Report to the Interagency Task Force of W G 1 on Climate and Disasters Palais des Nations, 10 to 11 April 2003 Convener of WG 1 WMO.

Slides:



Advertisements
Similar presentations
International Research Center on El Niño Understanding El Niño, learning to live together…
Advertisements

WP Operative Plan WP 4 : Functional requirements Task Responsible: Regione Piemonte.
Axel Pawlik. LACNIC V, 19 November 2003, La Habana. 1 RIPE NCC Update.
1 UN concerted approach in support of Indian Ocean tsunami early warning system Flash Appeal process for humanitarian response Project approach, wide UN.
LIVING WITH RISK : AN INTEGRATED APPROACH TO REDUCING SOCIETAL VULNERABILITY TO DROUGHT ISDR AD HOC DISCUSSION GROUP ON DROUGHT ISDR TF April 2003.
Working Group 3: Risk, Vulnerability & Impact Assessment Presentation by Working Group 3 to the 8 th Meeting of the Inter-Agency Task Force Geneva 5-6.
8 th IATF meeting, Geneva, 5-6 November 2003 Review of Yokohama Strategy & World Conference on Disaster Reduction 8 th IATF meeting Geneva.
Briefing by the Director of the Secretariat Sálvano Briceño IATF October 2002.
DISASTER REDUCTION AND SUSTAINABLE DEVELOPMENT Preparatory process World Summit on Sustainable Development, WSSD IATF 5, April 2002.
WMO’S ROLE IN DISASTER MITIGATION
June 4, 2003 Sustainable Rangelands Roundtable. June 4, 2003 A Strategic Course for the Future Sustainable Rangelands Roundtable June 4, 2003.
International Flood Network - IFNet - Akira Sasaki Deputy Director General Water in Rivers / IFNet Secretariat.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
World Meteorological Organization Working together in weather, climate and water Report by the President of RA IV EC – LXII Doc 2.4 WMO.
Global Framework for Climate Services 1 World Meteorological Organization Working together in weather, climate and water ER 2:Enhanced Capabilities of.
World Meteorological Organization Working together in weather, climate and water Proof of concept: Demonstration of the new tools in regional settings.
El Niño Buruhani S. Nyenzi Chief, World Climate Applications and CLIPS Division, WMO The Hague, Netherlands July 2002.
WMO’s Activities in Disaster Risk Reduction
WMO Monitoring & Evaluation System (Measuring our Performance/Success)
Space Architecture for Climate Monitoring --Opening Remark: 1,2,3 Wenjian ZHANG Director Observing and Information Systems Department World Meteorological.
1 G-Wadi Meeting June 2011, Tehran-Iran A short report on the Establishment of the International Center on Qanats & Historic Hydraulic Structures.
Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
World Meteorological Organization Working together in weather, climate and water Cg-XVI / Doc. 2.4 Geneva, 16 May to 3 June 2011 Report by the President.
Commission for Climatology 2013 Coordination Meeting of Disaster Risk Reduction Focal Points of Technical Commissions and Programmes October 2013.
MAMA - Network Project WP 7. MAMA-AWARE Coordinated by UNEP/MAP (MB 11) – MED POL Unit.
Weekly Attendance by Class w/e 6 th September 2013.
The Activities of Tokyo Climate Center Fumio WATANABE Tokyo Climate Center Climate Prediction Division, JMA.
CENTRE FOR MOBILITY AND EU PROGRAMMES Preparatory phase.
United Nations Cartographic Section UNGI WORKING GROUP AND UNITED NATIONS GEOGRAPHIC DATABASE Presented to the 8 th PCGIAP Brunei Darussalam, April.
OHRI towards an Open Humanitarian Risk Index A comprehensive, widely-accepted and open evidence base with which to reach common understanding and coordinated.
Summary Report On Urban Flood Risk Management Project (UFRM ) Derek Leong Meteorologist Typhoon Committee Secretariat 1/18.
Role of Risk Identification for Development and Implementation of the ICPAC Regional Strategy L.A.OGALLO IGAD CLIMATE AND APPLICATIONS CENTRE (ICPAC)
Extreme Events and Climate Variability X. William Proenza, Director National Weather Service Southern Region Fort Worth, Texas.
Global Climate Observing System (GCOS) WOAP-IV 29 – 31 March 2010, Hamburg, Germany.
Climate information services provided by the Tokyo Climate Center 1 Akihiko Shimpo Office of International Affairs Japan Meteorological Agency
Towards a Tsunami Warning and Mitigation System in the Indian Ocean IOC of UNESCO.
IPA PROJECT BUILDING RESILIENCE TO DISASTERS IN WESTERN BALKANS AND TURKEY Project Overview May 2014 Regional partners meeting Sari Lappi WMO/FMI.
World Meteorological Organization Working together in weather, climate and water Report by the President of RA III EC – LXII Doc 2.4 WMO.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
1 Course of Action For Strengthening Transportation Communications and Coordination In the National Capital Region Presented by John M. Contestabile Maryland.
Reinventing the Climate Observation Program “In order to survive, government programs need to reinvent themselves every 5-10 years.” Unknown COSC Open.
World Meteorological Organization Working together in weather, climate and water The promise and potential of Global Climate Services
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
Omar Baddour Chief World Climate Data and Monitoring WMO, Geneva WMO Climate Watch System Common Alerting Protocol (CAP) Implementation.
Earth Observation Summit 2003 NOAA Science Advisory Board Gregory W. Withee Assistant Administrator for Satellite and Information Services March 18, 2003.
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
Vanuatu Meteorology & Geo-hazards Department Protecting Lives and Property VMGD TC Pam and El NINO Communications Timeline 1 Vanuatu Meteorology and Geo.
Climate Outlook (MAY – SEPTEMBER 2017) JOSEPH BASCONCILLO
Concept Proposal for RA-III Regional WIGOS Centre
Water resources and management working group
LONG RANGE FORECAST SW MONSOON
(Dakar, Senegal, 28 – 30 September 2016)
Proposed Climate Services for Implementation of CSIS
Forestry, protected areas, and biodiversity working group
World Meteorological Organization
Proposal for future activities in the next intersession period
Inter Agency ENSO Standard operating procedures
Inter-Commission Coordination Group On WIGOS
Overview of WMO Strategic Planning Initiative
Seasonal Predictions for South Asia
ENSO and Climate Outlook, May 2017:
Luis Veiga da Cunha Universidade Nova de Lisboa
Resilience and disaster risk reduction working group
2018 Work plan - Overview Phase 2: assisting other countries replicating best practices identified in the first phase. Draft an extended note on practical.
ENSO and Climate Outlook, Feb 2017:
ENSO and Climate Outlook, March 2017:
A new Floods Working Group F
Presentation transcript:

Report to the Interagency Task Force of W G 1 on Climate and Disasters Palais des Nations, 10 to 11 April 2003 Convener of WG 1 WMO

A.Inauguration of CIIFEN B.El Nino Developments and Outlooks C.Merging databases (Climate and Disasters) D.Future Activities Activities

Inauguration of CIIFEN 9 to 10 January 2003 Interim Director, Jose Luis Santos Plan for activities in 2003 and 2004

CIIFEN - Guayaquil 1 st meeting at CIIFEN – 31 March – 4 April 1 st meeting at CIIFEN – 31 March – 4 April Regional Climate Data Rescue and Management Seminar Regional Climate Data Rescue and Management Seminar Develop plans to complete databases and manage the data Develop plans to complete databases and manage the data 23 countries participating 23 countries participating Goal Goal Develop plans Develop plans Establish CIIFEN as a centre for regional activities Establish CIIFEN as a centre for regional activities

2 nd Meeting Climate Outlook Forum July countries – climate predictions 12 countries – climate predictions Goal Goal Establish CIIFEN as regional focus for climate prediction Establish CIIFEN as regional focus for climate prediction Downscale Global Circulation Model output Downscale Global Circulation Model output

El- Ni ñ o Developments 1. El-Ni ñ o weakening rapidly – expected to move to neutral conditions by May El-Ni ñ o Outlooks issued in January 2003 April Will continue to issue during neutral phase

Merging Databases (climate and disasters) 1. WG 1 & 3 have discussed 2. Briefing provided to WG-3 of activities 3. WG-1 is proceeding with pilot project in Chile

Pilot Project 1. Chile Met Service will provide estimate of costs 2. Secure funding necessary 3. Sort disaster database in Chile for floods only 4. Define parameters to sort climate database 5. Perform database sort and merge

Goal of pilot and what can be accomplished 1. Determine if databases in developing countries are adequate to provide useable data and results 2. Determine sort criteria for both climate and disaster databases 3. Proof of concept to implement in other countries

Proposed Future Activities for WG-1 Continue El-Ni ñ o Outlooks Continue El-Ni ñ o Outlooks Complete pilot study in Chile & implement results Complete pilot study in Chile & implement results Begin development of Climate Alert System Begin development of Climate Alert System Develop Regional map of disasters by climate extremes Develop Regional map of disasters by climate extremes

Draft workplan 2003 for the ISDR-TF WG1 on Climate and Disasters AreaActions/OutputsTimetable Continuing issuing the El Nino outlooks Routine monitoring of the ENSO and issuing routine reports ON-GOING Begin developing a system in concert with WMO on climate anomalies called the CLIMATE ALERT SYSTEM Project initiation has been completed by WMO CCl. An expert team has been established. Coordination with other agencies is now required Completed Meeting planned for late 2003 By 2004 In conjunction with WG3, continue the merging of database tasks as defined in May 2002 meeting Climate databases sorted by parameter limits in Chile. Limits need to be defined for disasters Contact Chile to begin activities. Complete 3 months after disasters limits defined. November 2003 Begin defining climate related disasters associated with climate extremes that can tie into number 2 above Action by WG-3 to define geographical and parameter based disasters. November 2003