AquaBlend Vs Dosatron D25

Slides:



Advertisements
Similar presentations
Steering Systems Chapter 44.
Advertisements

Service Tips April COOLING SYSTEM To check and/or fill the cooling system it is necessary to remove the rear fender, the fuel tank (photo 1) and.
GOODSON Tools and Supplies for Engine Builders Calibrating and Maintaining Your Precision Machinists Level.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
MOTORCYCLE TOOLS Multifunction tools 7 Maintenance sets 6 Axle and bearing 5 Wheel, spoke and suspension 4 Tools for drives 3 Ignition and carburation.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Service Brake Adjustments Eric Shogren. Tools Must Haves Wrench 4 Jack Stands Nice to Have Adjusting Board.
Series I Pump and Prep Pump Prior to removing the head, rotate the flag on the top of the motor so the piston is fully retracted. Remove thumb nuts.
Engine Service. Cylinder heads ä ä 1. Clean ä ä 2. Check for Cracks inspect exhaust port and in between valves ä ä 3. Check for Warpage ä ä 4. Inspect.
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
TrueSTEAM™ Humidification Systems Module 3: Basic Installation.
New Products 5204 Openable API Bottom Loading Adapter Integrated flow indicator Longer sight glass Teflon lip seal in stuffing box Ergonomic aluminum.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Unit 5 Bench Testing, Maintenance, and Troubleshooting.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
Certified Service Training Start Centrifugal Trash Pumps.
"AIR COOLER" Heat Exchanger
Summit’s “TOOLBOX SAFETY TALK”
SAFETY TALK - SLIDE 1 OF 10 Elkhart Products Corporation 02/00 WELCOME THANKS TO ELKHART PRODUCTS CORPORATION FOR THIS “TOOLBOX SAFETY TALK” OSHA 29 CFR.
MACHSEAL 101. Design Information Stationary rotary face seal that utilizes axial spring force to positively mate the optically flat seal face against.
Powered Air-Purifying PARTICLE Respirator (PAPR) Copyright © 2013 by The S.E.A. Group.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Powered Air-Purifying Respirator (PAPR) Copyright © 2015 by The S.E.A. Group.
General idea of a couple of check rod system and adjustments
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
The Airtex Educational Partnership (AEP) was started several years ago by Airtex Automotive Division as a way to merge corporate automotive expertise with.
Bachelor of Technology Mechanical
ELECTRONIC FUEL INJECTION COMPONENTS
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman IN-VEHICLE ENGINE SERVICE 27.
Diagnostics – Quaternary Pump & Fraction Collector Analytical 920 LCSemi-Prep 940 LC.
Principles of Physics Meters and Motors. A wire loop placed in a uniform magnetic field experiences a turning force The loop only rotates 90˚, then stops.
C.R.ENGINEERING COLLEGE
PARKING BRAKE OPERATION, DIAGNOSIS, AND SERVICE
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
Small Hole Gauges & Telescoping Gauges. Small Hole Gauges These gauges are used to measure small holes that you need to know the exact measurement.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
800 (M2,M3,M4) ½”-2”. Modification Overview  The original model 800 was produced from  The 800M2 was produced from  The 800M3.
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
Dyson Vacuum Cleaners The Design Cycle. Click anywhere to start. Source:
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Disassemble notes: To disassemble the shaft assay, pipette lower part must be disconnected (unscrewed) from the handle. Tip ejector may be unscrewed only.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
Discover the Dosmatic Difference Trouble Shooting your Dosmatic injector for years of service.
On/off switch Depth stop Quill lock chuck Tilting table Lower table or base Variable speed pilot wheel motor Feed handle Table locking clamp column.
MixRite Water Driven Injectors Training
Internal and External Screw Threads
Annex 5 - Tower and Lock installation
Inspection of stock materials for defects
826YD 21/2”-10”.
Care and Maintenance of Super Clamps
When to use them, why you should use them, and how they work!
Application Operation principle Advantages Highlights Comparison
800 (M2,M3,M4) ½”-2”.
Fuel Supply System Service
Cylinder Head: Springs, Valves, and Valve Seats
¾”-2”.
Service Tips April 2005.
Micrometer.
909 3/4”-2”.
950, 950XL, 950XLT ¾”-2”.
880V 21/2”-10”.
PUMPS AND DRIVERS NCCER
Presentation transcript:

AquaBlend Vs Dosatron D25 Technical Review

Competitive Analysis AquaBlend VsD25 Fully rotating lower end Can adjust pump without spinning hose Ratio & percentage scales Larger printing that is always facing out for easy reading Quad adjustment treads Allows 4x quicker, smoother, and accurate injection setting Integrated adjustment lock Just click it to lock it! Complete tool free maintenance All service can be completed in the field without the need for tools Exact adjustment sights Arrows in the adjustment sight point to the precise setting Specifically engineered strainer/filter All plastic, chemically resistant, weighted, and designed not to clog

Specifications Dosatron – D25 AquaBlend Flow Range 0.05 – 11 GPM 10 – 2500 L/H Pressure Range 4.3 – 85 PSI 0.3 – 6 BAR 5 – 90 PSI 0.34 – 6.2 BAR Injection Range 500:1 – 50:1 0.2% - 2% 100:1 – 20:1 1% - 5% 200:1 – 20:1 0.5% - 5% AquaBlend 5% has a larger injection range than the Dosatron 5%. This make the unit more accurate at the popular 1% setting.

Lower End Service Tools Required No Tools Required LOWER END SCREWS Dosatron AquaBlend Use a screw driver to remove the (4) screws holding the lower end Remove the lower end by turning counter-clockwise Why is this important? Maintenance on the AquaBlend is easier. No tools are required when working on the AquaBlend Tools Required No Tools Required

Dosatron shaft cannot be removed Service and Repairs Dosatron AquaBlend Plunger Shaft cannot be removed Plunger shaft can be removed with a ¼ turn Why is this important? Maintenance on the AquaBlend is easier. The plunger seal is the most common wear item. For the D25, you can only replace the plunger seal by removing it from the shaft D25 Dosatron shaft cannot be removed Plunger Seal

Entire shaft can be removed and replaced on the AquaBlend Converting from 2% to 5% Dosatron AquaBlend Plunger Shaft cannot be removed Plunger shaft can be removed with a ¼ turn Why is this important? Modularity. Pumps can changed from a 2% unit to a 5% unit simply by buying a kit, not an entire new unit. This saves money, and reduces inventory. Entire shaft can be removed and replaced on the AquaBlend

Motor Piston Design Screws on Dosatron motor sealed with O-rings AquaBlend (4) Screws on the piston are sealed with o-rings Screws on the piston go into blind holes Why is this important? Improved performance at low flows. The use of thru holes and o-rings on the D25 creates a path for leaks. The AquaBlend cannot leak because the screw holes do not go thru the piston. This is critical in the first few days of a new flock. Screws on Dosatron motor sealed with O-rings Blind holes on AquaBlend no O-rings required

Dosatron arm not guided Motor Piston Design Dosatron AquaBlend Poppet arm is not guided Poppet arm is guided Why is this important? Improved performance at low flows and increased life. By guiding the poppet arm, it is easier to seat on the chamfer. The reduced movement of the arm means the seal has less side to side movement, which reduces wear on the seal. Dosatron arm not guided AquaBlend arm guided

Motor Piston Design Dosatron springs on tight spring rails AquaBlend Tight unsmoothed spring rails Specifically engineered spring rails Why is this important? Improved performance at low flows and spring life. By specifically engineering the spring rails, Hydro Systems has reduced friction and wear on the springs. The reduced friction of the arm means springs last longer. Dosatron springs on tight spring rails AquaBlend springs on engineered rails

Other Systems Foaming Equipment Twist II Clean Filters

Hydro Technical Solutions Ltd Unit D24, Heritage Business Park, Heritage way, Gosport, Hants, PO12 4BG www.hytecsol.com 02392 520 435