The Case Studies on Port-City Relationships Ancona, June 2005 Ecoports Project – Work package 5.4.

Slides:



Advertisements
Similar presentations
Philbrown consultancy mobile ISO FOR SMALL BUSINESSES FIRST ISO 9001.
Advertisements

A look at strengths and weaknesses of organizational structures and how they address critical issues in higher education.
Final Report Presentation By Mohammad Saber Sakhizada March,26 – 2009.
Working with Professionals The more specifically you can define your needs, the more likely you are to get what you need. You – the community drives the.
PBT – P2 Preventing Pollution: A Tool to Reduce and Eliminate Persistent Toxic Substances in the Great Lakes Basin.
KINGSTON PARISH COUNCIL COUNCIL MEETING – 10 JANUARY 2011 PUBLIC CONSULTATION ON THE FUTURE MANAGEMENT OF USE OF THE PAVILION A presentation by the Clerk.
Division Of Early Warning And Assessment MODULE 4: MANAGING THE ASSESSMENT AND REPORTING PROCESS.
INTEREST GROUPS.
BRAC: GETTING THE NEXT ROUND RIGHT BASE REDEVELOPMENT FORUM NOVEMBER 2014.
WHAT IS A SYSTEMS APPROACH?. Homeless shelters perpetuate homelessness Drug busts increase drug-related crime “Get tough” prison sentences fail to reduce.
5.4.2 Problem and Potential Analysis 1 Problem and Potential Analysis UPA Package 5, Module 4.
BENEFITS BASED PROGRAMMING
Job Descriptions Presented by: Peggy Accuardi Compensation 1.
1 Municipal Ports Training Seminar: Board Governance Issues Prepared for DfT by Fisher Associates June 2007.
The Nature of Groups Ch. 8.
U n i t 6 Multisectoral collaboration. © WHO, │ By the end of this unit, the trainee should be able to: explain why there is a need for multisectoral.
Public Participation in Socially Sustainable Urban Development.
Non-governmental Actors in the Compliance with and Monitoring of Multilateral Environmental Decisions.
Foster social acceptance of RES by stakeholder engagement Contract N°: IEE/11/930/SI Project duration: 31/03/2012 – 30/03/ /04/2012.
A Roundtable Discussion FUTURE DESIGN SOLUTIONS FOR BUFFALO Paul Goldberger Catherine Schweitzer, Robert Shibley.
OPPORTUNITIES OF TRANSNATIONAL TOURISM DEVELOPMENT IN CEI COUNTRIES – ROYAL PALACE, GÖDÖLLŐ, HUNGARY Panel on Tourism and Sustainability Attila.
Slide 14.1 Cooper et al: Tourism: Principles and Practice, 3e Pearson Education Limited 2005, © retained by authors Chapter 14 Public Sector and Policy.
Chapter 14 Public Sector and Policy
Outcomes of Public Health
WATERSHED PLANNING A COMMUNITY DEVELOPMENT PROCESS University of Missouri Water Quality Program Staff: Bob Broz, Dan Downing, John Tharp.
MAV Environment Conference Changes, new initiatives and directions - councils’ environmental obligations in 2014 and beyond.
Building Effective Interpersonal Relationships
Statement of Findings August 30, From February through June 1999, representatives of multi-level public and private sectors convened to explore.
Community Engagement © Tamarack – An Institute for Community Engagement, Find more at: City of Ottawa March 1, 2005.
LOCAL BUFFER SUPPORT PROGRAM 1 May 2014 MAV. Liveability, growth and waste As Melbourne continues to grow, we need secure the right mix of resource recovery.
A transnational project implemented by WP 6 - SERVICES AND QUALITY OF LIFE SCIENTIFIC MEETING, MILAN Local endogenous development and urban regeneration.
Chapter 8 – The Comprehensive Plan 10/3/ The Goals of Comprehensive Planning  Comprehensive plans are usually prepared for a period of 20 years.
Economics, Policy, and the FutureSection 1 Section 1: Economics and International Cooperation Preview Classroom Catalyst Objectives International Development.
Economics, Policy,and the FutureSection 1 Section 1: Economics and International Cooperation Preview Bellringer Objectives International Development and.
Headwaters Communities in Action Building A Better Quality of Life Together.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
APPLICATION OF EU SUSTAINABLE DEVELOPMENT RULES Axel Luttenberger.
Transport Development and Trade Facilitation World Bank – UNOHRLLS June 13th
Key problems and priorities in urban transport sector in SEE Regional Meeting on Sustainable Transport Policies in South Eastern Europe Budapest,
EPI & MANAGEMENT Luigi Pinchetti Laterlite LCA LECA INTERNATIONAL COPENHAGEN MAY 2001.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Copyright © 2012 McGraw- Hill Ryerson Ltd. Chapter 2 Ethics First … Then Customer Relationships 0.
1 februari 2007 Martha Brouwer (program manager Traffic Management and Public Transport) Network Operations in the Netherlands.
Public Private Partnership Public Private Partnership (PPP) 1 Corinne Waelti, seecon international gmbh.
Awareness raising process on EMS aimed to Adriatic and Ionian Ports (action 2) Piero Remitti, City of Ancona Country thematic workshop n.1 Ancona, Italy.
Awareness raising process on EMS aimed to Adriatic and Ionian Ports (action 2) Piero Remitti, City of Ancona Country workshop n.3 Thessaloniki, Greece.
Presented by: Steve Litke, Fraser Basin Council Winnipeg, Manitoba June 18, 2012 Collaborative Approaches to Watershed Governance – Lessons from BC.
Ambition, confidence and risk: holding our nerve in difficult times Andrew Cozens Strategic Adviser, Children Adults & Health Services SSRG Annual Workshop.
13 th – 15 March, 2006 New Perspectives in Real Estate Development In Port of Spain Welcome.
Fire and Devolution -a chance to act- Brian Robinson C.B.E. Q.F.S.M. Chairman, Fire Sector Federation.
5 th ITU Green Standards Week Nassau, The Bahamas December 2015 Rethinking Smart Sustainable Cities from the Ground Up: Challenges and Opportunities.
Participation in the Process of Brownfield Regeneration Dagmar Petríková, Matej Jaššo „This project has been funded with support from the European Commission.
Productivity and Quality Management Sixth Lecture.
Babes-Bolyai University Faculty of Political, Administrative and Communication Science The need for Planning Diana Apostol NGO Management 1 st Year.
Eighth Italian Conference of Environmental Agencies Genoa, July 5-7, 2004.
International Council of Nurses Code of Nurses. The fundamental responsibility of the nurse is fourfold: "to promote health, to prevent illness, to restore.
JOB DESCRIPTIONS 1. Overview Regardless of the size or complexity of an organization, good job descriptions are vital management tools and important documents.
Level 1 Business Studies AS90838 Demonstrate an understanding of external factors influencing a small business.
June 2005 How can satellite data support environmental management in ports? Lheon- A European Space Agency Project by Ana Maiques.
Carmela Tuccillo Orlando Troisi Università degli Studi di Salerno
Regeneration and Technical Portfolio Priorities & Issues 9 th June 2008.
Building an Effective Paperless Records Management Governance Structure BADM 559 Enterprise IT Governance Professor Michael Shaw By Moh’d A. Obeidat 12/15/2008.
Activity: What makes a good or bad manager & employee?
CONNECT: Sydney A New Platform for City Development
Meeting of the Maritime Security, Environmental Protection and Operations (MSEPO) Freetown, Sierra Leone October 2017 “Environmental Management.
PIANC, Chair of WFD Navigation Task Group
WHAT IS A SYSTEMS APPROACH?
Presentation transcript:

The Case Studies on Port-City Relationships Ancona, June 2005 Ecoports Project – Work package 5.4

2 1.New Developments of Port of Rotterdam (NL) 2.Management of public complaints due to dust pollution in the port of Civitavecchia (IT) 3.The port authority of Livorno and the management of city canals (IT) 4.Noise pollution in the port area at Genoa (IT) 5.Dredging works in maintenance of approaching lines in the Port of Gdansk (PL) 6.The noise issue manage by the Port Authority of Hamburg (DE) 7.Lorry traffic regulation of Port of Trieste (IT) THE CASE STUDIES

3 The environmental problems linked to the port activities are often reported on the local press in a very critical way. THE COMMON ELEMENTS This leads to create or strengthen a negative image of ports in the local community.

4 The widest opinions on ports among the local community are then: the port runs a business not in an environment friendly way. bad image of port has influence on deterioration of image of the city and its attractiveness – for example for the tourists and the investors. THE COMMON ELEMENTS

5 Often moved by the complaints of citizens, city council obliges the port to perform actions to quickly stop or limit nuisance, regardless of costs needed. THE COMMON ELEMENTS CITIZENS CITY COUNCIL PORT DECISION-MAKING PROCESS: LINEAR

6 Sometimes ports decide to co-operate with one or more stakeholders (local bodies, NGO’s, governmental agencies, etc.) in order to share environmental issues and find together the solutions. THE COMMON ELEMENTS CITIZENS LOCAL BODIES PORT AGENCIES DECISION-MAKING PROCESS: CIRCULAR In these cases ports experience that cooperation is fundamental.

7 It is not always possible to completely satisfy the whole public opinion. Anyway in general local community appreciates the sensitivity of the port towards their complaints and the new collaborative approach to limit nuisance. THE COMMON ELEMENTS

8 Restrictions are usually shared among all interested parts: ports, companies and also citizens. It must be clear to the residents that they live in a port area, not in a national park. THE COMMON ELEMENTS

9 Examples of shared restrictions: No admission to new apartment buildings has been given for windows faced to the harbour. On the contrary for pre-existing apartments port must undertake to find technical/managerial solutions (special noise reducing windows for these houses, noise reduction program for all dockers and terminal, etc.) THE COMMON ELEMENTS

10 The collaborative approach leads the Port to necessarily speak with several interested parts, as the environmental issues are complex. Coordinating all these relations can be a hard work! THE COMMON ELEMENTS

11 In most cases actions performed by ports to solve an environmental issue are very expensive and they need strong investment costs. All economic consequences has to be discussed with all parts. It’s also true that over a medium/long period these costs can be recovered, for example: less social costs due to professional illness, recuperation of dispersed material, minimization of costs for waste disposal, etc. THE COMMON ELEMENTS

12 It is not always clear who must undertake to carry on a remediation action and pay for it. This can be due to responsibilities, competence, roles not defined by laws/regulations THE COMMON ELEMENTS

13 Some ports have agreed upon the methods, objectives and technical solutions with local bodies, starting from all point of views and needs. Also researches/studies to understand particular matters, have been carried on by the ports with local bodies. The outcomes can then be useful as a base for preparation the national regulations in this field. THE COMMON ELEMENTS

14 (re)Development of port can lead to the creation of richness for local community, like: extra employment new business infrastructures improved A significant percentage of population (about 10% at Rotterdam) can work in the port. THE COMMON ELEMENTS

15 It’s not possible to avoid discussions about environmental issues due to the port activities influencing the city. A co-operative approach is the best way to keep good relations with all interested parts. This way the port can play a role of leadership for the local community development. FINAL CONSIDERATION