Research Infrastructures within Christos Profilis European Commission Research Infrastructures March 2007.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
Research Infrastructures Content of Call 3 Hervé PERO European Commission, DG RTD Istanbul - 7 th November 2007.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
“Regions of Knowledge” and “Research Potential” Briefing Session « RESEARCH POTENTIAL » « CAPACITIES » SPECIFIC PROGRAMME European Commission Research.
1 RESEARCH INFRASTRUCTURES Synergy in using FP7 and SFs for the development of Research Infrastructures Warsaw, 13 February 2006 Hervé Pero, European Commission.
Research Infrastructures in Horizon 2020 CEA-Saclay Saclay, 10 October 2013 Ana ARANA ANTELO European Commission – DG Research & Innovation Head of Unit.
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 2. The Funding schemes.
FP7 /1 EUROPEAN COMMISSION - Research DG - October 2006 Capacities Specific Programme Robert-Jan Smits Vienna 8 November 2006.
“ERA-NET” 24 April Cooperation and coordination of national or regional research and innovation activities (i.e. programmes) FP6 Launch Conference.
Research Infrastructures European Added Value, Strategy & policy Christian Kurrer, European Commission Bonn,
CAPACITIES Programme in FP7 and OTHER SCHEMES and OTHER SCHEMES with leverage effect on research funding in Europe.
Research Infrastructures The Research Infrastructures in FP7.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
The Preparatory Phase Proposal a first draft to be discussed.
Research Infrastructures in FP7 On behalf of : Anna Maria Johansson, Hervé Péro European Commission, DG RTD/B3 MarineERA workshop Feb
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
Regional Dimension of the 7th Framework Programme Regions of Knowledge 2008 Calls Camelia DOGARU (DG RTD- B.4)
1 DG RTD-B ERA: Research Programmes and Capacity Research Infrastructures Unit Maria Theofilatou FP7 Community actions Research Infrastructures of Social.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Research Infrastructures in FP7 Gerburg Larsen European Commission, DG Research, RTD-B3 EUDET Annual Meeting Palaiseau/FR, 09 October 2007.
Research Infrastructures in FP7 Christian Kurrer European Commission, DG RTD EURONS/EURISOL Town Meeting
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
FP7 – Capacities Research Infrastructures and Research for the Benefit of SMEs.
Regions of Knowledge WP and calls for proposals 2008 Warszawa, European Commission DG RTD/B4 Anna Rémond.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 EUDET I3 Kickoff meeting, Desy, Hamburg 15-17/2/2006 Presentation by Stefano Fontana, DG Research.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
An highlight on EU activities on Research Infrastructures Miloš Kuret Ministry of Higher Education, Science and Technology, Slovenia.
Information on Research Infrastructures in FP7 CARE Meeting, Frascati, November 17, 2006 Stefano Fontana, European Commission, DG-RTD.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Report /03/ Athens Information Day on “Research Infrastructures in FP7” Robert Jan Smits European Commission 21 March 2007 Greece European.
Malta Council for Science and Technology Brief Introduction to FP7 14 th September 2007 Anthea Frendo National Contact Point for FP7.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
FP7 /1 EUROPEAN COMMISSION - Research DG – September 2006 Building a Europe of Knowledge Towards the Seventh Framework Programme
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme « RESEARCH POTENTIAL » « CAPACITIES » SPECIFIC.
FP7 - Research Potential 2010 calls for proposals Bruksela, Anna Rémond DG RTD/B4 European Commission.
The Seventh Framework Programme for Research and Technological Development (FP7) supporting innovation Epp Tohver-Bulavs 07. November 2007, Tallinn.
Regional Dimension of the 7th Framework Programme « RESEARCH POTENTIAL » « CAPACITIES » SPECIFIC PROGRAMME Louis BELLEMIN.
STAC Extended meeting Coordination/Support Action on Fusion Data General Introduction and Background European Commission Research DG Yvan Capouet Head.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
Malta Council for Science and Technology Brief Introduction to FP7 4 th September 2007 Anthea Frendo National Contact Point for FP7.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
 the creation of an "internal market" in research (free movement of knowledge, researchers and technology)  the restructuring of the European research.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
Jörg Niehoff European Commission DG Research - Unit T4: SMEs SMEs in the.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
RESEARCH INFRASTRUCTURES IN FP7 General Information G.Guignard EuTuCHe workshop
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
Community Actions for Research Infrastructures Oslo, October 2010 Anna Maria Johansson, DG RTD Research Infrastructures.
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
Strengthening the foundations of ERA
The ERA.Net instrument Aims and benefits
February
Presentation transcript:

Research Infrastructures within Christos Profilis European Commission Research Infrastructures March 2007

Objectives of the Community Research Infrastructures action lOptimising the use and development of the best existing research infrastructures in Europe lHelping to create in all fields of S & T new research infrastructures of pan-European interest needed by the European scientific community lSupporting programme implementation and policy development (e.g. international cooperation)

FP7 Research Infrastructures activities Existing infrastructures Design studies New infrastructures Construction of new infrastructures (or major upgrades) Integrating activities ICT-based e- infrastructures ESFRI Roadmap Policy development and programme implementation

Definition of Research Infrastructures lFacilities, resources, and related services used by the scientific community for èConducting leading-edge research èKnowledge transmission, knowledge exchanges and knowledge preservation lIncludes èMajor scientific equipment èScientific collections, archives and structured information èICT-based infrastructures èEntities of a unique nature, used for research

Support to new research infrastructures lDesign studies: to support the conceptual design for new facilities or major upgrades, of clear European dimension and interest èthrough bottom-up calls lSupport to the Construction of new infrastructures and major upgrades to existing ones èPreparatory phase èConstruction phase 70 M€ M€

FP7 will support the design of new research infrastructures (or major upgrades) lDesign studies aiming at the conceptual design for new infrastructures with clear European dimension and interest, not at a detailed design lCase of e-Infrastructures: to foster new organisational models in domains of grids & data lEC support likely to be smaller than under FP6, i.e. less than 5 M€ lbottom-up call… lUseful to feed the ESFRI roadmap process

FP7 will support the construction of new Infrastructures (or major upgrades) lThe list of projects to be supported will be based on the work conducted by ESFRI lA two-stage process: èThe preparatory phase: to check the commitment of the Member States and reach a (draft) agreement between Member States and stakeholders for the construction èThe implementation phase: the actual construction

Support to new research infrastructures … and major upgrades to existing ones, means: èSupport to the preparatory phase mainly based on the work conducted by ESFRI è(in addition) support to RSFF è(limited) available resources to support the construction 230 M€ M€ M€

Construction of new infrastructures (or major upgrades) stage 1 - support to the preparatory phase (legal organisation, management structure, financial planning…) stage 2 - support to the implementation phase (the actual construction)  Only for projects which have sufficiently progressed in the preparatory phase  Mainly to be supported by Member States  EC financial support limited to cases where there is a critical need for such support

Stage 1 - Preparatory Phase - First call for proposals Targeted to projects identified in the 2006 ESFRI roadmap Call budget: 130 M€ EC financial contribution: within the range 1-7 M€ ; average ~ 4 M€ Contract duration: 1 to 4 years

Stage 1 - Preparatory Phase - Purpose  To provide a framework facilitating decision-making between partners from different countries  To address all the critical issues (legal, financial,..) that need to be resolved  To conclude an “agreement” between the funding parties and other partners involved allowing project to move forward  Limited to the ESFRI « mature » projects

Stage 1 - Preparatory Phase What can be done (1) ? Work expected to focus on legal, financial, governance and strategic issues needed to make the project a reality Technical work to the extent necessary to reach an agreement. Cannot be the core of a project.

Strategic work, e.g. Plans to integrate the new RI in the EU fabric of related facilities, Creation and consolidation of centres of excellence, Identification of the best possible site, Planning of research services to be provided at international level, etc. What can be done (2) ?

What can be done (3) ? Governance and logistic work, e.g. Plans in terms of decision making, management structure, advisory bodies, IPR, access rule, Planning of staff recruitment, Organisation of researchers support, etc. Legal work, e.g. Any development needed for the construction and/or operation of the new RI …

What can be done (4) ? Technical work, e.g. Draft engineering plans for construction, Final prototypes, Implementation plans for technology transfer, New processing protocols, software, etc. Financial work, e.g. Financial arrangements for construction, operation and decommission of the facility Organisation of researchers support, etc.

Who are the participants (1)? Consortia should involve all stakeholders to make the project a reality  e.g. ministries, governments, research councils, funding agencies from interested countries + as appropriate, research centres, universities, industries, … Minimum 3 participants from 3 Member States or Associated States

Who are the participants (2) ? How to manage ? Open to participants from third countries Possibility for new participants to join at later stage Coordinator to act as a « team builder » The EC will act as a “facilitator”

Activities  Legal, financial, governance, strategic work  Limited technical work Final deliverable(s)  Agreement between the partners of countries involved allowing the project to move forward  Implementation plan for the construction phase Participants  All the stakeholders necessary to make the projects a reality Preparatory Phase Summary

Preparatory Phase facilitating financial engineering for new research infrastructures Inclusion in Specific RTD Programme(s) Inclusion in DG REGIO / DG DEV strategic plans Stakeholders incl. EIROs Member states European Commission Inclusion in national Programmes Projects EIB RSFF

ESFRI PREPARATORY PHASE PROJECTS 7 Key Points 1 Proposal per topic Coordinator = team builder, not necessary COO of construction Participation of Ministries, Funding Agencies encouraged (min. 3 from 3 different MS and/or Ac) Roadmap projects not guaranteed to be EC financed PP projects not focussed on R&D National authorities to explore Structural Funds opportunities Possibility to accept additional participants « on the road »

How to present a proposal for the preparatory phase (PP) REMEMBER: PP is Neither a feasibility Nor a design study

Support for Preparatory Phase Important dates Date of publication Dec. 22, 2006 in Official Journal Detailed information to be found on Cordis Deadline for submission May 2, 2007 Evaluation week: End of June 2007 Evaluation by scientists and policy experts First contracts to come into force before end 2007

Guide for applicants Core text – for FP7 as a whole Annexes with call-specific information Annex 1: summary call information Annex 2: evaluation criteria and procedures to be applied for this call Annex 3: instructions for completing “part a" of the proposal Annex 4: instructions for drafting “part b” of the proposal

A « standard » Format based on the three (here under reminded) criteria should be used to allow a fair evaluation 1: S&T quality 2: Implementation 3: Impact How to present a Proposal ? Hearings might also be organised !

Evaluation criteria Criterion 1: S&T Excellence Facility offering world-level service to users Contribution to scientific European excellence Effectiveness of associated coordination mechanisms & work plan

Evaluation criteria Criterion 2: Quality and efficiency of Implementation and Management Appropriate management structure, procedures Quality of the partnership Appropriate allocation & justification of resources

Evaluation criteria Criterion 3: Impact Contribution to the realisation of the RI: addressing critical questions still unresolved Contribution to: technological development capacity; attractiveness of the ERA; balanced territorial development; reinforcing research- based clusters of excellence Added value, i.e. catalytic–leveraging effect of EC involvement

First call for proposals closing in spring 2007 lFor design studies, preparatory phase, and support actions  design studies: 35 M€  Support actions: 28 M€ (budget ) lIndicative budget for preparatory phase:  34 projects (budget ) lClosure: 2 nd May 2007 lFirst contracts to come into force before end M€

Support to existing Research Infrastructures lIntegrating Activities to promote the coherent use and development of research infrastructures in a given field, implemented through: èA bottom-up approach for proposals open to all fields of science èTargeted approach with topics defined in cooperation with the FP7 thematic areas lICT based e-infrastructures in support of scientific research 580 M€ M€

Integrating Activities and e-infrastructures lTo optimise the use and development of existing research infrastructures lBased on the continuation of the successful FP6 instrument “Integrated Infrastructure Initiative” (I3s) lWithin one single contract: èNetworking activities èTransnational access and/or service activities èJoint research activities

Networking Activities lTo foster a culture of co-operation between the participants and the scientific communities benefiting from the research infrastructures lForms of activities: èTowards the users: training, studies, feedback, coordination… èTowards good practice: exchange of personnel and visits, standards and quality… èTowards virtual infrastructures: Web-sites, common softwares, databases, data management… èTechnical workshops, forums, working groups and studies…

Trans-national Access and/or Service activities lProvide trans-national access to researchers or research teams to one or more infrastructures among those operated by the participants è"Hands on" access èRemote access: sending of samples, sample analysis… Managed by the contractors lProvide research infrastructures related services to the scientific community è Remote access to distributed infrastructures èServices provided through electronic means ; Data and resources management èUpgrading communication infrastructure èSupport of Grid infrastructure; support of middleware component repositories

Joint Research Activities lExplore new fundamental technologies or techniques underpinning the efficient and joint use of the participating research infrastructures To improve the services provided by the infrastructures (in quality and/or quantity) lForms of activities: èPrototype development èDevelopment of methods, protocols, standards… èDevelopment of software, middleware, algorithm; Database creation, upgrade, curation… èDevelopment and curation of samples

Objectives of an Integrating Activity project Structure better and integrate, on a European scale, the way research infrastructures operate and develop, in a given class: èBy opening and optimising the access to and the use of the existing research infrastructures in the different Member States and Associated States èBy better structuring and integrating, on a European scale, the operation(s) of research infrastructures, and by fostering their joint development (qualitative and quantitative)

Participation lAt least 3 independent legal entities established in 3 different Member States or Associated States. At least 1 of these legal entities must operate a research infrastructure providing access lOperators of research infrastructures, universities and other public research organisations as well as industry, for example equipment manufacturers

Main characteristics of an average Integrating Activity under FP6 lAverage number of contractors: 19 of which 7 are offering access lTypical duration of 4 years lAverage EC contribution: ~10 M€ èManagement: ~ 6% èNetworking Activities: ~ 15% èTrans-national Access: ~ 36% èJoint Research Activities: ~ 43% lList of funded projects (FP6)

EC contribution: ~8.7 M€ TA (~2.8 M€): To open the major microscopy centres (Antwerp, Cambridge, Delft, Dresden, Orsay, Oxford, Stuttgart, Toulouse) together with their expertise to scientist from Member States or Associated States NA (~2.2 M€): To spread electron microscopy across the community and to regions where the technique is not fully exploited at present and where it will help stimulate economic growth To inform solid state scientists and engineers in Europe about new developments in this increasingly complex technique To improve the collaboration between different laboratories and set consistent standards for measurements Distributed European Infrastructure of Advanced Electron Microscopy for Nanoscience ESTEEM (Nano Sciences)

EC contribution: ~8.7 M€ NA (cont.): To establish a shared hardware and software infrastructure and to develop open access standards for data exchange, storage and instrument control To offer remote access to the most advance instruments JRA (~3.7 M€): To improve three dimensional imaging of nano- particles down to the sub-nano-meter, and possibly atomic, scale To push the limits of chemical and electron-nano- structured materials To develop improved detection in electron microscopy for rapid acquisition of images and spectra To develop tools for nano-manipulation experiments inside the electron microscope and apply these tools for the study of dynamic systems Distributed European Infrastructure of Advanced Electron Microscopy for Nanoscience ESTEEM (Nano Sciences)

Implementation of the Integrating Activities under FP7 lBottom up approach for proposals in all fields of science (successful in FP6, to be continued in FP7) lTargeted approach for clearly defined infrastructure needs for Europe, coordinated with the thematic priorities (new) èFP7 Call N°3 (closing May 2008)

What is the targeted approach? lFor existing Research Infrastructures lA list of topics for classes of infrastructures to be supported, listed in the work programme lTopics defined in line with the Cooperation Programme  Revisions of topics: list can be amended  A sufficient basis of RI’s to be networked lComplementary to other FP7 funding schemes used in the thematic priorities (Collaborative Projects, NoE’s)

Why a targeted approach? lTo help integrating research infrastructures for European R&D needs, defined in a priority setting process lTo create synergies and ensure consistency with the Cooperation Programme  Topics are in line with R&D topics under the Cooperation Programme lTo stimulate RI actions in specific fields that are currently not well covered under our actions

How will it work? lBottom up and targeted approaches will be under the same calls lSame Project type for both approaches:  Integrating activities: I3s with Transnational Access/Service, Networking, Joint Research activities lSame evaluation procedures (by independent experts), criteria, forms…

Possible topics for RI’s under the targeted approach  About 30 priority topics for RI’s in 8 of the “Cooperation” thematic areas lHealth (6) lFood, Agriculture and Biotechnology (3) lInformation and Communication Technologies (3) lNanosciences, Nanotechnologies and Materials (2) lEnergy (5) lEnvironment (3) lTransport (2) lSocioeconomic Sciences and Humanities (3)

Synergies that can be expected: one Example lPriority topic for RI: To bring together existing research infrastructures to support the efficient provision of essential research services, including but not limited to the characterization, exposure and toxicology (human and environmental) of nano-materials lLink with the Cooperation programme: Theme 4 – NMP - Nanosciences, Nanotechnologies, Materials and new Production Technologies, Activity NMP 2007-CSA 1/SME 1/Large 1/Small 1 lTypical existing RI relevant to the topic: University of Antwerp, BE: electron crystallography, tomography, nanotechnology; Technische Universiteit Delft, NL: in situ nanolaboratory experiments + remote control; NSCR Demokritos, Athens, GR: silicon technology

Third Call for proposals closing in spring 2008 lFor both bottom up and targeted approach lIndicative budget of 275 M€  25 to 30 projects to be selected lClosure: May 2008 lSingle stage procedure for evaluation  remote + panel evaluation lResults within 4 months after closure date lFirst contracts will come into force before the end of 2008

Support actions … through a mixed bottom-up / top down approach, for: – the development of an RI European policy and the development of international cooperation –Supporting programme implementation (NCPs) and the coordination of research infrastructures in emerging areas ERANETS 65 M€

Policy development and Programme implementation 1.ERA-NETs for research infrastructures 2.Studies, conferences and coordination actions for policy development, including international cooperation 3.Coordination actions to support emerging needs 4.Network of National Contact Points (NCP) 5.Other Support actions, as appropriate Calls 1, 2, 3, 4

lTo step up the cooperation and coordination of national and/or regional programmes/activities towards their mutual opening and implementation of joint activities lTo contribute to the development of the European Research Area by improving coherence across Europe of such programmes/activities ERA-NET for Research Infrastructures (1)

ERA-NET for Research Infrastructures (2) lParticipants: Public authorities and agencies responsible for financing or managing research infrastructure programmes at national or regional level (e.g. ministries, research councils or funding agencies) lActivities may include:  Information exchange  Definition and preparation of joint activities  Implementation of joint activities  Funding of joint transnational activities  ERA-NET may be specific to a type of research infrastructures or more generic

Studies/conferences/ coordination actions for policy development lTo support the work of ESFRI and e-IRG lTo promote international cooperation

Coordination actions to support emerging needs lFor research infrastructures in areas where a culture of cooperation is less developed lSupport for Networking activities such as:  Development of common standards,  Protocols and interoperability  Benchmarking  Foresight studies for new instrumentation, methods, concepts and/or technologies

Trans-national co-operation among NCPs lTo reinforce the network of National Contact Points (NCPs)  improving the services provided to potential applicants  facilitating access to FP7 calls  helping to raise the quality of submitted proposals

First call for proposals closing in spring 2007 lFor design studies, preparatory phase, and support actions  design studies: 35 M€  Support actions: 28 M€ (budget ) lIndicative budget for preparatory phase:  34 projects (budget ) lClosure: 2 nd May 2007 lFirst contracts to come into force before end M€

Key documents to consult: Legal texts (FP7, SP, WP) Guide for applicants – specific instructions to follow Rules for participation – specifying e.g. cost models Model contract text – setting the legal frame of EC support

Research Infrastructures in FP7 research-infrastructures_en.html FP7 Research Infrastructures on CORDIS (FP6) Enquiries FP7: Infrastructures links

Many thanks for your attention Merci Gracias Danke Grazie Bedankt Teşekkür ederim Obrigado Kiitos Tack Hvala Köszönöm Ευχαριστω СПАСІБO ありがとう धन्यवाद Christos PROFILIS Tel:+32/(0)2/ Fax:+32/(0)2/