ASAS TN – Third Workshop – Toulouse 19-21 April 2004 Session 3 – THALES ATM Presentation Ground Systems for ADS-B based Surveillance Presenter: Peter HOWLETT.

Slides:



Advertisements
Similar presentations
U.S. Plans for ADS-B Briefing for
Advertisements

Flexible Airborne Architecture
SATELLITE DATA LINK SYSTEM (SDLS)
United States of America (USA) Plans for ADS-B Briefing for Seminar on Implementation of Data Link and SATCOM Communications November 2003 Bangkok,
1 Global Satellite CNS Program. 2 Background/status –Supplemental FY 2002 appropriation provided funding to explore secure global satellite CNS for air.
ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Air Traffic Management
ADS-B Seminar and 11th Meeting of ADS-B SITF
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Agenda Super-Cells Multi-Cells
Orion Telecom Networks Inc VCL-E3 OLTE 34Mbps Optical Line Transmission Equipment Slide 1 Updated : January 1st, , Avenue of Fountains,
Valiant Communications Limited Slide 1 Updated : January, 2006 V aliant C ommunications L imited Telecom Transmission Solutions VCL-E3 OLTE 34Mbps.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
A new Network Concept for transporting and storing digital video…………
ASAS TN Third Workshop, April 2004, Toulouse 1 ASAS Implementation in Avionics Pierre GAYRAUD Thales Avionics in collaboration with ACSS.
Implementation of ADS-B in Australia ASAS-TN Workshop Malmo, October 2003 Implementation of ADS-B in Australia ASAS-TN Workshop Malmo, October 2003 Bob.
Applications from packages I to III
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
ATN Subnetwork Implementation:
EVENLODE Air Equipment EVENLODE Power Supply, Heat Exchange & Power Amplifier EVENLODE Video Encoder, Transceiver & Up Converter.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
The University of Bolton School of Business & Creative Technologies Wireless Networks Introduction 1.
Airports Authorities of India Jaipur Airports Authorities of India Jaipur
FOX AVL SYSTEM Satellite vehicle locating, tracking and fleet management.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
1 2 nd Australian based CGSIC Meeting Ground based Regional Augmentation System (GRAS) Keith McPherson, Manager GNSS.
Broadband Access Solutions via Satellite Sergey Eleferov Russian Satellite Communications Company Satellite Communications Centre “DUBNA”
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
2 nd Workshop, April 2006 Session 4: Integrating ASAS in an evolving ATM system.
ASAS TN2 Briefing Cyro Stone 15 April 2008.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
CDMA X EV-DO by S.Vidhya. CDMA 2000 CDMA2000 (also known as C2K or IMT Multi ‑ Carrier (IMT ‑ MC)) is a family of 3G[1] mobile technology standards,
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
Rohde & Schwarz Topex TOPEX IP Radio Gateway July 2011.
Broadcasting devices. Broadcasting devices overview USB Power Monitor, type channel, 4-line display, USB, Digital out, Opto out WEB Power Monitor,
PBN Performance Based Navigation
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Traffic Alert and Collision Avoidance System -TACS II
SIP/2012/ASBU/Nairobi-WP/19
1030/1090 MHZ SECURITY MONITORING SYSTÉM
Chris Shaw, EUROCONTROL Experimental Centre
The Air Ground Datalink Server (AGDS)
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Network Administration CNET-443
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Capabilities of TIS-B for Supporting ASAS
QUICK GUIDE TO GETTING COMPLIANT
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
ICAO ACP WG-N meeting Use of IP in ARTAS
Presentation transcript:

ASAS TN – Third Workshop – Toulouse April 2004 Session 3 – THALES ATM Presentation Ground Systems for ADS-B based Surveillance Presenter: Peter HOWLETT

2 April 2004 AIR TRAFFIC MANAGEMENT Introduction & Overview Australian Upper Airspace Project: an example of an early operational application of ADS-B-NRA AS 680: An example of an ADS-B Ground Station Typical issues Redundancy Coverage overlap Ground Station Status Monitoring Concluding Remarks

3 April 2004 AIR TRAFFIC MANAGEMENT Introduction & Overview Australian Upper Airspace Project: an example of an early operational application of ADS-B-NRA AS 680: An example of an ADS-B Ground Station Typical issues Redundancy Coverage overlap Ground Station Status Monitoring Concluding Remarks

4 April 2004 AIR TRAFFIC MANAGEMENT Australian Upper Airspace Project Project initiated by Airservices Australia Radar-like separation services above FL300, based on ADS-B Will be presented tomorrow by Greg Dunstone (Airservices Australia) Contract recently awarded to Thales ATM for the provision of 56 ADS-B Ground Stations A good example to illustrate ground systems associated with ADS-B NRA … and some typical issues to be addressed

5 April 2004 AIR TRAFFIC MANAGEMENT Australian Upper Airspace Project - GS System Architecture

6 April 2004 AIR TRAFFIC MANAGEMENT Introduction & Overview Australian Upper Airspace Project: an example of an early operational application of ADS-B-NRA AS 680: An example of an ADS-B Ground Station Typical issues Redundancy Coverage overlap Ground Station Status Monitoring Concluding Remarks

7 April 2004 AIR TRAFFIC MANAGEMENT AS 680 Key Features ADS-B reporting based on Mode S extended Squitter Long Range Capability (250 NM at FL300) ASTERIX Cat 21 Output Compact, autonomous Unit for unmanned Operation Automated Built-In Testing down to LRU Level Flexible Network communication Full Remote Control via SNMP down to LRU Level Range of options, e.g. GPS Time Reference System Uninterrupted Power Supply Outdoor packaging Selected by Airservices Australia for the Upper Airspace Program : coverage of Australian airspace above FL300

8 April 2004 AIR TRAFFIC MANAGEMENT 3 m Main AS 680 Components LNA Low-Noise Amplifier SPC Power PC SPB Thales ATM Signal Processing Board RXU Thales ATM Receiver Unit FBX Filterbox Omni Antenna

9 April 2004 AIR TRAFFIC MANAGEMENT AS 680 Technical Data Max. demonstrated Range:250 NM Sensitivity:- 90 dBm Dynamic Range:80 dB Mean Pos. update rate:1 / s Localisation capacity:150 Targets/s Time of Arrival resolution:128 MHz (7 ns / 2.4 m) Power Supply: V / Hz Dimensions (w x h x d):483 x 178 x 350 (19”,4HU) Weight:19.5 kg Site Monitor Module:0 dBm, 1090 MHz ICAO Annex 10 compliant

10 April 2004 AIR TRAFFIC MANAGEMENT Technical Tools Technical Traffic Situation Display Technical System Control User Interface Recording and Playback Facility

11 April 2004 AIR TRAFFIC MANAGEMENT Introduction & Overview Australian Upper Airspace Project: an example of an early operational application of ADS-B-NRA AS 680: An example of an ADS-B Ground Station Typical issues Redundancy Coverage overlap Ground Station Status Monitoring Concluding Remarks

12 April 2004 AIR TRAFFIC MANAGEMENT Redundancy Need to ensure availability => redundancy throughout the system At GS level (HW failures) At communication network level At processing level in ATC centre

13 April 2004 AIR TRAFFIC MANAGEMENT Redundancy at Ground Station level ADS-B RX 1ADS-B RX 2 To Antenna 1 Monitor Probe GPS RX Antenna 1GPS RX Antenna 2 To Antenna 2 Monitor Probe Ground Station 1Ground Station 2 ADS-B RX Antenna 1ADS-B RX Antenna 2 Network Connection to TAAATS To Antenna 1 Monitor Probe To Antenna 2 Monitor Probe

14 April 2004 AIR TRAFFIC MANAGEMENT Redundancy at Communication level 2-way Satellite or Terrestrial Comm. Link. AS 680 All Ground Station Data, i.e.: ADS-B Operational Data as Asterix Cat 21 as UDP Multicast and Maintenance Data as SNMP on UDP/IP TAAATS Melbourne TAAATS Brisbane RCMS MelbourneRCMS Brisbane AS 680 Ground Network ADS-B LAN A ADS-B LAN B ADS-B LAN A ADS-B LAN B SSF TAAATS Time Server Service LAN TAAATS Time Server ADS-B Test Bed All Ground Station Data, i.e.: ADS-B Operational Data as Asterix Cat 21 as UDP Multicast and Maintenance Data as SNMP on UDP/IP

15 April 2004 AIR TRAFFIC MANAGEMENT Redundancy at Processing Level (example) FDP ADSB FP ADSB BYPASS Op LAN 1 Op LAN 2 Serv LAN 3 FDP SNMAP Upgrade MMI FP MTP Radar data FP RTP ADS- B LAN FDP ADSBP Ground station 1A Ground station1B * Ground station 2A Ground station2B * Ground station3A Ground station3B ATMBMux ATMBMux Router if required ATMBMux ATMBMux Router if required ATMBMux ATMBMux Router if required ATMBMux ATMBMux Router if required ATMBMux ATMBMux Router if required ATMBMux ATMBMux Router if required DDN or VSAT link DDN or VSAT link DDN or VSAT link DDN or VSAT link DDN or VSAT link DDN or VSAT link Eurocat LAN * = ADS-Boptional groundstations VHFOptionalsite Mux = Multiplexer

16 April 2004 AIR TRAFFIC MANAGEMENT Introduction & Overview Australian Upper Airspace Project: an example of an early operational application of ADS-B-NRA AS 680: An example of an ADS-B Ground Station Typical issues Redundancy Coverage overlap Ground Station Status Monitoring Concluding Remarks

17 April 2004 AIR TRAFFIC MANAGEMENT Coverage Overlap GS1 A/B GS2 A/B GS4 A/B 1 Aircraft can be received by several Ground Stations Need to eliminate duplicate targets Function performed at Centre level in ADSBP GS3 A/B ADSBP FDP SNMAP MMI couplingAlerts Coupling/ APR ADS-B tracks ADS-B Operational Data in ASTERIX CAT 21 ABROAD Airborne Data Reception ADS-B Reports Data Processing/ Distribution Conversion Semantic check Syntactic check Processing Duplicates Extrapolation/Sync

18 April 2004 AIR TRAFFIC MANAGEMENT Introduction & Overview Australian Upper Airspace Project: an example of an early operational application of ADS-B-NRA AS 680: An example of an ADS-B Ground Station Typical issues Redundancy Coverage overlap Ground Station Status Monitoring Concluding Remarks

19 April 2004 AIR TRAFFIC MANAGEMENT GS Status Monitoring Need to monitor proper operation of Ground Station Need to unambiguously locate faulty elements for quick/efficient maintenance How do you test the RF loop? Remote site monitor ? Collocated site monitor ?

20 April 2004 AIR TRAFFIC MANAGEMENT Bite Principle Illustrated Site Monitor Tranmissionof Extended Squitter signal at pre- configured intervals AS 680 Site Monitor BITE Summary. Extended Squitter BITE Summary Own Ground Station BITE, (including RF loop) Monitoring of other Ground Station Bite Details via SNMP or within User Shell AS 680 Cross-over BITE Summary To RCMS (SNMP) Maintenance Laptop Pre-Configuration (Shell) Monitoring and Configuration (SNMP) Tests and Diagnosis Recording/Replay Technical SituationDisplay To RCMS (SNMP) RF loop tested by collocated site monitor 1090 Mhz Extended Squitter (DF18) transmitted through DME antenna probes Detailed BITE

21 April 2004 AIR TRAFFIC MANAGEMENT Introduction & Overview Australian Upper Airspace Project: an example of an early operational application of ADS-B-NRA AS 680: An example of an ADS-B Ground Station Typical issues Redundancy Coverage overlap Ground Station Status Monitoring Concluding Remarks

22 April 2004 AIR TRAFFIC MANAGEMENT Concluding Remarks ADS-B NRA is arguably one of the simplest applications of ADS-B, yet many issues and design decisions have had to be addressed more to come? Operational trials and early implementations are essential build confidence in ADS-B uncover and address issues establish and validate rules and procedures refine standards… and learn to use existing ones

THANK YOU