Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project IR progam Outline Introduction Measurement.

Slides:



Advertisements
Similar presentations
Progress with PWI activities at UKAEA Fusion GF Counsell, A Kirk, E Delchambre, S Lisgo, M Forrest, M Price, J Dowling, F Lott, B Dudson, A Foster,
Advertisements

Tests on TS samples at a laboratory scale of: 1.Laser detritiation technique focus on : layer removal Castellations treatments Dust control and removal.
Euratom 1 AIA robot – DEVELOPMENT OF AN ITER RELEVANT INSPECTION ROBOT Euratom.
ITER & dust Dust = major issue in term of ITER safety In vessel dust quantities: extrapolation from current experiments In vessel dust diagnostics & removal.
TORE SUPRA Association EURATOM-CEA Philipps, Huber, Schweer, Sergienko, Brezinsek, Mertens, Zlobinski & Grisolia, Hernandez, Roche, Pocheau, Davi, Semerok.
1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone ( mn) Experimental campaign : B. Pégourié ( mn) TPL analysis program :
In-Vessel Dust&Tritium Management* 1 *Based on the report of a European Group of Experts on In-Vessel Dust & Tritium Management P. Coad, G. Counsell, J.
1TPL Dismantling Project – TORE SUPRA Association EURATOM-CEA 8th, december 2006 PFC Thermal test program: TPL sector dismantling.
SEWG Fuel Retention July 2008 © Matej Mayer Fuel retention in ASDEX Upgrade tungsten coatings M. Mayer, M. Balden, K. Krieger, S. Lindig, O. Ogorodnikova,
1TPL Dismantling Project Review 08/12/06 Bernard Pégourié TORE SUPRA Association EURATOM-CEA D program: Specific experiments before dismantling Purpose:
DITS Project – M. Houry 27 th of april Y07 DITS PROJECT SCHEDULE.
1B. PégouriéDITS progress report 27/04/07 Euratom EXPERIMENTAL CAMPAIGN No reliable estimation of the wall inventory WI ~ ??? D atoms (Tsitrone,
1 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Operational Limits during the TPL Deuterium Loading Experiment.
F. Le Guern Dust&Tritium PWI AM Frascati Oct 2008 DUST AND TRITIUM MANAGEMENT.
Transient heat load tests with Nd:YAG laser Main results of EFDA TW3-TPP/ERCAR PWI Task Force meeting – CEA Cadarache October 2005 Douglas dHulst,
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
Institute for Plasma Physics Rijnhuizen D retention in W and mixed systems in Pilot-PSI G. De Temmerman a, K. Bystrov a, L. Marot b, M. Mayer c, J.J. Zielinski.
6 th EU PWI TF Meeting Madrid, Oct Tritium Inventory in ITER: Laboratory data and extrapolation from tokamaks Th Loarer, J Roth, S Brezinsek, A.
1TPL dismantling project review C. Brosset TORE SUPRA Association EURATOM-CEA 2006/12/08 TPL dismantling project review D program : analysis for D content,
ITER Organization, Cadarache, France
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I.
14th IEA RFP Workshop – Padova, April 26th-28th 2010 RFX-mod thermal measurement system: a possible diagnostic for plasma-wall interaction M. Dalla Palma.
5/12/061 Modeling, Simulation, and Analysis of Variable Frequency Transformers Brian C. Raczkowski Peter W. Sauer.
1 The YL9100S HPLC All your needs for semi-preparative applications.
Target Test Diagnostics Richard Brownsword Engineering, Rutherford Appleton Laboratory.
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Task M2 – Advanced Materials and Techniques for Resonant Detectors Motivation : Reduce thermal noise contribution to the acoustic detector noise budget.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
PSI 2008 Toledo E.Gauthier TORE SUPRA Association EURATOM-CEA 26-30/05/2008 Progress in diagnostics for characterization of plasma-wall interaction in.
EuCARD WP 7 – High Field Magnets Task 7.2 – Support Study Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 – Support Study.
On the use of LIBS to determine the fractional abundances of carbon ions in the laser plasma plume M. Naiim Habib 1, Y. Marandet 2, L. Mercadier 3, Ph.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
W coating of CFC tiles for the JET new wall - Task Agreement: JW6-TA-EP2-ILC-05 Manufacturing and testing of W-coated CFC tiles for installation in JET.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Progress in UCSD Chamber Simulation Experiments – Initial Results from Fast Thermometer Farrokh Najmabadi Sophia Chen, Andres Gaeris, John Pulsifer HAPL.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Work Plans for FY06 Sandia National Laboratories Michael Ulrickson Presented at PFC Technology Meeting May 9-11, 2005 At PPPL Sandia is a multiprogram.
LISA R&D activities at APC A status report Hubert Halloin.
Silesian University of Technology in Gliwice Inverse approach for identification of the shrinkage gap thermal resistance in continuous casting of metals.
Introduction of 9th ITPA Meeting, Divertor & SOL and PEDESTAL Jiansheng Hu
1st Advanced Virgo Review – November 3-4, 2008 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Substrates.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
Temporal separation of turbulent time series: Measurements and simulations Nils P. Basse 1,2, S. Zoletnik, M. Saffman, G. Antar, P. K. Michelsen and the.
Janyce Franc-Kyoto-GWADW1 Simulation and research for the future ET mirrors Janyce Franc, Nazario Morgado, Raffaele Flaminio Laboratoire des Matériaux.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
IEA IMPLEMENTING AGREEMENT ON NUCLEAR TECHNOLOGY OF FUSION REACTORS International Workshop on Subtask Neutronics Report on ENEA activity in 2004 Paola.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Experiment Rosen07: Measurement of R =  L /  T on Deuterium in the Nucleon Resonance Region.  Physics  Data Analysis  Cross Section calculation 
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
SPS High Energy LSS5 Thermal contact & cooling aspects
Temperature Measurements of Limiter Surfaces at High Heat Flux in the HT-7 Tokamak H. Lin, X.Z. Gong, J. Huang, J.Liu, B. Shi, X.D. Zhang, B.N. Wan,
Hybrid Pixel R&D and Interconnect Technologies
Upgrade Strategy for the Experimental Vacuum Systems
L-H power threshold and ELM control techniques: experiments on MAST and JET Carlos Hidalgo EURATOM-CIEMAT Acknowledgments to: A. Kirk (MAST) European.
On the accuracy of port assembly at Wendelstein 7-X
Application to the VIS/IR Imaging System of ITER
Thermal diffusivity identification by periodic method
Presentation transcript:

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project IR progam Outline Introduction Measurement of thermal and optical properties of deposited layers and erosion zones Conditions of analysis Determination of thermal properties Measurement of BRDF (Bidirectional Reflectivity Distribution Function) In situ diagnostics on sector 6A Fibres Thermocouples Conclusion R. Reichle (RR) J.L. Gardarein (JLG), S. Carpentier (SC), M. Chantant (MC), C. Pocheau (CP), H. Roche (HR), R. Daviot (RD), J.C. Vallet (JCV), A. Durocher (AD), C. Brosset (CB), J.M. Travere (JMT), E. Gauthier (EG), F. Rigollet (FR, CNRS-IUSTI), D. Hernandez (DH, CNRS-PROMES), J.J. Serra (JJS, DGA-Odeillo), J.P. Lasserre (JLP, CEA/CESTA)

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Determination of thermal and optical properties of deposition and erosion areas: Theses JLG & SC & RD concerned Realistic simulation of IR images (JMT ). with power flux calculation from IR data. Modification of in situ diagnostics Optical fibres: replacement of a defect fibre and preparation for in situ active thermography. Thermocouples: improvement of inverse calculation of power flux and development for ITER. Introduction: Motivations

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Conditions of analysis Measurements not in the assembly hall but in dedicated laboratories. Samples and laboratories must comply to safety reglementations. Selection of samples : All 150 tiles on tile carriers which have not been removed for deuterium analysis. + 6 tiles for off site analysis: 2 for each zone: thick, thin deposits, erosion zone. Timing : On site measurements immediately after removal of tiles for D-investigation, Delay for off site measurements on tiles > 6 months. (CB)

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Status quo of experimental determination of thermal properties of deposited layers With SATIR (RR, JCV 2003) & in JET NBI test bed (RD, EG 2006): 1 parameter. With CNRS-IUSTI (JLG, FR 2006) using pulsed photothermal method: (>) 2 parameters out of 4: thermal resistance + comb. out of thickness, cond., diff.

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Measurement of thermal properties of deposits: pulsed photothermal method Possibilities: a) Continuation with collaboration CNRS-IUSTI b) Cleanroom laser – originally set up for speckles interferometry c) Detritiation laser Comparison: ScopeRealisationRessources Planning a) 6 samplesproven !SC + collab.> 2008 CNRS-IUSTI b)150 sampleslaser worksJLG, RD, CP,EG05/2007 must be tested1TPY, 1PPY prep. for this purpose1 k material3 days measurement c) 150 samplesin development JLG, HR> mi 2007 ? for other use1 k material Proposal: go for b) first, if not possible, check c) if not use a).

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Measurement of thermal properties of deposits: other methods Possibilities: a) With DGA – Odeillo (JJS) mod. photothermal method: Cooldown delay of 6 months, few samples only, new contract (5k). b) Procurement of modulated laser > 10 kHz; ~ 30 k; Manpower ~ 0.5 year (CP) to set-up. Measurements (150 samples) ~3 days. ITER IR diagnostic relevant. c) Lock-in 2D with halogen lamps => following presentation (AD) Frequency (~0.5 Hz) too low => only one global parameter. d) SATIR method => following presentation (AD). As c) Proposal: => If budget for laser can be found : b), otherwise a). c) and d) will be done anyway. Phase lag for deposit of 100µm, 300µm, 1000µm

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Measurement of BRDF (Bidirectional reflectivity distribution function) Important input for simulation of IR images – long term project (JMT) – finally for ITER. 3 years of collaboration with CNRS-PROMES (DH). Vis-NIR range only. Proposal for UV-IR range: Collaboration with CEA/CESTA (JPL) Scope: ~ 6 tiles Realisation: on the site of collaborators, Delay: > 6 months cool down time of tiles. Costs: TBD.

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Status of in situ diagnostics on cassette 6A Fibre diagnostic: two working SiO 2 fibres, one destroyed ZrF 4 fibre (waterleak oct. 2002). No thermocouples.

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Improvement of in situ fibre diagnostics 1)Replacement of defect ZrF 4 fibre : a) SiO 2 multimode fibre (already here: 0), b)ZrF 4 fibre (7 k, 3 months procurement time). Could be used with modulated laser for in situ active thermography (ITER-relevant). 2) Upgrade of optics for even better active thermography by reduction of spot-sizes: a)Reduction of spotsize of illumination (10 k, > 6 months preparation) b)Reduction of readout spotsize, (18 k, ~12 months preparation). Proposal: if budget and planning for 05/2007: 1b otherwise: 1a if more time and more money: 1b + 2a + 2b

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Presently no temperature sensors in the vacuum vessel. Promising preliminary results obtained with the calorimetry. Set-up 1 TC imbedded in the finger and 1 TC on a outlet tube, - to test a thermal inverse method - to develop validate the TC technology and implementation technique Both aspects are of interest for ITER. (15 k, 6 months for the preparation and implementation) Temperature measurements for thermal inverse methods validation collecteur T outlet 2 fingers TC imbedded in the finger (MC,SC)

Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project Conclusions Determination of thermal properties of deposits Concerns 3 theses (JLG, SC, RD) on IR themes. Proposal: pulsed photothermal method using DRFC cleanroom laser preparation: 1 month technician + 1 month expert, 1 k material 150 measurements on tiles still on tile carrier in a few days safety aspects to clarify. Alternatives: a) Detritiation laser, if usable for that purpose. b ) for thicker deposits 30 k for modulated laser + 6 month preparation (ITER). c) > 6 months later off site with fewer samples with existing collaborations. Determination of optical properties of target with and without deposits Interesting for simulation of IR images (JMT) on 6 detached tiles, 6 months after dismanteling. Possibility (Vis/NIR only) by existing collaboration with PROMES-CNRS (DH). More interesting proposal: new collaboration for (VUV – IR) on this subject with CEA-CESTA (JPL). Improvement of in situ diagnostics A) Fibres (broken ZrF 4 fibre) To restore measurement capacity and to prepare active in situ thermography (ITER). Proposal: replacement ZrF 4 fibre (7 k, 3 months procurement), Completer option: ZrF 4 + Si0 2 monomode fibre plus optics improvement (35 k, 12 months). B) Thermocouples For validation of inverse method and installation technique for ITER. Proposal: 2 TCs on cassette (15 K 6 months preparation)