1 FEDERAL UNIVERSITY OF PERNAMBUCO – UFPE COMPANHIA HIDRO ELÉTRICA DO SÃO FRANCISCO – CHESF “A COMPARATIVE STUDY OF THE EFFICIENCY OF THE BRAZILIAN HYDROELECTRIC.

Slides:



Advertisements
Similar presentations
How Efficient are Brazilian Courts? Answering it with DEA Luciana Yeung* + Paulo Furquim de Azevedo* *Escola de Economia de São Paulo - Fundação Getúlio.
Advertisements

1 Statistical Tests of Returns to Scale Using DEA Rajiv D. Banker Hsihui Chang Shih-Chi Chang.
Privatisation and Financial Performance of European Airports Dr. Hans-Arthur Vogel.
Energy Management in Brazil August 9th, 2011 Rio de Janeiro | RJ By: Pedro Paulo da Silva Filho | Grupo SAGE Desenvolvimento: SAGE US – Brazil Industrial.
DEA (Data Envelopment Analysis)
1/55 EF 507 QUANTITATIVE METHODS FOR ECONOMICS AND FINANCE FALL 2008 Chapter 10 Hypothesis Testing.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 8-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
ARE COMBINATION GAS AND ELECTRIC UTILITIES MULTIPRODUCT NATURAL MONOPOLIES? - Merrile Sing Presentation Eco 435 Date 31 January 2012.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Fundamentals of Hypothesis Testing: One-Sample Tests Statistics.
Testing for Subadditivity of Vertically Integrated Electric Utilities Keith Gilsdorf.
Statistics for Managers Using Microsoft® Excel 5th Edition
The Importance of Hydropower and the Dam of Włoczławek
Figure 14.1 Economic Growth in the ADE/ASR model.
The Scale of Wind Power Per US DOE (US Department of Energy)  According to the US Department of Energy, Wind & Hydropower Technologies Program, wind turbines.
Measuring Electricity Generation Efficiency Data Envelopment Analysis versus Fixed Proportion Technology Indicators.
Chapter 10 Hypothesis Testing
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 9-1 Chapter 9 Fundamentals of Hypothesis Testing: One-Sample Tests Business Statistics,
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ENERGY INDUSTRY FUNDAMENTALS: MODULE 3, UNIT C— Overview of Emerging and Alternative Generation Technologies.
1 Chile-China: Strategic Partners Francisco Silva March 2014.
Inflation Report February Costs and prices.
contents INTRODUCTION. HYDRO POWER PLANT IN INDIA. WORKING.
Solar Physics Board Meeting Rio de Janeiro July, 2009.
© Anderson Analytics LLC, All Rights Reserved 1 Brand & Countries It’s From Where? College Students Clueless on Where Favorite Products Come From.
Economics of Alternative Energy Sources and Globalization Nov Orlando, Florida The Economic Feasibility of Bio-energy Generation for Peak Demand.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
“Brazil’s Moment in the sun” Energy front – a key part of its economy Jerson Kelman – CEO, Light S/A.
Investigation into evidence for economies of scale in the water and sewerage industry in England and Wales Presentation of Findings Water UK City Conference,
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Energy Industry Analysis 2009 November 2010 The purpose of this analysis is to document the significance of Danish energy industries for the economy and.
Utility Scale Wind Energy Prof. Park UTI-111 Essex County College.
Hydroelectric Power. What’s Hydroelectric Power ? Hydroelectric Power is the way to use water’s Potential Energy and Kinetic Energy to converted into.
Electricity, Gas and Water Indexes June Electricity Statistics A survey on generation and distribution of electricity is carried out since 1990.
Using a dam (hydroelectric). How does it work? The theory is to build a dam on a large river that has a large drop in elevation. The dam stores large.
Where is Wind Power Being Used? At the end of last year, global capacity was more than 70,000 megawatts – A single megawatt is enough energy to power.
1 Cannot be more efficient than the Pareto efficiency? Lifen Wu Centre for Efficiency and Productivity Analysis The University of Queensland Australia.
Deputy Assistant Secretary for International Affairs for Fossil Energy Justin “Judd” Swift – U.S. Department of Energy.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Fundamentals of Hypothesis Testing: One-Sample Tests Statistics.
National Economic Survey of Iraq 1 The Agriculture Survey Part 2 November 21, 2004.
Biggest hydroelectric power plants in world
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
ECONOMICAL VIABILITY OF THE NUCLEAR OPTION IN MEXICO Instituto Nacional de Investigaciones Nucleares.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
The Impact of Coal-Electricity Linkage on The Cost Efficiency of China’s Thermal Power Plants Na Duan, Bai-chen Xie Tianjin University 1.
© Anderson Analytics LLC, All Rights Reserved 1 Country Awareness/Quality Report US College Students.
By Yoana Cholakova Sasha Stopanjac To have Hydroelectricity you need constant running water. Producing this energy source you must have a lot of space.
Creating the environment for business Streamlining industrial emissions legislation Caspar Corden (Entec) Andrew Farmer (IEEP) IPPC Review Advisory Group.
G8 Group of Eight. G8 G8 G Originally G7 - France, Germany, Italy, Japan, Britain, Canada and the U.S Originally G7 - France, Germany,
FOREIGN DIRECT INVESTMENT AND PRODUCTIVITY SPILLOVERS: Firm Level Evidence from Chilean industrial sector. Leopoldo LabordaDaniel Sotelsek University of.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
Erdeneburen HPP Project Implementation Unit
Share in % of world GDP based on R.Vaidyanathan,iimb,20111.
Efficiency Analysis of Non-life Insurance in Indonesia Zaenal Abidin Emilyn Cabanda.
Two different problems 1 – The interest of Petrobrás in the refineries in Bolivia as a company although State owned 1 – The interest of Petrobrás in the.
Was the war really a World war?. ‘Fighting on the front line’ or ‘Watching from the sideline’? India Brazil Australia US Sweden New Zealand Japan.
Internet Call Termination Rates How is the price of call termination influenced by national internet calling legislation?
Hydro Energy.
The sample under analysis at the end of the scoring was made up of 99 participants as follows:
A new perspective on global carbon emission inequality: insights from a global interpersonal carbon Gini-index Presented By: Tianpeng Wang Institute of.
The Most Visited Countries
Snapshot of Global PV Markets
Bric's Countries in the Webometrics Ranking of World Universities
Solar PV Market
1) Brazil Greece 33⁰ 13⁰.
Ask 100 randomly chosen people the following 6 QUESTIONS…
Economic Systems in Latin America
Renewable energies in Russia
2006 Rank Adjusted for Purchasing Power
Annual Attachment O Stakeholder Meeting
Annual Attachment O Stakeholder Meeting
Presentation transcript:

1 FEDERAL UNIVERSITY OF PERNAMBUCO – UFPE COMPANHIA HIDRO ELÉTRICA DO SÃO FRANCISCO – CHESF “A COMPARATIVE STUDY OF THE EFFICIENCY OF THE BRAZILIAN HYDROELECTRIC POWER PLANTS USING DATA ENVELOPMENT ANALYSIS – DEA” PRESENTER: MSc. EDUARDO ARRUDA CÂMARA Co-author: Prof. Dr. Francisco de Sousa Ramos

2 CountryTotal 1United States964,754 2China517,550 3Japan251,318 4Russia218,370 5India143,773 6Canada122,661 7Germany120,833 8France112,022 9Brazil93,158 10United Kingdom78,706 Source: Energy Information Administration. International Energy Annual Table Posted: December 8, Electricity Installed Capacity, in Megawatts

3 CountryTotal 1China117,388 2United States77,821 3Canada71,801 4Brazil70,858 5Russia45,835 6India32,326 7Norway26,410 8Japan22,133 9France20,806 10Sweden16,302 Source: Energy Information Administration. International Energy Annual Table Posted: December 8, Next Update: August 2009 Hydroelectric Installed Capacity, in Megawatts

4 USA’s Electricity Installed Capacity by Type, January 1, 2006 (Megawatts)

5 Brazil’s Electricity Installed Capacity by Type, January 1, 2006 (Megawatts)

6 Comparative of the Distribution of Electricity Installed Capacity by Type CountryThermalHydroelectricNuclearOthersTotal United States (MW) 761,60377,821100,33424,996964,754 Distribution (%) 78.94%8.07%10.40%2.59%100.00% Brazil (MW) 14,20570,8582,0076,08893,158 Distribution (%) 15.25%76.06%2.15%6.54%100.00%

7 GENERAL OBJECT This study will identify and compare the efficiency of 87 Brazilian hydroelectric generating plants with installed capacity above 50 MW, based on the inputs and output used as variables of the analysis. This study will identify and compare the efficiency of 87 Brazilian hydroelectric generating plants with installed capacity above 50 MW, based on the inputs and output used as variables of the analysis.

8 METHODOLOGY For the data analysis, the DEA methodology was used, under the input orientation, in the traditional models that allow constant returns of scale (CRS), also known as CCR model, and variable returns of scale (VRS) or BCC model.

9 DATA ENTRY → Sample Due to the availability of data, related to the variables used in the study, 87 Brazilian hydroelectric generating units, from 29 different companies were chosen for analysis.

10 In the selection of variables were used and combined three criteria: the availability of data; the research of related literature and the professional opinion of relevant individuals, concerned with the issue that the research is proposed. DATA ENTRY → → Output and Inputs

11 STUDIES ON EFFICIENCY IN POWER GENERATION

12 STUDIES ON EFFICIENCY IN POWER GENERATION

13 DATA ENTRY → → Output and Inputs Output:. Generated Energy in medium MW. Inputs: ; Installed Power in MW; Height of falls in meters; Age of the Generation Plant in months and Assured Energy in medium MW.

14 OBSERVED RESULTS The indices of efficiency of the 87 HPPs in question were obtained using the EMS program, version 1.3.0, Scheel (2000), which employs the DEA methodology and its traditional DEA-CCR and DEA-BCC models.

15 OBSERVED RESULTS Number of efficient HPPs with 5 variables selected (1 OUTPUT e 4 INPUTS) in both models: DEA-CCR: 8 efficient HPPs (100%); DEA-BCC: 27 efficient HPPs (100%). From the results obtained it is possible to observe that all 8 HPPs considered efficient by the DEA-CCR model were also efficient in the DEA-BCC model.

16 OBSERVED RESULTS The Top 5 Efficient HPPs and the Number of Times they were Considered as Benchmark

17 OBSERVED RESULTS

18 Histogram of the Distribution of Indices of Efficiency (DEA-CCR e DEA-BCC) OBSERVED RESULTS

19 OBSERVED RESULTS Statistical Summary of Indices of Efficiency in the DEA-CCR and DEA-BCC Models

20 Indices of Efficiency Analysis by the Time of Operation of the HPP → - Old HPPs → 75.44% Arithmetic average between the efficiency averages from the models by category. - Intermediary HPPs → →→ → 84% - Recent HPPs → 81.30% OBSERVED RESULTS

21 Indices of Efficiency for Installed Power Analysis → - Small HPPs → 77.46% → - Medium HPPs → 74.71% Arithmetic average between the efficiency averages from the models by category. - Large HPPs → 87.76% OBSERVED RESULTS

22 Indices of Efficiency Analysis by the Height of Falls of the HPP - Medium HF HPPs → 74.38% - High HF HPPs → 80.80% Arithmetic average between the efficiency averages from the models by category. - Low HF HPPs → →→ → 83.01% OBSERVED RESULTS

23 Indices of Efficiency Analysis by the HPP Owner Company OBSERVED RESULTS

24 Indices of Efficiency Analysis by the Geographical Location of the HPP OBSERVED RESULTS

25 OBSERVED RESULTS 88% 84% 71% 80% 82% (Indices of Efficiency by the Geographical (Indices of Efficiency by the Geographical Region)

26 CONCLUSION - The DEA-CCR model, which admits constant returns of scale, is more restrictive in the efficiency of the units than the DEA-BCC model; - The efficient units in the DEA-CCR model will also be efficient in the DEA-BCC model; - The efficiency indices obtained for the units in the DEA- CCR model will always be equal to or lower than the indices for the DEA-BCC model.

27 CONCLUSION - This study suffers a great influence of the 87 HPPs included in the sample, of the variables used as inputs and output and of the scope period covered. - And yet, as a suggestion to carry out further work would be to measure the efficiency of national HPPs that were privatized, showing the situation of them before and after privatization. Phone: /