make earthobservations.org a more user- oriented entry point to GEOSS, with more attention to engaging the novice users; add tutorials and examples of how past novice users have been engaged and learned the benefits of GEOSS.

Some Issues (continued) Recognize in this Work Plan that the User Interface Committee develops methods and processes to engage the broad range of users in GEOSS and to ultimately capture from these users the outcomes and benefits from Earth observations Revise the Task Sheet format to get reports that are useful and timely to all of the relevant Committees