GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Matthew 22:42 42 What think ye of Christ? Whose son is He? Matthew 16:13.
Advanced Piloting Cruise Plot.
1
E166 Collaboration Meeting Princeton, May 2006 e+ Analyzing Power K. Peter Schüler e+ Analyzing Power: what we know from old G EANT 3 simulations.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
OPTN Modifications to Heart Allocation Policy Implemented July 12, 2006 Changed the allocation order for medically urgent (Status 1A and 1B) patients Policy.
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Robert J. Feuerbach Jefferson Lab Constructed from contributions from the HAPPEX Collaboration Hall A Collaboration Meeting December 5, 2005 HAPPEX-II.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)
David Burdett May 11, 2004 Package Binding for WS CDL.
AS. 02/03 Finding fractions of a quantity AS. 02/03.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
Learning to show the remainder
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
The 5S numbers game..
Year End T&L and Leave Processing December 9, 2004 SSW Auditorium Presented by Susan Beckerman.
Richmond House, Liverpool (1) 26 th January 2004.
Chapter 7: Steady-State Errors 1 ©2000, John Wiley & Sons, Inc. Nise/Control Systems Engineering, 3/e Chapter 7 Steady-State Errors.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT
Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb 14: :00 Thursday 9 th Feb 14: :00.
A Strong Church. Introduction Our goal should be to help our congregation become a strong church. We better appreciate the need for a strong church when.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1..
Adding Up In Chunks.
Before Between After.
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
HyCal reconstruction: current situation current situation and future tasks. V. Mochalov, IHEP (Protvino)
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
= 2 = 4 = 5 = 10 = 12. Estimating Non-Perfect Squares For Integers that are NOT perfect squares, you can estimate a square root = 2.83.
We will resume in: 25 Minutes.
Figure Essential Cell Biology (© Garland Science 2010)
Clock will move after 1 minute
PSSA Preparation.
Number Factors and Multiples Saturday, 09 September 2006 ©RSH.
Physics for Scientists & Engineers, 3rd Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Immunobiology: The Immune System in Health & Disease Sixth Edition
EXAMPLE 3 Use synthetic division
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Presentation transcript:

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons John J. LeRose

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Large Scale Experiment Polarized Target/Beam Neutron Arm BigBite with detectors Scheduled to run: Feb. 24-May 10, 2006

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Neutron Arm Combined weight of modules and shielding ~83 tons

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Polarized 3 HeTarget Using new hybrid cells 7-8 working cells in-hand 4 cells P 50% in the lab (53% max) Short spin-up time implies reduction of P by beam will be small

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Project Milestones Nov completion of ND testing -done Nov laser safety review -done Nov first day of down, completion of ND testing, begin decabling. –done Dec 5 – Begin moving BigBite detector package, electronics, and cables (on track) Dec full safety review for GEn (include beamline testing with conclusion of rupture tests) (Committee selected and scheduled for December ?) Dec target motion system working on test bench Dec 15-- septum off pivot, begin moving neutron arm Jan 2 -- target testing complete, dissassemble target, ready to move into the Hall Jan install Big Bite stand Jan operational checkout of polarized target Feb 9 -- Big Bite operational checkout Feb target button up Feb 17 – Laser safety inspection Feb neutron arm complete with shielding

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Thursday 12/1/05

GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Outlook Detector testing and installation are on-track Expected beam and target polarizations are better than anticipated in the original proposal (86% and 50% vs. 75% and 40%) Much work remains, any and all help will be greatly appreciated Its not too soon to signup for shifts