Presentation is loading. Please wait.

Presentation is loading. Please wait.

PREX / CREX Collaboration Meeting and Status

Similar presentations


Presentation on theme: "PREX / CREX Collaboration Meeting and Status"— Presentation transcript:

1 PREX / CREX Collaboration Meeting and Status
Oct 1 – 2, 2017 Report by Robert Michaels p1 / 11

2 PREX and CREX Asymmetry is non-zero due to weak interaction.
208Pb 48Ca PREX-I PREX-II CREX PREX-I : PRL 108 (2012) 227 citations Rn - Rp (fm) Asymmetry is non-zero due to weak interaction. Weak interaction “sees” neutrons (electromagnetic sees protons). number of nucleons A Neutron skin Lead Nucleus Can theory predict its size ? Rn Rp p2 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

3 Engineering Progress -- Robin Wines
Skyshine shield Target Septum Magnet collimator HRS Quad 1 beam Man-weeks design 24 Man-weeks engineering (minus target) Jessie Butler: ~70 days installation p3 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

4 Target -- Silviu Covrig
Target group responsible CFDFAC thermal calculations performed to understand and improve the design port p4 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

5 Radiation Simulation -- Ciprian Gal (UVa)
Shielding Design Target and Septum Region HRS Q1 Skyshine shield Skyshine shield target septum plastic shield HRS controls New since ERR : Beam Dump being considered (work in progress) Beam dump Need concrete shielding ? R. Michaels, Hall A Mtg, Oct 3, 2017

6 Magnetic Shielding -- Jay Benesch
Confirmed that Al Gavalya’s shield design inside septum is good Proposed a 3 mm thick conical carbon steel shield for HRS quad p6 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

7 Integrating Detectors -- Dustin McNulty
Placed above the VDCs in HRS detector stack Idaho State University Quartz bar PMT Two (redundant) quartz bars, which intercept elastically scattered electrons. We integrate this signal for our main signal. Design similar to PREX-I. Beam tests at Mainz confirm simulation. p7 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

8 GEMs -- Dustin McNulty Supplement the VDCs in HRS
Idaho State University Supplement the VDCs in HRS So we can do Q2 measurements at ~1 uA (rates high) These are “small” 10 x 20 cm2 400 um pitch Capitalizes on SBS developments (INFN / Uva) p8 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

9 PREX/CREX Detectors -- Dustin McNulty
GEMs (3) Quartz (2) Quartz (2) p9 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

10 “SAM” (Lumi monitor) -- Tao Ye
Stony Brook University A source of extremely high rate  Establishes a “noise floor” Corrections for beam noise are consistent with expected beam position monitor resolution. BCM resolution 12 ppm Result: SAM statistical level 60 ppm p10 / 11 R. Michaels, Hall A Mtg, Oct 3, 2017

11 Other Topics at PREX/CREX Meeting Oct 1-2, 2017 at JLab
Software and Optics Seamus Riordan (Argonne) Ryan Richards (StonyBrook) Detectors Tyler Kutz (StonyBrook) Carlos Bula (Idaho St) 4K running Grigory Eremeev (Jlab) Nonlinearities Devi Adhikari (Idaho St) Moller Polarimeter Bill Henry (Temple) Kerr Studies Fernando Araiza Gonzalez (StonyBrook) Compton Polarimeter Juan Carlos Cornejo (CMU) Polarized Source Joe Grames (Jlab) Caryn Palatchi (Uva) DAQ Status Bob Michaels (Jlab) Scheduling Thia Keppel (Jlab) Last page R. Michaels, Hall A Mtg, Oct 3, 2017


Download ppt "PREX / CREX Collaboration Meeting and Status"

Similar presentations


Ads by Google