National Thousands Block Number Pooling Services NANC Meeting January 13, 2004.

Slides:



Advertisements
Similar presentations
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
UNITED NATIONS Shipment Details Report – January 2006.
1 National Thousands Block Number Pooling Services NANC Meeting March 15, 2005.
National Thousands Block Number Pooling Services NANC Meeting September 25, 2003.
National Thousands Block Number Pooling Services NANC Meeting May 13, 2003.
National Thousands Block Number Pooling Services NANC Meeting May 18, 2004.
National Thousands Block Number Pooling Services NANC Meeting July 13, 2004.
1 National Thousands Block Number Pooling Services NANC Meeting January 19, 2005.
National Thousands Block Number Pooling Services NANC Meeting July 15, 2003.
1 National Thousands Block Number Pooling Services NANC Meeting November 4, 2004.
National Thousands Block Number Pooling Services NANC Meeting March 19, 2003.
National Thousands Block Number Pooling Services NANC Meeting November 5, 2003.
1 National Thousands Block Number Pooling Services NANC Meeting September 14, 2004.
NANC Report Number Oversight Working Group (NOWG) January 22, 2003 Co-Chairs: Karen Mulberry, WorldCom Jim Castagna, Verizon.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
National Thousands Block Number Pooling Services NANC Meeting November 19, 2002.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
ABC Technology Project
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Presentation transcript:

National Thousands Block Number Pooling Services NANC Meeting January 13, 2004

2 Implementation Update As of December 12, 2003, pooling was implemented in all area codes in the national rollout schedule [except Alaska]. On December 19, 2003, the FCC advised the Pooling Administrator (PA) to update the list of Top 100 Metropolitan Statistical Areas (MSAs) to correspond to the MSA information provided by the Office of Management and Budget in OMB Bulletin and its supporting documentation. The PA has completed the updates to the list of Top 100 MSAs, and has added new ones to the existing list. No MSAs were removed from the list, even if they changed from a previous Top 100 designation to non Top-100.

3 Implementation Update Continued Approximately 1,100 additional rate centers will now be included as either mandatory (M) or single service provider (M*) rate centers. Implementation meetings to develop milestone dates for each affected area code will be completed by April 1. More than one area code may be included in a meeting. The implementation meeting process will be similar to that of the national rollout.

4 Change Orders Status of Change Orders Approved: 1, 2, 4, 7, 8, 10, 12, 13, 14, 18, 19, 20, 21, 22 Withdrawn: 5, 6, 16, 17, 23 Rejected: 3, 6, 9, 11, 15 Outstanding: 24 New: 25 –filed November 20, 2003 re: request from carrier for a Part 4 PAS report..

5 Pooling Administration System (PAS) Facts Total assigned blocks in PAS January, ,023 December 31, ,027 Increase of 19,004

6 Summary of Reports to the FCC ApprovedDeniedSuspendedTOTAL Quantity of Applications ApprovedDeniedSuspendedTOTAL Quantity of Applications

7 Summary of Reports Continued System Performance Report November, 2003 Report (10/1 thru 10/31 data) Percent availability: 100 Hours/Minutes of Availability: 744 Number of instances of unavailability: 0 December, 2003 Report (11/1 thru 11/30 data) Percent availability: 100 Hours/Minutes of Availability: 720 Number of instances of unavailability: 0

NeuStar PA Holidays* New Years Day Thursday, January 1 Memorial DayMonday, May 31 Independence Day**Monday, July 5 Labor DayMonday, September 6 ThanksgivingThursday, November 25 Christmas**Friday, December 24 * NeuStar PA offices only; other NeuStar divisions may have a different schedule. **observed