Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.

Slides:



Advertisements
Similar presentations
WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
Advertisements

November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
Alan Cross, European Commission FP7 Open Day Riga, 16 November 2010 EU Framework Programme: taking stock, and looking ahead.
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
22 Feb 2007EU-Russia Co-operation1 Dr. Stephan Pascall Advisor to the Director Directorate G: Components and Systems DG Information Society and Media European.
Bond.org.uk The EU institutional reforms and next EU Multiannual Financial Framework – Bond and Concord’s work 25 October 2010.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
Research Infrastructures The Research Infrastructures in FP7.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
R. Aleksan EuCARD’13 June th, 2013 The role of the EC projects Round Table 1.General Context 2.Introduction 3.Views from the main players 4.Conclusion.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
Research Funding from Europe Framework Programmes Created by EU Treaty Multi-annual programmes to undertake Research and Technological Development Main.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
ESPG R. Aleksan November 28 th, 2011 Accelerator R&D Accelerator R&D 1.Introduction 2.Accelerator Science and Technology 3.Conclusion.
European design study on Neutrinofacilities - Euronu within FP7.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
WP4 - Design Studies. Outline Status of FP6 Design Studies Consequences High power targets MICE Neutrino detector R&D FFAGs WDS Status.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
FP7 – Nov Towards the EU Seventh Framework Programme (FP7) European Commission Research DG.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
Poznan 19 April Kwietnia 2005 Poznan FP6 The Next Calls for 2005 Technology Platforms FP7.
EU Research and Innovation Strategies: Lessons for Thailand and Emerging Economies EU Innovation Strategy Sascha Ruhland Fraunhofer ISI, Karlsruhe.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
China July 2004 The European Union Programmes for EU-China Cooperation in ICT.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
Introduction to the Non-Scaling Electron Model Rob Edgecock CCLRC Rutherford Appleton Laboratory For the EMMA Collaboration Motivation Basic EMMA parameters.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
Report on ECFA Gerard van der Steenhoven Based on plenary ECFA meeting of 26 Nov. CERN Issues: – Business as usual (chair, CERN, DESY) – ESGARD.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
TPB meeting R. Aleksan September 2 nd, 2009 Structuring further Accelerator R&D In Europe 1.Introduction 2.General Context 3.Building TIARA 4.Conclusion.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
Accelerator R&D for Future Neutrino Projects
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
TIARA: Structuring further Accelerator R&D in Europe
EU-Russia Cooperation in the Areas of Science, Research and Innovation
What is ATTRACT? ATTRACT (breAkThrough innovaTion pRogrAmme for deteCtor / inrAstructure eCosysTem) A proposal from CERN to the European Commission (EC)
Outline: Why now ? What ? How ?
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Accelerator R&D for Future Neutrino Projects
FP6 Design Studies ESGARD meeting 3rd September – from Roy Aleksan
as of today 123 registered participants
European Environment Agency
The ERA.Net instrument Aims and benefits
EUSDR Action Plan - Revision
Introduction to the Non-Scaling Electron Model
A High Intensity Neutrino Oscillation Facility in Europe
TOP 3: The JPI CH future strategy within the GPC Working Group
Presentation transcript:

Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping into FP7 NB Replacing Pasini and Aleksan!

Framework Programmes Created by EU Treaty Multi-annual programmes to undertake Research and Technological Development Main method of funding science in EU Started 1984; normally 5 years with 1 year overlap FP6: “At the Lisbon Summit in March 2000, EU Governments called for a better use of European research efforts through the creation of an internal market for science and technology – a ‘European Research Area’ (ERA). FP6 is the financial instrument to make ERA a reality.” FP7: “designed to build on the achievements of its predecessor towards the creation of the European Research Area, and carry it further towards the development of the knowledge economy and society in Europe.”

FP6 First entry of PP in FPs Coordinated by ESGARD; chair Roy Aleksan CARE: - I3 (NA and JRA) M€ from EU; 35.1M€ total Design studies: - EuroTEV - EURISOL - NuFact DS: didn’t get to starting post NESTs: - 3 submitted - 1 successful (wake field acceleration)

Introduction to FP7 Due to be “fully operational” in January 2007 Budgets not yet fully agreed by EU parliament - proposal submitted 6 th April - agreement “within reach” - still a lot of uncertainty Overall: - 7 year programme - total budget: 72.7B€! - RI: 4.0B€ - much bigger than FP6 But  delay! - 1 st call: Spring ’07 (CNI) - 2 nd call: Nov ’07 (DS & I3) Basically, same programmes as FP6

Programmes 3/4 programmes of interest, under RIs: Construction of New Infrastructure: - top down approach - ESFRI crucial - EuroTEV, EURISOL, NuFact: not eligible Design Studies: - only FS part of FP6 – no R&D - max. ~2M€ I3: - NAs, JRAs, etc, as in FP6 - limited to participants (?) Others? e.g NESTs, etc Cost models: - only ~FC - prob. 25% matching funding

Neutrino LOI ESGARD request for LOI: - input to CERN strategy group - input to ESGARD - deadline: 28 th April BENE SG has prepared one 52(?) institutes from 14(?) European countries signed Identifies need for: - feasibility study - hardware R&D on accelerators - R&D on neutrino detectors - physics studies Aim is to part fund EU contribution to IDS

Mapping onto FP7 More than 1 proposal required! FS  Design Study - only 2M€ available + matching funds - maximum one CDR? - need 2 DS or selection mechanism Accelerator R&D: - proton driver, target, collection  JRAs - MICE phase 2  JRA - FFAGs  Oncology or technology programme(?) - RF, SC magnets, etc  JRAs(?) Detector R&D  JRAs, ? Physics  BENE, ?

Mapping onto FP7 Notes: - very early days - JRAs: generic, need I3 - neutrino accelerator I3 will lose out vs CARE2 - neutrino detector I3 may be possible - resources will be limited - we are unlikely to be able to do everything - selection is likely - essential to have (at least one) CDR by ~2012 From ISS & IDS