G2p/GEp Preparation Overview Jian-ping Chen g 2 p /G ep Readiness Review 5/6/2011.

Slides:



Advertisements
Similar presentations
Polarized 3 He Target for A1n-A J. P. Chen, June 11, 2013, Hall A Meeting Overview Design Progress Progress in target lab Progress from users.
Advertisements

E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
MADII Design and Physics Program Jian-ping Chen, Jefferson Lab Hall A Collaboration Meeting June 22-23, 2006 MADII Spectrometer Design Optics and background.
Extraction of G E n at Q 2 =1 (GeV/c) 2 by Measurements of May 1, 2011 Ge Jin University of Virginia.
Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise measurement of the density -dependence.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : density -dependence of the symmetry energy. Nuclear.
Targets for SoLID Experiments Jian-ping Chen SoLID Collaboration Meeting Feb 3-4, 2012.
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
G2P Target installation and Beyond. Schedule Pivot before.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
Min Huang Duke University, TUNL On Behalf of the E g2p collaboration Hall A Analysis Workshop, 12/12/12.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
K. Slifer, UNH g2p & the LT Spin Polarizability for the E Collaboration E June 9, 2011.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
S PIN A SYMMETRIES ON THE N UCLEON E XPERIMENT ( E07-003) Anusha Liyanage Experiment Nuclear Physics Group Meeting Hampton University May 11, 2009.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
E : Proton g 2 Structure Function Fundamental spin observable has never been measured at low or moderate Q 2 BC Sum Rule : violation suggested for.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting December 10 th, 2012.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Precision Measurement of R L and R T of Quasi-Elastic Electron Scattering In the Momentum Transfer Range 0.55GeV/c≤|q|≤1.0GeV/c* Yan Xinhu Department of.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
SANE Collaboration ( E07-003) Anusha Liyanage Hampton University January 12, 2010 Measurement Of the Proton Form Factor Ratio at High Q 2 by Using The.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting June 13 th, 2013 E97-110:
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
Double spin asymmetry measurement from SANE-HMS data at Jefferson Lab Hoyoung Kang For SANE collaboration Seoul National University DIS /04/23.
Physics Goals & Overview K. Slifer, UNH April 18, 2011 E08-027/007 Collaboration meeting.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
G0 Backward Angle Request: Q 2 = 0.23, 0.48 GeV 2 Main points G0 goal is to measure G E s, G M s and G A e over range of momentum transfers with best possible.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Min Huang g2p/GEp Collaboration Meeting April 18, 2011.
Hall A Collab. Mtg, 6/ 2010R. Michaels, JLAB Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Jefferson Lab PAC 30 1 August 23, 2006 PR (Hall A) ● PR (Hall C) Measuring the Neutron g 2 and d 2 at 12 GeV PR (Hall A) ● PR
G2p/GEp Beamline Status Tim Michalski Project Lead.
Proton Form Factor Ratio GE/GM from Double Spin Asymmetry with
Hall C Readiness Review – Small Angle SHMS Operation
Sanghwa Park (Stony Brook) for the PREX/CREX Collaboration
Preparation for CERN test beam
Polarized WACS Experiment (E ) Using Compact Photon Source (CPS)
Bubble Chamber Planning Meeting
University of New Hampshire Nuclear & Particle Physics Group
Special Considerations for SIDIS
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
GEANT Simulations and Track Reconstruction
PREX / CREX Collaboration Meeting and Status
Overview of Polarized 3He Target
Overview: E (x>1) E (EMC)
Presentation transcript:

g2p/GEp Preparation Overview Jian-ping Chen g 2 p /G ep Readiness Review 5/6/2011

REGION 1 REGION 2REGION 3 REG 4 REGION 5 Slow Raster FZ1 FixedStand FZ2 Telescoping Stand DUMP TARGET Polarized Solid NH 3 Target (Hall C/UVa target) Target material irradiation Beamline (Similar to Hall C) Magnetic Chicane/Beamline modifications. Low beam current BCM/BPMs, Slow Raster Hall A Engineering/Design Local Beam Dump Septum Magnets Hall Infra-structure/Chamber/ Target/magnet mount Simulations/Optics/Spectrometer/Detectors/QAD Polarimetry/3 rd arm BPMs Use existing equipments Hall C beamline/target Keep change minimum modify the existing PREX septa Major equipments for g 2 p /G E p experiments Septa/HRS

Goal is to measure g2p in the low Q2 region with a precision ~ 5-7% by measuring transversely polarized cross section difference = A x Measure both asymmetries and cross sections to 4-5% In addition to statistics, we need to control total systematics to 3-5%, i. e., each system to be below that (1-3%). Main systematics for asymmetries: Target polarization (3-4%) Beam polarization (2-3%) Dilution factor/packing factor (some cancellation) Main systematics for cross sections Acceptance/optics (~3%) Dilution factor/packing factor (some cancellation) Density (2-3%) Beam charge (1-2%) Position and angle determination ( mm, degree) Detector efficiencies (~< 1%) Background (pions, …) (1%) Radiative corrections (including radiative tails) (1-4%) … Experimental Goal/Considerations

Significant Progress in Beam Line System (T. Michalski, weekly meeting) Overview design, Region 1 and Region 2 design completed (B. Dillon-Townes) Region 3 design near completion Existing hardware items (magnets, raster, power supplies) located Most parts are ordered, machined, arriving New items (BPM/BCM electronics, Harps, BD magnets) are being taken care of BPM tests (J. Musson) BCM tests (A. Camsonne/P. Zhu) Silver Calorimeter Installation plan worked out with the 6-month-down master plan Safety/PSS Target Progress (C. Keith, bi-weekly meeting) Magnet repaired and back to JLab Design progressing well Parts are being ordered, manufactured Rotating Seal Target insertion Target material irriadiation at NIST planned (June, D. Crabb) Cold-down test Alignment Cryogenics Full polarization test Safety consderations Overview of Progress (I)

Hall A infrastructure, Beam dump, Septum (A. Gavalya, frequent meeting) Pivot platform layout Septum modification completed (Ed) and tested at low current. Septum field effects on target (Robin Wines) Scattering chamber Beam dump Radiation consideration Simulations/HRS with septa (Jixie Zhang, Min Huang,… weekly meeting ) Target field effect on kinematics Run plan optimization (Karl) Optics/calibrations Polarimetry: Moller (old-style), will work with both straight-through and chicaned beam 3 rd arm detectors (K. Allada, C.Gu) Monitoring (relative) beam and target polarizations Detect protons at 72 degrees Simple DE (thin) & E (thick) scintillators Overview of Progress (II)

3.4 GeV, 12.5 deg 2.3 GeV, 12.5 deg 3.4 GeV, 6 deg 2.3 GeV, 6 deg 1.7 GeV, 6 deg 1.2 GeV, 6 deg Polarized beam: nA up to 1 uA for optics Polarized NH 3 target at 5T, 1K Slow Raster mm diameter G e p configuration is basically g 2 p at the elastic setting Two configurations: with septa (6 degree) (target at 87 cm upstream) and without septa (12.5 degrees) (target at original pivot) G 2 p : target at 90 degrees for all and 0 degree for 3.4 GeV G E p : target at 20 degree Kinematic Settings (target field effect not taken into account)

3.4 GeV, 12.5 deg 2.3 GeV, 12.5 deg 3.4 GeV, 6 deg 2.3 GeV, 6 deg 1.7 GeV, 6 deg 1.2 GeV, 6 deg Polarized beam: nA up to 1 uA for optics Polarized NH 3 target at 5T, 1K Slow Raster mm diameter G e p configuration is basically g 2 p at the elastic setting Two configurations: with septa (6 degrees) (target at 87 cm upstream) and without septa (12.5 degrees) (target at original pivot) G 2 p : target at 90 degrees for all and 0 degree for 3.4 GeV G E p : target at 20 degree Kinematic Settings (WITH target field effect)

3.4 GeV, 12.5 deg 2.3 GeV, 12.5 deg 3.4 GeV, 6 deg 2.3 GeV, 6 deg 1.7 GeV, 6 deg (2.5T) 1.2 GeV, 6 deg (2.5T) Lower target field from 5T to 2.5T for two lowest energy settings (Raise target by 9 cm for the lower 3 settings) Try to minimized impacts 1) 2.5 T leads to lower polarization and time needed for NMR and switch-over. 2) 70 GHz EIO (Don, ok), nose piece (target group). 3) Addition optics settings for beam (Yves, done) and chicane settings (Stephanie, done). 4) Beam dump, scattering chamber (Al). 5) G E p : target at 20 degree, smaller effects. Kinematic Settings (Proposed New Settings)

Target safety: Following all the safety considerations as in SANE experiment in Hall C Additional controls in the target area (Chris/Ed/Tim) Beamline safety: PSS system to include new changes (Chicane/target/dump) (Tim) Ion chambers, viewers, thermal couples (dump) Radiation consideration: LC dump design: worked closely with RADCON group (Al) RADCON group helped with calculations of radiation levels Safety documents: RSAD (draft) already done Will work closely with RADCON group to have other radiation related documents in place ESAD for each sub-systems will reflect new changes Safety Considerations and Documents

Cost: A) Procurement part consistent with initial estimation within expectation Beam line procurement: 14 BMP electronics (absorbed in Hall A cap, ok) B) Manpower Service provider (engineering) significant increase (resolved now, ok) FY11 addition funding from DOE has been confirmed on the way. User groups contribution to procurement/machining : UVa (Don/Donal): target magnet repair, material irradiation Temple (Zein-Eddine): procurement Rutgers (Ron): machining + procurement UVa (Nilanga): machining HUJI (Guy): machining + procurement UNH (Karl): procurement Nice to have these contributions Users will continue to contribute during installation period Users onsite manpower build up nicely (next slide) Budget and User Contributions

Onsite User/Hall A People Power PhD Students: (5-7) Pengjia Zhu (USTC, advisor: Yunxiu Ye), 3 rd year, onsite, (beamline, target) Min Huang (Duke, Haiyan Gao), 3 rd year, onsite, (simulation, optics, HRS)) Chai Gu (UVa, Nilanga Liyanaga), 2 nd year, onsite, (3 rd arm, simulation) Melissa Cummings (W&M, Todd Averett), 2 nd year, onsite from 5/2011, (HRS) Ryan and another (New Hampshire, Karl Slifer), 2nd year, onsite from 5/2011, (run plan) A student from Temple (Zein-Eddine Meziani), 2 nd year, onsite from 5/2011? Postdocs: (3 + a few part time) Kalyan Allada (Hall A), beamline, 3 rd arm Jixie Zhang (Hall A): simulation, optics James (UVa New Hampshire): target, starting in the summer Xiaohui Zhan (Argonne) (onsite now), busy with other tasks (x>2 experiment) Narbe Kalantarians(UVa): part time Hovhannes Baghdasaryan (UVa): part time Sarah Philips (New Hampshire): part time? Physicists: Jian-ping Chen (Hall A): Project manager, overall coordination Alexandre Camsonne (Hall A): Beam line, DAQ Karl Slifer (New Hampershire): Overall consideration, run plan, … Guy Ron (HUJI): GEp consideration Doug Higinbotham (Hall A) (more available after SRC experiments) …

People Power and Tasks Overall coordination: Project manager (Jian-ping Chen, Hall A) Project coordinator for beamline (Tim Michalski, engineering division) Collaboration contacts: Karl Slifer (g2p), Guy Ron (GEp) Beamline Engineering Division/Accelerator Division (Tim Michalski coordinator) Engineer/design (Butch Dillon-Townes) Installation (Neil Wilson) Instrumentation/magnets/vacuum/alignment/software/radcon groups, as identified in 6-month-down schedule/planning Users (Alexandre Camsonne and Pengjia Zhu) on BCM/BPM/Slow raster… Target Target Group (Chirs Keith) UVA(Don Crabb, Donal Day, psotdocs and students) New Hampshire (Karl Slifer, James Maxwell) Other postdocs/students Hall A engineering/design: Septa/LC Dump/Pivot Layout … Hall A engineering/design team (Robin Wines, Al, Gavalya) With input from the collaboration Hall A installation Hall A installation team (Ed Folts) Simulation/optics/HRS/detectors/DAQ/3 rd Arm Users(Physicists/postdocs/students)

Main Items, each has its schedule and milestones (separate talks) Beamline Target Hall infrastructure, beam dump, septa Installation May, 2011, Main design complete. End of May, 2011 Target magnet cool-down in EEL July, 2011, Parts manufactured and arrived Aug 3, 2011, Beamline region 1 installation complete Aug 16, 2011, Beamline region 2 installation complete Mid-late Aug, 2011, Target test in EEL Sept 1, 2011, Septa, LC beam dump, scattering chamber installed. Sept 1, 2011, Target move to Hall A for installation Sept 15, 2011, Beamline region 3 installation complete Oct 1, 2011, Dump/target/magnet/chamber alignment complete Oct 10, 2011, Beamline alignment complete Nov 14, 2011, Target cool-down/polarize Nov 19, 2011, Experiment Commission Starts Jan 23 – March16, 2012, Remove Septa, Move Target back to Pivot May 2012, End of experiment data taking Schedule and Milestones