Presentation is loading. Please wait.

Presentation is loading. Please wait.

NANC Report Number Oversight Working Group (NOWG) January 22, 2003 Co-Chairs: Karen Mulberry, WorldCom Jim Castagna, Verizon.

Similar presentations


Presentation on theme: "NANC Report Number Oversight Working Group (NOWG) January 22, 2003 Co-Chairs: Karen Mulberry, WorldCom Jim Castagna, Verizon."— Presentation transcript:

1 NANC Report Number Oversight Working Group (NOWG) January 22, 2003 Co-Chairs: Karen Mulberry, WorldCom Jim Castagna, Verizon

2 01/22/2003NOWG NANC Report2 Summary PAS Forecasting Work Around Recommendation PA Change Order Recommendations 2002 NANPA Performance Survey Status 2002 NANPA PIP Status Meeting Schedule Attachments - Tracking Documents -PAS Work Around Letter -PA Change Order Recommendations -Table of NANPA Complaints -NOWG Project Status Table

3 01/22/2003NOWG NANC Report3 PAS Forecasting Work Around Recommendation NANC 11-19-2002 Action Item: NOWG will consider feasibility of work arounds so that carriers can obtain number blocks if request exceeds PAS forecast. –Considered the feasibility of work-arounds that would allow service providers (SPs) the ability to be assigned blocks by PAS even if the quantity of blocks requested exceeds the SPs PAS forecast. –Work-around focused on eliminating the need for an SP to provide the on the spot forecast currently required by PAS when the quantity of blocks requested exceeds the embedded PAS forecast. –The NOWG was unable to identify a work-around that could be implemented by SPs. However, the NOWG did identify a solution that may be easily implemented by NeuStar in the short term. Recommendation: PAS should override and auto-update the SPs embedded forecast for the current month based upon the actual number of blocks requested and should discontinue the present practice of informing the applicant Resource Request Denied: Requesting more blocks than forecasted for OCN (XXXX). PAS would continue to employ its existing logic for pool replenishment, which appears to be triggered by forecasts and not by block assignments.

4 01/22/2003NOWG NANC Report4 PA Change Order Recommendations Developed template format for change order analysis. Reviewed pending PA Change Orders and prepared recommendations for the FCC. Recommendations forwarded to the FCC and NANC Chair on December 6, 2002 Eight Recommendations completed.

5 01/22/2003NOWG NANC Report5 2002 NANPA Performance Survey Status Survey response deadline extended to January 15th. Respondents tabulated to date: Industry and Other146 Regulatory Agencies27 Timeline: 1-23NANPA Operational Review - Washington DC 1-28/30 NANPA Operational Review - Concord CA 2-24/28Data analysis and report development MarchFinal Report to NANC

6 01/22/2003NOWG NANC Report6 2002 NANPA Performance Improvement Plan Status PIP 1 - Code Administration System (CAS) 1. Analysis and recommendations gathered from CAS Users Survey - Suspended pending resolution of identified issues. 2.Program to increase CAS usage - Completed 3.Data discrepancies (LERG, CAS, NRUF) - Investigating solutions to correct differences. 4.Reconcile CAS capabilities with Lockheed proposal - Suspended by new requirements PIP 2 - NANPA Web Site Completed PIP 3 - Code Administration Completed

7 01/22/2003NOWG NANC Report7 Status NANPA 2001-2002 Performance Improvement Plan PIP 4 - Relief Planning Completed PIP 5 - NRUF 1.Revised exhaust projection posted to NANPA web site - Ongoing 2.Update NRUF Job Aide - Completed 3.NRUF data proactively provided to State Commissions - Ongoing PIP 6 - Measurements 1.NRUF performance measurements added - Completed PIP 7 - General 1.Leadership on numbering issues - Ongoing 2.Distribute and explain FCC directives regarding number administration - Ongoing

8 01/22/2003NOWG NANC Report8 Upcoming Meeting Schedule Contact either of the Co-Chairs for complete meeting or conference call details WG meeting records and documents posted on the NANC Chair web site

9 01/22/2003NOWG NANC Report9 Attachments - Tracking Documents PAS Forecasting Work Around Recommendation Letter PA Change Order Recommendations (#6, #10, #11, #12, #13, #14, #15, #16) PA Change Order Tracking Summary Table of NANPA Complaints NOWG Project Table - tracking WG Activities/Timelines


Download ppt "NANC Report Number Oversight Working Group (NOWG) January 22, 2003 Co-Chairs: Karen Mulberry, WorldCom Jim Castagna, Verizon."

Similar presentations


Ads by Google