4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC (in support of INT) and ConOps Science Operations Center (In Support of INT) and Concept of Operations (SOC.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Advertisements

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
EFW Data Products/Processing Van Allen Probe SWG San Antonio September 2104 J.R. Wygant, J. Bonnell, Aaron Breneman, S. Thaller and the EFW Team.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
We have developed a GUI-based user interface for Chandra data processing automation, data quality evaluation, and control of the system. This system, known.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
1Sep 30-Oct 1, 2009EFW I-CDR Instrument Critical Design Review EFW Flight Software Peter R. Harvey 2009 Aug 31 RBSP Radiation Belt Storm Probes RBSP Radiation.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW SOC-CDR 26 Jan EFW SOC Overview John Bonnell UC Berkeley
THEMIS PROJECT NAS UCB, June 2003 Science Operations Tim Quinn 4 June 2003.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
ISUAL Data Formats & Science Data Processing S. Geller.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Instrument PER 1/21/ EFW Instrument Calibration John W. Bonnell Space.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
March 2004 At A Glance ITPS is a flexible and complete trending and plotting solution which provides user access to an entire mission full-resolution spacecraft.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
Interactions & Automations
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
CTG Command, Telemetry, and GSE (CTG) Software Design Will Rachelson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
1 Creating Situational Awareness with Data Trending and Monitoring Zhenping Li, J.P. Douglas, and Ken. Mitchell Arctic Slope Technical Services.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
WEC meeting TED status and WEC timing.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 693 EFW Concept of Operations (ConOps) John Bonnell Space.
Born EFW SOC Science Data Center (SDC) SOC-SDC Software Design Matt Born 85RBSP-EFW SOC-CDR 26 Jan 2010.
SOC Physical Resource Allocations
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
I&T&C Organization Chart
GLAST Large Area Telescope:
ECT data sharing plan Which products do you intend to make available for use by other teams in their data analysis? When will these products be available?
ACS UC Berkeley Space Sciences Laboratory
THEMIS Electric Field Instrument
Launch and On-orbit Checkout
Chapter 1 Introduction(1.1)
Integration & Test Instrument Operations Coordination
Presentation transcript:

Sept. 2008EFW INST+SOC PDR RBSP EFW SOC (in support of INT) and ConOps Science Operations Center (In Support of INT) and Concept of Operations (SOC and ConOps) John Bonnell Will Rachelson Matt Born Space Sciences Laboratory University of California, Berkeley

Sept. 2008EFW INST+SOC PDR EFW SOC and ConOps Outline (EDIT THIS) Science Operations Center (SOC) –Requirements –Organization –Description: Data Products Data Processing Flow –Development: Schedule and Milestones Test Plan Status EFW Concept of Operations (ConOps) –Instrument Commissioning: Turn-On and Check Out Boom Deploys –Nominal Operations: Conditions for Nominal Operations State-of-Health Monitoring and Trending Commanding and Day-to-Day Operations

Sept. 2008EFW INST+SOC PDR EFW SOC Requirements The EFW SOC allows the EFW SOC and Science teams to: –Process and distribute EFW science data in a timely, accurate, and configuration-controlled fashion. –Efficiently command and control the EFW instrument, both during ground testing and on-orbit operations. Governing documents: –RBSP Mission Requirements Document (DOC-REF). –RBSP-EFW UCB Performance Assurance Matrix (GSE and SOC tabs). –RBSP EFW SOC Requirements Document (DOC-REF). –RBSP EFW SOC Software Development Plan (DOC-REF). Contributing Documents: –RBSP Science Data Management Plan (DOC-REF).

Sept. 2008EFW INST+SOC PDR EFW SOC Organization EFW PM Keith Goetz (UMN) EFW SysEng Michael Ludlam (UCB) EFW SOC Lead John Bonnell (UCB) EFW CTG Lead William Rachelson (UCB) EFW SDC Lead Matt Born (UCB) The EFW SOC will be: Developed at UCB. Hosted from UCB. UCB has played a similar role on previous missions: CRRES, Polar, FAST, THEMIS. EFW Instrument I&T occurs at UCB, and SOC development builds on the GSE required to support that effort: GSE→Test SOC→FLT SOC.

Sept. 2008EFW INST+SOC PDR EFW SOC Top-Level Data Processing Diagram RBSP MOC CTG-CTG SOC-NRT SOC-PDP SDC-MDP EFW Instrument DATA ARCHIVES: SOH L0+, L1, L2, QL, CAL, L3+ SDC-DVAL SDC-BSEL RBSP EFW SOC Command-Telemetry-Ground Support (CTG) and Science Data Center (SDC) elements. SDC-ODP SDC-MAG SDC-SDA SDC-CAL EMFISIS SOC MAG data OTHER RBSP and GEOPHYSICAL DATA Sources EFW Supporting DATA ARCHIVES: EMF-MAG STATE MOC OGPD SOC-logs SOC-CDR I-CDR

Sept. 2008EFW INST+SOC PDR EFW SOC Data Processing Organization SOC is divided into two parts: Command, Telemetry, and Ground Support (CTG). Science Data Center (SDC) CTG consists of a single CSCI, CTG. SDC consists of 9 CSCIs, 1 of which is directly relevant to INT efforts: NRT – Near-real Time data processing and display. METUTC -- MET↔UTC Time Conversion PDP – Processed Data Production. DVAL – Data Validation BSEL – Burst Data Selection MDP – MOC Data Products Processing. MAG – MOC and EMFISIS Data Products Processing. ODP – Other RBSP and Geophysical Data Products Processing. SDA – Science Data Analysis. CAL – EFW Calibration Parameter Production.

Sept. 2008EFW INST+SOC PDR EFW SOC Data Products (make sure agree with SDMP) Data LevelDescriptionTime to AvailabilityUsers L0Raw de-commutated telemetry data retrieved from MOC. APID-separated daily files generated by SOC (EFW L0+). Binary files. Typically daily retrieval and processing and/or reprocessing to pick up long-latency Burst data. Processing time < 6 hours. SOC, archives. L1L0 + Time-tagged RAW waveform and spectral in spinning spacecraft coordinate system. Software and CAL files read L1 data files and produce data in physical units. ISTP-Compliant CDFs. Daily production and/or re- processing. Processing time < 6 hours. SOC, EFW Team, archives. L2L1 + Time-tagged waveform and spectral data in calibrated physical units [V, mV/m, (V/m) 2 /Hz, etc.] in despun spacecraft coordinate system and relevant geophysical coordinate systems. ISTP-Compliant CDFs. QuickLook L2 data and Summary Plots. JPG and PDF (TBD) plot files (6 and 24-hr). Available internally daily for purposes of instrument operations and data validation. Pushed weekly or bi-weekly to MOC as validated by EFW-SOC and SCI teams. [Requirement is XXX/YYY days] SOC, EFW Team, RBSP Science Team, Other End Users (Archives, Virtual Observatories, GIs, etc.). L3L2 + VxB removal for DC E-field estimate.< 2 months. L4L3 + global E field pattern estimates< 1 year.

Sept. 2008EFW INST+SOC PDR EFW SOC CTG Block Diagram GSE

Sept. 2008EFW INST+SOC PDR EFW SOC NRT Block Diagram RBSP MOC EFW SOC CTG MOC L0 to SOC L0+ processing L0+ to L1 Processing EFW L0+ Archive EFW L1 Archive SOC and SCI team input required Autonomous Operation External Process or Resource NRT Data Analysis And Display Near-Real Time Data Acquisition, Processing, and Display (Science and SOH)

Sept. 2008EFW INST+SOC PDR EFW SOC Development Plan: Schedule and Milestones PhaseCSCIs/ModulesMilestone Date (no later than) Supports I (Core Instrument Support) GSE CTG NRT Nov 2008EFW IDPU ETU Board-Level Tests and Instrument I&T II (Core MOC Data Products) Test SOC Phase I + METUTC MDP-I (SCLK only) Oct-Nov 2009EFW IDPU FLT Board-Level Tests and Instrument I&T III (Core SDC) Flight SOC Phase II + PDP, MDP-II, ODP, SDA, CAL-I (Ground). Launch – 6 m (TBD) (Oct 2011 – 6 m) Mission Sims SDC Inter-Operability. EFW Commissioning. IV (Full SDC) Flight SOC Phase III + DVAL, BSEL, MAG, CAL-II (On-Orbit). Launch + 60 days (Dec 2011) Normal Mission Ops.

RBSP-EFW CDR EFW GSE Rachelson presentation here.

RBSP-EFW CDR EFW Science Data Center Products Under Development –SDC-NRT data analysis tool, EFW Plot Planned Products –SDC-BSEL burst selection tool –SDC-DVAL data validation and release tool –SDC-MDP L0 retrieval and archiving service –SDC-MAG ancillary magnetic data retrieval, integration, and archiving service –SDC-ODP ancillary data retrieval and archiving service –SDC-PDP L0->...->L4 conversion and archiving service –SDC-SDA scientific data service –CAL calibration data service

RBSP-EFW CDR EFW Science Data Center SDC-NRT Analysis Tool –Requirements Acquire instrument data –Scriptable operation allows tie-in to the EFW CTG for data during I&T, etc. –Network interface will allow tie-in to forthcoming SOC-MDP during flight. Process instrument data –Decompression of DeltaMod-2 –Decommutation of data packets as defined in the CTM Display instrument data –View, save, and print customizable plots of data –View statistics about data –Value-added features User interface requires little to no training Import from and export to legacy tools, including tplot Unit testing and use-case testing maintains quality Generic back-end design allows for reuse in SDC-BSEL, SDC-DVAL, and SDC- SDA products.

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center

RBSP-EFW CDR EFW Science Data Center Present state of support for I&T – Communication L0 files written to disk by GSEOS are located and read without issues. –Decommutation APIDs 0x241 – 0x259 are fully implemented APIDs 0x100 and 0x260 – 0x26a are not yet implemented. (ETA <2 weeks) –Decompression Delta Mod-2 decompression is implemented and tested. No other compression algorithms are currently used by flight software. –Output Plots are sufficiently configurable to allow inspection of data to the level required for verification of operation.

RBSP-EFW CDR EFW Science Data Center Extensible and reusable –Scripting interface Simple command line interface allows for “shortcut” or “alias” operation in the most basic uses. idl -e “efwplot” -args “plot /path/to/file.ptp” IDL command prompt interface will allow for scripting of more complicated tasks. IDL> efwplot IDL> efwplot, COMMAND = 'plot /path/to/file.ptp' IDL> efwplot, COMMAND = 'configure backgroundColor = green' – IDL> efwplot, COMMAND = 'save /path/to/snapshot.png' –Separation of form and function Descriptions of inputs exist outside the source code for easier access.

RBSP-EFW CDR EFW Science Data Center Extensible and reusable –Separation of form and function Descriptions of inputs exist outside the source code for easier access. Descriptions of inputs can be reused in other tools if the project moves in another direction Descriptions of inputs from other projects can be more easily imported to let them use

RBSP-EFW CDR EFW Science Data Center Security Processes for SDC Software Product Development –Confidentiality Unintentional disclosure of information is prevented by access control. [LDAP] Unintentional disclosure of credentials is prevented by secure channels. [HTTPS] –Integrity Source changes are restricted by access control. [LDAP] Source changes are reversible through version control. [SVN] Inadvertent failures are detectable by automated testing. [Python] Catastrophic information loss is prevented through data backup. [rsync]

Sept. 2008EFW INST+SOC PDR RBSP EFW SOC (in support of INT) and ConOps Concept of Operations (ConOps)

Sept. 2008EFW INST+SOC PDR EFW ConOps Instrument Commissioning EFW Commissioning consists of two phases: –Initial instrument turn on and check out. –Radial and axial boom deploys. –May occur at RBSP MOC (using Test SOC) or at EFW SOC (using Flight SOC). Turn-On and Checkout consists of stowed functional tests (duplicates of SC-level I&T procs and data). InstrumentActivity Duration Telemetry Requirements Constraints & Notes EFWTurn-On and Check Out 2x2 hrsNRT: ~4 kbps. Stored: ~8 kbps. Should occur after or in conjunction with EMFISIS Turn-On and Check Out b/c of shared analog data (EFW, MAG, and SCM). EFWBoom DeploysNNN Weeks (both observa tories in parallel) NRT: ~4 kbps for initial step; 1-2 kbps thereafter. Stored: <5.25 kbps (Survey TM). Boom deploys must occur in sunlight. Sensor Diagnostic Tests will drive spacecraft floating potential.

Sept. 2008EFW INST+SOC PDR EFW ConOps Instrument Commissioning: Radial Booms Deploy Initial EFW boom deploy plan already developed: RBSP_EFW_TN_003C_EFW_BoomDeploySequence.doc. Boom deploy power controlled by MOC (SC service). Boom deploy commanding through EFW SOC (test or flight). Spin rate changes during staged, pairwise boom deploy illustrated below. Spin rate vs. boom stroke and time during deploy used to monitor state of deploy and abort, if required. Baseline NNN-day parallel deploy schedule between both observatories incorporated into current Mission Timeline (DOC-REF). Fine wire unfurling

Sept. 2008EFW INST+SOC PDR EFW ConOps Instrument Commissioning: Axial Booms Deploy Axial boom deploy occurs after radial boom deploy is complete, and observatory mass properties and dynamics confirmed (typically no significant delay required). Axial booms deployed singly, in stages using motor deploy system to ≈5-m stroke (≈10-m tip-to-tip). Final deploy lengths trimmed in roughly 10-cm increments using Survey axial E-field and SC potential estimates to reduce common- mode signal (expected duration of trim phase is N weeks, and occurs in parallel with other instrument commissioning activities).

Sept. 2008EFW INST+SOC PDR EFW ConOps Validity Conditions for Nominal Operations Sensors Illuminated -- All EFW sensors illuminated (goal for aft axial sensor). Attitude Known -- Post-processed Observatory attitude (spin axis pointing and spin phase) known to accuracy better than 3 deg. Ephemerides Known -- Post-processed Observatory position and velocity known to accuracy better than (10 km, 30 m/s, 0.1 deg; 3-sigma). Booms Settled -- EFW radial booms within 0.5 deg of nominal position. DC B-Field Known – Post-Processed DC B-field known to accuracy better than 1%. EFW-MAG-SCM Relative Orientation Known – Post-processed relative orientation of EFW, MAG, and SCM sensor axes known to better than 2 degrees.

Sept. 2008EFW INST+SOC PDR EFW ConOps Instrument Health and Status Monitoring Instrument State-of-Health (SOH) monitored through near-real- time or playback engineering data via the SOC-CTG. SOH compared against red/yellow limit database. Off-Nominal conditions leads to: –Notification of EFW SOC personnel (page, ). –Issuance of scripted commands, for certain, well-known off-nominal conditions (example: CRRES DDD-false commanding and resets). Long-term trending and storage of SOH data: –New solution in GSEOS as part of CTG efforts or… –Incorporation into existing UCB MOC BTAPS database (decision: part of Phase III development, 2010 time frame).

Sept. 2008EFW INST+SOC PDR EFW ConOps Normal On-Orbit Operations (1) Commanding –Complete instrument state (sensor biasing and data collection) set by ~50 commands. –Instrument configuration changes infrequently (~1/few weeks, after initial commissioning phase). –~daily commanding to support ground selection of burst segments as needed. –~monthly Sensor Diagnostic Tests (bias sweeps) to confirm and optimize instrument biasing. Data Management –12 kbps daily average: ~ 5 kbps continuous Survey data (32 S/s E and V; auto- and cross-spectral data products). ~ 7 kbps Burst1 and Burst2 data (0.5 and 16 kS/s E, V, and SCM data).

Sept. 2008EFW INST+SOC PDR EFW ConOps Normal On-Orbit Operations (2) Burst Management –Higher-rate waveform data (E, V, and SCM) collected continuously and banked into SDRAM and FLASH in seconds to minutes long segments (many days of B1 storage; many hours of B2 storage). –Each segment tagged with “Burst Quality” computed on-board from DC or AC fields data cues (DOC-REF; Filter Bank AC E or B, cues from other instruments). –B1 playback is through ground selection based on Survey data and other data sources (geophysical indices, etc.); on-board with Burst Quality allows for autonomous selection and playback, as needed (vacations, illness, ennui, etc.). –B2 survival and playback selection on-board is based on Burst Quality; playback selection includes option for ground selection based on Survey data and other data sources (geophysical indices, etc.). –B1 and B2 support for time-tagged campaign modes available as well (e.g. BARREL support). Inter-Instrument Burst Data –EFW message includes axial sensor status (illuminated/eclipsed), sensor sweep status (static/sweeping), and current burst-valuation algorithm ID and value.

Sept. 2008EFW INST+SOC PDR EFW ConOps Command Generation EFW-SOC shall generate commands by reference to UTC, as well as MOC data products (predicted ephemerides, etc.) and other data assets (e.g.. Geomagnetic indices). EFW commands shall be validated as needed by running command load on EFW TestBed (ETU) and verifying appropriate change of state, data production, and instrument configuration. Command validation shall occur prior to transmission of command load from EFW-SOC to RBSP-MOC. Verification of current MET↔UTC SCLK Kernel shall occur prior to translation of EFW commands from UTC to MET. Command receipt will be verified after transmission using standard MOC data products.

Sept. 2008EFW INST+SOC PDR This page intentionally almost blank

Sept. 2008EFW INST+SOC PDR BACKUP SLIDES

Sept. 2008EFW INST+SOC PDR EFW SOC PDP and DVAL Block Diagram RBSP MOC MOC L0 to SOC L0+ processing L0+ to L1 Processing L1 to L2 Processing QL Data and Plot Production. EFW L0+ Archiv e EFW L1 Archiv e EFW L2 Archive (internal) EFW QL Archive (internal) L2 and QL Validation L2 and QL transfer to external access EFW L2 and QL Archive (ext. access) SOC and SCI team input required Autonomous Operation EFW EMF- MAG Archiv e External Process or Resource Processed Data Products (PDP and DVAL): Acquisition, Production, Validation, and Delivery. STATE (EPHE M/ATT) Archive CAL Archiv e CTGCTG

Sept. 2008EFW INST+SOC PDR EFW SOC BSEL Block Diagram RBSP MOC EFW SOC CTG EFW L2 Archive (internal) EFW QL Archive (internal) SOC and SCI team input required Autonomous Operation EFW Burst (B1 and B2) Ground Selection External Process or Resource EFW EMF- MAG Archiv e STATE (EPHE M/ATT) Archive OTHE R Data Source s OTHER Data Acq. EFW Comman d Archive Burst Selection ( BSEL): Generation, Validation, Delivery, and Archiving. MET↔UTC Conversion

Sept. 2008EFW INST+SOC PDR EFW SOC MDP and MAG Block Diagrams RBSP MOC MOC Data Products Retrieval (non-Data, non-SOH) EFW STAT E Archiv e SOC and SCI team input required Autonomous Operation EMFISIS SOC MAG data EMF-MAG Data Acq EFW EMF- MAG Archiv e SOH Archiv e External Process or Resource RBSP MOC QuickLook MAG data ATT/EPHEM to STATE Processing Other MOC Data Products (OMDP) Processing MOC Data Produc ts Archiv e EFW OMDP Archiv e SCLK (MET↔UTC), MOC Data Products and MAG Data Processing: Retrieval, Validation, Processing, and Archiving. SCLK Kernel Processing EFW SCLK Archiv e

Sept. 2008EFW INST+SOC PDR EFW SOC SDA and CAL Block Diagrams L1 to L2 Processing (TDAS or SDT) EFW L1 Archiv e EFW L2 Archive (internal or external) SOC and SCI team input required Autonomous Operation EFW EMF- MAG Archiv e External Process or Resource Science Data Analysis (Internal and External) CAL Parameter Estimation and Production STATE (EPHE M/ATT) Archive CAL Archiv e L2 to L3+ Processing (TDAS or SDT) External Users (ISTP CDF End Users) CAL Production EFW L1 Archiv e EFW L2 Archiv e EFW EMF- MAG Archive STATE (EPHEM /ATT) Archive CAL Archiv e EFW SOH/HS K Archive Plasma Data (eg. ECT- HOPE Vion) CAL Archiv e

Sept. 2008EFW INST+SOC PDR EFW SOC Test Plan Detailed GSE-SOC test plan under development (due Q2 or Q3, 2009; supports SDP Phase II). CSCI elements will be tested in isolation to establish basic functionality (test cases; error cases and signaling). –Example: phased introduction of DCB functions and testing using GSE. Elements are brought together into full modules and fed instrument data from known sensor excitations to verify module-level functionality and requirements fulfillment. –Example: basic instrument functional tests during I&T. End-to-end testing at each stage of integration to weed out problems early. –Example: testing of complete PDP chain as early as possible during Phase D using data from SC I&T and environmental tests.

Sept. 2008EFW INST+SOC PDR This page intentionally almost blank