PRC Meeting DESY, Hamburg, May 7 and 8, 2003 SilC: an International R&D Collaboration to develop Si-tracking technologies for the LC (except microvertex)

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Hervé Lebbolo, François Rossel, Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 TOPICS: Main parameters of the Si-Envelope Front-End Issues: Long shaping.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 SilC Collaboration R&D Advances since St Malo Si-Envelope design Mechanics Electronics Future Prospects.
Solid StateTracking R&D activities in Europe ALCPG 2004 Winter Workshop SLAC, January 7-10, 2004 World-Wide review of Linear Collider Tracking Aurore Savoy-Navarro,
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
Progress in the North American Solid State Tracking R&D program Rene Bellwied (Wayne State University) for the North American Solid State groups International.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.
Tracking Group Overview Bruce Schumm Cornell Linear Collider Workshop July
The SVT in STAR The final device…. … and all its connections … and all its connections.
The WSU LC R&D program Who are we ? What have we done ? What would we like to do ? Hardware and Software R.Bellwied, June 30, 2002 Rene Bellwied, Dave.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress on the Silicon Drift Tracker R&D program
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Third International Conference on Frontier Science Villa Mondragone – Monteporzio Catone Physics and Astrophysics in Space June 14, 2004 Mercedes Paniccia.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
SiLC (Silicon tracking for the International Linear Collider) H.J.Kim (KyungPook National U.) on behalf of the SILC R&D Collaboration.
The SILC Project (SiLC:Silicontracking for the InternationalLinearCollider) The SILC Project (SiLC: Silicon tracking for the International Linear Collider)
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Progress on the Silicon Drift Tracker R&D program Rene Bellwied (Wayne State University) for the SDT group WSU (R. Bellwied, D. Cinabro, V. Rykov, Y. Guo)
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
ECFA-DESY Extended Studies NIKHEF, Amsterdam 1st to 4th April, 2003 Tracking session 31st March 2003 SilC: an International R&D Collaboration to develop.
The Gossamer Tracker: A Novel Concept for a LC Central Tracker Bruce Schumm SCIPP & UC Santa Cruz UC Davis Experimental Particle Physics Seminar June 3,
Silicon Tracking Systems in Mokka Framework Valeri Saveliev, Obninsk State University.
SILC:Silicontracking for the InternationalLinearCollider SILC: Silicon tracking for the International Linear Collider Aurore Savoy-Navarro, LPNHE-UPMC/IN2P3-CNRS.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Status report on the Asian Solid State Tracking R&D March 31, 2003 M. Iwasaki University of Tokyo.
Tracking Group Overview Bruce Schumm SLAC Linear Collider Workshop January
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Si Tracking Software ILD Software Meeting, 27 January 2010 Ecole Polytechnique, Palaiseau, France Winfried A. Mitaroff HEPHY Vienna, Austria Si Tracking.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Progress Report since last ECFA-DESY, Prague Nov ’02 Aurore Savoy-Navarro, LPNHE-Universités de Paris 6/IN2P3-CNRS  Sensor & Electronics Test bench 
Tracking Group Summary Bruce `Lefty’ Schumm UC Santa Cruz Arlington Linear Collider Workshop January 9-11, 2003.
10-Minute Overview of North American Tracking R&D Amsterdam LC Tracking Review March 30, 2003 Bruce Schumm/UC Santa Cruz.
LC Tracking Review at Amsterdam Overview of Asian Tracking R&D Vertex Detector Silicon µ-Strip Intermediate Tracker Central Tracker - Jet Chamber.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
Latest from the SiLC R&D Aurore Savoy-Navarro, LPNHE-Paris/IN2P3-CNRS On behalf of the SiLC collaboration: U. of Michigan, UCSC-Santa Cruz, IMB-CNM/CSIC,
Charles University Prague Institute of Particle and Nuclear Physics Zdeněk Doležal, Peter Kodyš, et al.
Beam test of Silicon-Tungsten Calorimeter Prototype
Electronics of the Silicon Envelope
Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3
CLIC-ILC BDS & MDI work.
Status report on the SiLC ongoing activities
International Tracking Testbeam Needs
Presentation transcript:

PRC Meeting DESY, Hamburg, May 7 and 8, 2003 SilC: an International R&D Collaboration to develop Si-tracking technologies for the LC (except microvertex) Aurore Savoy-Navarro, LPNHE-Universités de Paris 6&7/IN2P3-CNRS, France on behalf of the SiLC Collaboration

The SiLC Collaboration Brookhaven Ann Arbor Wayne Santa Cruz Helsinki Obninsk Karlsruhe Paris Prague Wien Geneve Torino Pisa Rome Barcelona Valencia Korean Universities Seoul &Taegu Tokyo Europe USA ASIA So far: 18 Institutes gathering over 90 people from Asia, Europe & USA Most of these teams are and/or have been collaborating.

Department of Physics, The University of Michigan, Ann Arbor, USA T. Blass, S. Nyberg, K. Riles, H.Yang Centro Nacional de Microelectronica, IMB-CNM/CSIC, Barcelona, Spain F. Campabadal, C. Fleta, M. Lozano, M. Ullan Brookhaven National Laboratory, BNL Physics & Instrumentation, Brookhaven, USA W. Chen, V. Jain, F. Lanni, Z. Li, D.Lissauer, V.Radeka Departement de Physique Nucleaire et Corpusculaire, University of Geneva, Geneva, Switzerland P. Azzarello, E. Cortina-Gil, M.Pohl, X.Wu Department of Physical Sciences & Helsinki Institute of Physics, Helsinki, Finland R.Orava, K.Osterberg, R. Lauhakangas, T.Schulman Institut fur Experimentelle Kernphysik, Karlsruhe University, Karlsruhe, Germany W. de Boer, A. Furgeri, F. Hartmann, T. Mueller Obninsk State University, Dept. of Applied Mathematics, Obninsk, Russia S. Aplin (OSU & Portsmouth U.), I. Bagdasarova, V. Galkin, D. Rizhikov, V. Saveleiev, M. Zaboudko LPNHE-Universites de Paris 6&7/IN2P3-CNRS, Paris, France J.E. Augustin, M. Baubillier, M. Berggren, W. Bertoli, B. Canton, C. Chapron, W. DaSilva, D. Imbault, F. Kapusta, H, Lebbolo, F. Rossel, A. Savoy-Navarro, D. Vincent University of Pisa/INFN, Italy F. Bedeschi et al..

Charles University in Prague, Prague, Czech Republic Z. Dolezal, P. Kodys, P.Kubik, P. Reznicek University of Roma 1, La Sapienza, Roma, Italy C. Dionisi, C. Luci Santa Cruz Institute for Particle Physics and the UC in Santa Cruz, Santa Cruz, USA C. Flacco, A. Grillo, C. Nesom, H. Sadrozinski, B.A. Schumm, A. Seiden, N. Spencer I.H. Park, Department of Physics, Ewha Womans University, Seoul, Korea J.H. Kang, H.J. Kim, Y.J. Kwon, Department of Physics, Yonsei University, Seoul, Korea J.S. Kang, Department of Physics, Korea University, Seoul, Korea S.K. Kim, J. Lee, Department of Physics, Seoul National University, Seoul, Korea Y.I. Choi, B.G. Chean, Department of Physics, SungKyunKwan University, Seoul, Korea H. Park, Kyungpook National University, Taegu, Korea Department of Physics, University of Tokyo, Tokyo, Japan H. Aihara, M. Iwasaki University of Torino, Torino, Italy F. Dauda, L. Demaria, D. Gamba University of Valencia/IFIC-CSIC, Valencia, Spain J. Fuster et al

Institut for High Energy Physics, Austrian Academie of Sciences, Vienna, Austria T. Bergauer, M. Friedl, M. Krammer, M. Pernicka State University of Wayne, Wayne, USA R. Bellwied, D. Cinabro, M. Coscione, V. Rykov (*WSU and KEK)

The SiLC R&D Collaboration is driven by thePHYSICS The SiLC R&D Collaboration is driven by the PHYSICS MOTIVATIONS to buildthe outmost to build the outmost performing tracking system for the experiment at the future Linear Collider

Two detectors concepts The SD detector (all Si detector) The Si-Envelope: Si-trackers surrounding the TPC Si-FCH SET SIT + FTD B-field = 5 T JLC

Independently of the detector concepts: Period from 2003 till end 2006 will be dedicated to a collaborative worldwide effort on: GENERIC R&D

Starting from the present state-of-the-art The LEP/SLC legacy: First MarkII –SLAC LEP II µvertex  first long ladders & VA FEelectronics (extended to B-factories experiments) The currently running experiments: AMS1&2, CDF II & STAR AMS1: 1st very long ladders (up to 15 sensors), fabrication. CDF II & AMS2 : 1st ‘’large area Si-trackers’’, 5 to 6 m2 sophisticated RT Si-data processing (SVT). STAR: 1st ‘’large Si-drift tracker’’, 0.7 m2, Si-drift FE & RO electronics & mechanical structure. The LHC detectors in construction: ATLAS, CMS & ALICE CMS & ATLAS: Very large area Si-tracking systems (200 m2) ALICE = further improvements wrt STAR Impressive progresses in Si-tracking technology this past decade !! Most teams in SiLC: part of these experiments & built the Si-tracker

The R&D Program and Main objectives: from mid 2003 to end 2006 R&D on Si- Sensor technologies R&D on Electronics R&D on Mechanics Test set-ups Calibration, Monitoring and Slow Control Issues Simulation studies

1.- R&D on Si-sensor technologies Three main streams:  The long µstrips: Main appealing features: drastic diminution of FE channels thus less material and power dissipation (transparency) high position resolution, simplified mechanical design Starting from AMS & GLAST experience 1st prototyped long ladder with strips of variable length:28, 56, 112, 224 cm Tests: Geneva+Paris+Peruggia R&D objectives on wafers: 6’’  12’’, thinner, smaller pitch, double-sided & yield > 50% Collaboration with Hamamatsu, ST Microelectronics, MICRON

 Si-Drift sensor technology Appealing features: Equivalent to solid state TPC, thus 3-D tracker, with timing measurement (ns), position resolution = 10 to 15 µm  New solid-state sensor technologies SiLC will investigate new SS-techs relevant for our applicationS, in collaboration with high-tech firms & solid-state research Labs. Z !! Z !! Depending the locations and/or functions of the Si-trackers, various Si-sensor technologies might have to be considered. R&D objectives on wafers: thinning of sensors & improving timing and position resolutions Industry contacts: SINTEF, CSEM, EURISYS, CANBERRA Potential interest: MICRON, HAMAMATSU

2.- R&D on electronics  Developing VFE electronics for each Si-sensor optimisation of S/N and power dissipation => power cycling ?  Digital architecture: on-detector electronics: Sparsification, pedestal substraction Charge = pulseheight measurement clusterisation for better position resolution/point (preprocessing of the data at the earliest possible stage) Timing for noise rejection (& Z measurement ??)  “Triggering” & realtime data processing (using the capabilities of standalone Si-tracking system)  Data transmission to the outside world  Going to submicroelectronics (<0.25 µm)  Packaging and cabling (TAB etc…) Integration in the overall readout & DAQ system

VFE electronics: main present electronics issue 1.- VFE for long µstrips: Santa Cruz LPNHE-Paris simulation studies & design of a Detailed studies on test bench of VA- dedicated preampli-long shaper based FE electronics (VA_64-hadr, with power-cycling, in 0.5 µ tech, VA-1) from LEP/AMS & other FE’s June’03 Design of a new VFE in 0.35  (fall’03) 2.- VFE Si-drift: (BNL & WSU) Present bipolar PASA & CMOS SCA (STAR)  Future 0.25  (DSM) CMOS technology for all 3 stages in one single chip (PASA, SCA, 10-bit ADC), see next Effects incorporated: Landau fluctuations Carrier (hole) diffusion / space-charge repulsion Lorentz angle, electronic noise, pulse dig+rec To be answered: S/N for long ladders, Optimal sensor geometry & detector bias Evaluation of analog readout scheme Effect of large B-field, of oblique angles of incidence(also: De Boer et al.). Pulse development simulation

Si-readout scheme: very preliminary First stage in the readout chain: digisation; Preliminary ideas how to implement on-detector this function, and related issues. But still many questions ???? Si-drift: {PASA + SCA + 10-bit ADC} into a single chip as for ALICE

3.-R&D on Mechanics Mechanics are a major issue to build the appropriate Si-trackers for the future LC detector. Main challenges = need for:  An ‘’extreme’’ transparency or as less material as (im)possible  Very high precision in position, mechanical stability  large surface detector  cheap and easy to build devices THIS IMPLIES a real and multi-facets R&D on mechanics to achieve a step forward in mechanics as compared to presently running or under construction Si-trackers.

Main R&D Mechanics topics: Detailed CAD mechanical design of a complete Si-tracking system Studies related to the need for transparency Cooling studies on mechanical prototypes & CAD simulations Tests & studies on materials & approaches (mechanical structure, cooling etc …) Mechanical precision Mechanical constraints & stability Alignment Techniques to build large number of basic mechanical elements: Technology transfer to Industry Tests & Studies on mechanical prototypes (feasibility of mechanical design components, Industry transfers)

3.1- Detailed CAD design of the Si-envelope & outcomes: It allows to address all the possible Si-tracking cases: SET=large area Si-tracker Si-FCH = forward Si-tracker SIT intermediate Si-tracker =>CAD detailed design reveals pbs =>Gives inputs for geometry DB in GEANT4 based simus

3.2- Cooling studies on prototypes & comparison/CAD simulations Tuning/modeling CAD simulations with test bench measurements

4.- Test set-ups 4.- Test set-ups Three types of test set-ups: Lab test benches to characterise sensors & FE electronics, in clean rooms. Most Institutes are already equipped. Test benches for mechanical prototypes (cooling, mech. constraints …) Test-beams: A beam test is foreseen by fall 2006, with a full proto. Possibly preceeded by intermediate beam tests studies. ( under discussion) Example of test bench set up in clean room in Valencia-IFIC

5.- Calibration, Monitoring and Slow control issues Three main issues will be addressed:  The handling of distorsions in the tracking system  The alignment issues  The required very high precision in position, conflicting with the very thin mechanical support (low material budget) Expertise developed for CDF and LHC on these issues will be very useful. The University of Michigan group is studying a very high precision alignement system based on an interferometer

6.- Simulations studies (Fast and Geant-based) Work to be done or underway: Detailed pattern reconstruction GEANT-4 detailed simulation developement Comparison of various detector set-ups & technologies including TPC Background studies[ including results of beam line simulation & related detector issues (forward) ] Calorimeter-assisted tracking (for SD) Physics studies to establish performance requirements MOKKA-geometry DB detector definition using detailed CAD mechanical design ttbar event display (SGV) Geant4-based full simulation(JLC)

SiLC: schedule & milestones & management The roadmap for the 3 coming years comprises 2 main phases:  PHASE 0: mid 2003 to mid 2004 is the WARM UP of the collab. 1) Organization & extension of our collaborative work (meetings at ACFA, American & ECFA Workshops + dedicated ones) 2) First series of tests on prototyped Si-sensors & VFE electronics & progress on CAD mechanical design of various Si-trackers  PHASE A: mid 2004 to mid 2006, with main goals: 1) Developt. with Industry & characterization of new Si-sensors 2) Design, production and tests of associated F.E.& R.O.electronics 1)+2) will result in the construction of a prototype for a beam test by fall’ 06 3) R&D on Mechanics with as a focus a full detailed design including developments of tools & prototype studies of: Detector architecture, related Industrial transfers, cooling, alignment Simulation studies will follow in parallel this overall R&D program

LC  LHC synergy This R&D project is an example of LC  LHC synergy, as well as with astrophysics LHC LC Astrophysics R&D Keeping and developing the collaboration with the relevant high tech firms to further progress.

Backup slides for some more details on: The schedule & milestones The sharing of responsibilities The financing of the project

Schedule & Milestones for the Si-SENSOR R&D Proto Beam Test New sensor technos Si-Drift techno R&D Long Si µstrips R&D Milestones

Schedule/milestones for electronics R&D R&D on Long Si-µstrip F.E. R&D on Si- Drift F.E. R&D readout R&D RT data proc. Si-drift FE Readout electronics FE Electronics Long strips FE RT processing electronics

Schedule/milestones for mechanics R&D milestones

Sharing of responsibilities InstitutionsSensor RDElectronicsMechanicsSimulationsTests set-up Michigan Yes IMB-CNM Yes BNL Yes Geneva U. Yes Helsinki U. Yes IEKP Yes Obninsk U Yes LPNHE-P Yes

Sharing of responsibilities (cont’d) INFN/Pisa to be def in ed Charles U. Yes Roma I to be def in ed SCIPP/SC Yes Korean U. Yes Tokyo U. Yes Torino U. Yes IFIC-CSIC to be def in ed Wayne S.U Yes IfH-Wien Yes

Finances The US groups have been or are going to be funded by DOE and/or NSF, for their project for these 2 or 3 years (Santa Cruz proposal to the DOE Advanced Detector R&D Program, $90K, WSU NSF proposal [pending, positive review]: for a total of $450K [$ 80, 170, 200K] & hardware contribution per year for BNL: $25, 50, 90K, and University of Michigan :joint UCLC/LCRD proposal [pending] for the alignment project) The European groups are R&D funded for a few of them for this present year (ex: IN2P3). They will submit an R&D proposal to get funded for the next fiscal year, by fall ’03. The Asian groups are applying for funds to Korean and Japanese funding agencies ( R&D proposal on Intermediate Silicon-tracker is pending). This organized R&D project should help in sharing among us the expertise and needed tools, and in getting the funds for the next coming years This organized R&D project should help in sharing among us the expertise and needed tools, and in getting the funds for the next coming years.

Cost estimate (very tentative, salaries not included) ItemsIndividual costSubtotal cost Silicon-sensor R&D Long Strips Silicon-Drift New sensors Mechanical Ladder 3 x ( 3 x 1.5) K Euros 4 x 1.5 K Euros 3 x 2 K Euros 5 x 1 K Euros 13.5 K Euros 6 K Euros 5 K Euros Total cost sensors30,5 K Euros Electronics R&D VFE electronics RO electronics 4 x 7,5 K Euros About 5 K Euros 30 K Euros About 5 K Euros Total Cost Electronics35 K Euros Beam Test (prototype) Mechanics & Sensors Electronics About K Euros 15 K Euros/channel About 30 K Euros 2048 x 15 = 30 K Euros Total Cost of beam test60 K Euros Mechanics R&D Prototypes & tools Alignment About K Euros About 30 K Euros About 80 K Euros About 30 K Euros Total Cost MechanicsAbout 110 K Euros