Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.

Slides:



Advertisements
Similar presentations
Part 139 Training 1.
Advertisements

MONITORING OF SUBGRANTEES
Metro Muncipal Agreement Program
Presentation of the proposed Annex 19 – Safety Management
Airport Layout Plans (ALPs)
Effective Contract Management Planning
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
FAA Office of Airports Airport Fuel Storage and Handling
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Presented January 20, 2011 by: John Allen Director, Flight Standards Service (AFS-1) Federal Aviation Administration Public Aircraft Operations Forum.
Donna Speidel, President, Sightline Airport Marking Consultants Planning and Design for Airfield Markings March 3, th Annual Airports Conference.
By: Date: FAA Overview Freely Associated States Jim Spillane, Sr. FAA Rep., Pacific Rim April 5, 2013.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
Recent Lighting and Marking Design Challenges/Trends
Presented to: Association of California Airports By: Peter F. Ciesla, Environmental Protection Specialist Date: September 21, 2006 Federal Aviation Administration.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Washington Metropolitan Area District Office SBA.
Presented to: By: Date: Federal Aviation Administration SAFETY MANAGEMENT SYSTEMS An FAA Update 32 nd Annual AEA Airports Conference Keri Lyn Spencer,
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
The Quality Management System
Ann Murphy, Office of the Chief Administrative Officer NOAA Trusted Agent Training Silver Spring, MD October 2014 National Oceanic and Atmospheric Administration.
U.S. Small Business Administration
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Federal Aviation Administration Rick Etter Airports Acquisition Specialist FAA, Office of Airport Planning and Programming International Right-of-Way Association.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
34th Eastern Region Airports Division Annual Conference
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Federal Aviation Administration 14 CFR Part 147 Aviation Advisory Committee Working Group Training Updates Presented to: World Aviation Training Symposium.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
VI. Developing a VSMP Program General Stormwater Training Workshop.
1 Federal Aviation Administration Federal Aviation Administration Runway Incursion Prevention Airport Design – AC 150/5300 Change - 17 Presented to: Eastern.
Federal Aviation Administration Rick Etter Airport Acquisition Specialist FAA, Office of Airport Planning and Programming (202) ,
Presented to: By: Date: Federal Aviation Administration Construction Safety Phasing Plans and Part 139 Airports Conference – Hershey, PA Evelyn Martinez,
Federal Aviation Administration 1 Eastern Regional Conference March 2, 2011 Hershey, PA Office of Airport Planning and Programming Airport Improvement.
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
U.S./Europe International Aviation Safety Conference By: Date: “Global Aviation Safety Processes: Refining Reinforcing, and Streamlining” Federal Aviation.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
Presented to: By: Date: Federal Aviation Administration NPS Data Collection for Congressional Mandate OpSpec B057- NATONAL PARK FLIGHT OPERATIONS DATA.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
Paved Runway Condition Assessment Matrix and New Winter Operations AC Overview Title too wordy.
Airport FAA 5010 Safety Inspections What does that mean???? Inspectors are responsible for reporting accurate information about all landing facilities.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Presented to: By: Date: Federal Aviation Administration Obstacles in the Visual Segment 20:1 Background, Policies and Action Gerard G Lebar Eastern Flight.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
FMCSA BASIC TITLE VI PROGRAM TRAINING December 2015 Lester G. Finkle FMCSA National Title VI Program Manager 11/13/20151.
The Administration of Subrecipient Agreements
Airport Planning.
2 CFR 200- aka Uniform Guidance.
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Oceanic and International Operations
May 2018 HSAC.
System Safety Regulation
USOAP Continuous Monitoring Approach (CMA) Workshop
Aerodrome Certification Workshop
Aerodrome Certification Workshop
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual Airport Conference By: Khalil E. Kodsi, P.E. PMP Airport Civil Engineer, FAA Date: April 3, 2012

2 Federal Aviation Administration Advisory Circular - Update 2 Team Members AEARick HarnerCivil Engineer / Project Manager ACEMike RottinghausAirport Engineer ANMSteve EngebrechtCivil Engineer AGLAl RichardsonProgram Manager ANEJohn MerckCivil Engineer / Project Manager & ACSI ASOTommy DupreeTeam Lead/Civil Engineer AEAEvelyn MartinezLead Airport Certification Safety Inspector AAS-300 Phillip DavenportAirport Certification and Safety and Compliance Specialist AAS-100Khalil KodsiCivil Engineer Rick MarinelliISI - Contract Support

3 Federal Aviation Administration Advisory Circular - Update 3 This Revision – 2F Applicability Principal Changes New construction limit and current projects Responsibility for Safety During Construction Construction Safety and Phasing Plans Safety Plan Compliance Document

4 Federal Aviation Administration Advisory Circular - Update 4 Applicability Whom this AC Affects:  Certificated Airports under Title 14 Code of Federal Regulations (CFR), part 139  Construction projects for airports receiving funds under the Airport Improvement Program & Passenger Fair Charge Program  Not Required but Recommended:  Non-certificated airports without grant agreements.

5 Federal Aviation Administration Advisory Circular - Update Principal Changes Construction Activities are prohibited in all safety areas. Guidance to incorporate Safety Risk Management is provided. A checklist for writing the construction safety and phasing plans (CSPP) is included and recommended. A guideline on how to write a CSPP is provided. 5

6 Federal Aviation Administration Advisory Circular - Update Protection of Runway and Taxiway Safety Areas No Construction within existing RSA –RSA can be temporarily adjusted (based on aircraft operations) –Temporary use of Declared Distances –Partial runway closure No Construction within existing TSA –TSA may be temporarily adjusted to aircraft operations requiring a TSA = TSA width available during construction. 6

7 Federal Aviation Administration Advisory Circular - Update Safety Risk Management Airport Operator to coordinate early in the development phase of the CSPP with Airports Regional or District Office: –Notify FAA during “scope development” phase of the project. –Provide documents necessary to conduct SRM ( ) –Participate in the SRM process –Provide a representative to participate on the SRM panel –Ensure all applicable SRM identified risk elements are recorded and mitigated within the CSPP Airport projects NOT typically requiring a safety assessment: –Construction or rehabilitation of facilities outside the air operations area. –Do not involve haul routes, material placement or line-of-site impact within the air operations area. (Appendix B.) 7

8 Federal Aviation Administration Advisory Circular - Update CSPP - Checklist This Checklist is designed to AID in preparing and/or reviewing the CSPP – This is not a required submittal. The Checklist is keyed to Section 2. “Plan Requirements” and the listed elements: –Areas and Operations Affected by Construction Activity. –Navigation Aid (NAVAID) Protection. –Contractor Access. –Wildlife Management. –Foreign Object Debris (FOD) Management. –Hazardous Materials (HAZMAT) Management. –Notification of Construction Activities. –Inspection Requirements. –Underground Utilities. –Special Conditions. –Runway and Taxiway Visual Aids. –Marking and Signs for Access Routes. –Hazard Marking, Lighting and Signing. –Protection of Runway and Taxiway Safety Areas. 8

9 Federal Aviation Administration Advisory Circular - Update Guidelines for Writing a CSPP Chapter 3 is dedicated for this purpose The CSPP is a standalone document Guidelines are intended to correspond to the “Plan Requirement “ sections listed in Chapter 2 Each section focus on a specific subject Each subject is discussed in detail and maybe broken into subsections. 9

10 Federal Aviation Administration Advisory Circular - Update 10 Construction limits – 2F Applicability  Keep equipment and construction activity at the specified limit per standard. (Table 3-1,2,3)  New construction limit apply based on the phase of the project: Scope development, Planning, Design... Current ProjectDoes new limit apply ? CSPP Already ApprovedNo Contract AwardedNo Planning PhaseYes

11 Federal Aviation Administration Advisory Circular - Update 11 Responsibility for Safety During Construction On Airport construction activities are the responsibility of the Airport Operator (AO) –Safety culture is established by the AO –Safety is enforced by the AO Construction Contractor must comply with the AO’s plans for safety Airport tenants must also comply with the airport’s safety requirements. The CSPP can not be delegated to the construction contractor

12 Federal Aviation Administration Advisory Circular - Update 12 Construction Safety & Phasing Plan (CSPP) The CSPP should be developed concurrently as the project is being designed. Outline/draft at 25 to 30% of project design Formal submission to FAA for Approval at 80 to 90% Provisions in the CSPP do influence cost CSPP to the extent possible should address “Plan Requirements” –Not every project may need to satisfy all listed sections under chapter 2.

13 Federal Aviation Administration Advisory Circular - Update Safety Plan Compliance Document Both the CSPP and SPCD are the primary tools to ensure “Safety Compliance” during construction. SPCD must include all supplemental information that could not be included in the CSPP prior to contract award. SPCD must affirm that the construction contractor will abide by the CSPP. Format of supplemental information in the SPCD should match the format of the CSPP. If no supplemental information is needed – SPCD need not be prepared. SPCD should be submitted to AO for approval prior to notice-to- proceed is given. 13

14 Federal Aviation Administration Advisory Circular - Update Questions ? 14

15 Federal Aviation Administration Advisory Circular - Update 15 Takeoff & Landing Veeroffs

16 Federal Aviation Administration Advisory Circular - Update 16 Runway Design- (Table 3-1) AC 150/ A & B ( Visibility > 3/4 mi) IIIIIIIV Runway Width RSA beyond RW End RSA Width OFA Width AC 150/ A & B ( Visibility < 3/4 mi) IIIIIIIV Runway Width RSA beyond RW End RSA Width OFA Width 800 Runway Design- (Table 3-2)

17 Federal Aviation Administration Advisory Circular - Update 17 Runway Design - Table 3-3 AC 150/5300 C & D IIIIIIIVVVI Runway Width RSA beyond RW End RSA Width 500 OFA Width 800