LAYOUT OF COMMERCIAL BUILDINGS

Slides:



Advertisements
Similar presentations
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Advertisements

Construction Explanation.
Construction Method, Material Selection & Building Services
eQuest Quick Energy Simulation Tool
Facilities Management and Design Chapter 11 Building Structure, Finishes and Site.
Skyscraper Construction
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
UNIT II SITE PLANNING Syllabus: Surveys – Site analysis – Development Control – Layout regulations- Layout design concepts.
Blue Prints.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Chapter 2b Foundations Shallow & Deep Foundations.
WE 640 Welding Production Plant Location. Arc Welding Processes Lesson Objectives When you finish this lesson you will understand: The importance of building.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
Construction Technology Applying Technology Period 1.
Offices May 2nd, 2011.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Copyright © Texas Education Agency, All rights reserved. Architectural Design The Foundation Plan.
TECHNOLGICAL DESIGN Architectura l Design Process.
Forging new generations of engineers. CEA Presentations.
Construction Drawing Occupational Safety and Fundamentals
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Construction Drawings
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
UNT in partnership with TEA. Copyright © . All rights reserved.
ARC 810: Building Climatology Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 810: Building Climatology Department of.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
To reduce negative environmental impacts. To move towards more natural habitats. To reduce operating costs. To enhance building marketability. To improve.
An Introduction to Transportation Systems
HEATING AND COOLING SYSTEMS
PARKING…..
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Learning the Basics of Recreation Facilities 3 chapter.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Elegance Mall PROJECT DETAILS Area of Plot : sqft. 1.2 Acres Ground Coverage: sqft Appx. Lease Area: 1lac 26 th sq. ft. Car Parking.
Estimating and Scheduling CEE 492
Learning the Basics of Recreation Facilities
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
INTRODUCTION BUILDING SERVICES – I. WHAT IS A BUILDING?   A structure that has a roof and walls and stands permanently in one place. ROOF WALLS Different.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
CAISSON FOUNDATION.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Session 1: Identifying Construction Drawings and Drawing Components.
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
Fundamentals of Construction
Temporary Works – P8 Project Practice.
Construction Activity
AR-315 BUILDING CODES & BYE LAWS
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Pre-Contract Cost Control
Decisions and considerations of choosing or building a new home.
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
M&E SYSTEM.
Detector hall in mountain regions
Arch205 building construction Introduction
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
The Asset Management Journey for Building Assets
Leak Detection Service Primarily Leak Detection is a method to find, repair and mould the leak of a pipeline. with present technology pipe.
Arch205 Materials and building construction I
Presentation transcript:

LAYOUT OF COMMERCIAL BUILDINGS Made By – Gautam Sharma (2K5/CE/416) Deepankar Hyanki (2K5/CE/415)

What is a Layout A layout is a medium to transfer the plan, length and width of the building on the ground. Latitude and longitude details are required for plotting the exact points from the layout on the ground.

In the figure : 3-D Layout of a commercial building

Types of commercial buildings There are various types of commercial buildings. Some examples of commercial buildings are given as - Banks Office buildings Hotels Malls Hospitals Stock Exchange Super Market Warehouse

Site Selection Criteria Many parameters impact the choice of the building site - The operational requirements of the business such as a need for railroad/highway access The structure may require use of a lot of over-the-road haulers thus requiring a fairly flat area; at least in the receiving/shipping area Other requirements will be availability of power; the proximity of related suppliers and location of local labor services or employees Sub-soil conditions and feasibility reports also play a major part of importance in the selection of site.

Factors affecting layout Some factors which affect lay-out of commercial buildings are – Accessibility Parking Landscape Planning and Design Fire safety HVAC Lighting Water supply and drainage Installation of Lifts and escalators Acoustic influence

Accessibility The type of access should be in coherence with that of surroundings (example – accessibility from roads) Purpose of the structure determines the type of access – example - warehouses require accessibility of heavy vehicles such as trucks In places witnessing heavy footfall (example- malls), adequate consideration should be given to the driveways, and resting area

Parking The number of vehicles entering and leaving the building determine the type of parking – underground or regular, and their ingress/egress patterns. The type of vehicles using the parking space determine the height of underground parking Underground parking requires construction of ramps for vehicles to move from one level to another

Parking (continued) In the picture : A layout design showing an underground parking system with ingress/egress and the cut-outs on the ground surface.

Landscaping Landscaping refers to any activity that modifies the visible features of an area of land Commercial buildings utilize landscaping in the form of fountains, small parks, artificial structures, etc Adds to the aesthetic appeal of the building. In the picture: Landscaping in Delhi College of Engineering

Landscaping In the picture: Landscaping in a farm house In the picture: Landscaping in a hotel

Fire Safety Fire safety must be ensured in the building by means of – Installation of automatic fire detection and alarm systems Installation of automatic sprinkler systems Providing a fire exit in various parts of a building Ensuring good ventilation through-out the building

Fire Safety (Continued) In the figure: Automatic fire detector installed in a building In the figure: Automatic Sprinkler system in action

HVAC – Heating, Ventilation, Air Conditioning Used as “climate control” mechanism in medium to large commercial and industrial buildings. Ductwork, and space requirements for air-conditioning plant and ventilation system has to be take into account while deciding the lay-out HVAC is necessary where humidity and temperature must all be closely regulated whilst maintaining safe and healthy conditions within

HVAC – Heating, Ventilation, Air Conditioning (Continued) In the figure : HVAC system in a building

Position of Lifts and escalators Core walls of the lifts are designed to act as “shear walls”, which resist any earthquake forces. The position of lifts should be done in consultation with a structural engineer Positioning of lifts and escalators should be in coherence with the accessibility plans of the building

Plumbing Plumbing system is used to deliver and drain away water to and from the building. Certain commercial buildings, such as hospitals, may require water treatment plant, and hence adequate consideration must be given to the layout. No underground water or sewage pipelines must be intersected/ damaged during excavation

Power source and electric sub-stations Commercial buildings often employ electric generators to provide electricity backup during conditions of power failure. Generators usually stored in chambers usually known as “Energy Centre”. The energy centre should be such that the generator exhaust does not spread inside the building complex Electrical substations are also required for buildings with large electricity demand (examples – hospitals, malls, etc)

Construction Methodology The course of action in order to construct a commercial building, once the site has been chosen, is as follows – 1 Feasibility study of the project 2 Deciding the layout 3 Obtaining structural drawings

Construction Methodology (Continued) 4 Excavation of site 5 Laying of PCC, and construction of foundation 6 Erecting columns from the foundation

Construction Methodology (Continued) 7 Casting of beams and slabs 8 Erecting columns from the slab Processes 7 & 8 are repeated until roof slab is cast 9 Internal finishing and landscaping

Construction Methodology (Continued) Curing of concrete is done alongside other tasks. For ex – Curing of ground floor slab may be done as the columns between ground and first floor are being casted Planning and scheduling of various activities are done using network analysis, using various softwares like Primavera and Microsoft Project Daily, weekly and monthly progress reports are generated in order to monitor the progress of the project. Adequate adjustments can be made if the project lags behind schedule.

References We are thankful to Mr C. A. Prasad, Assistant Vice President (Planning), DLF-Laing O’Rourke, who guided us towards the completion of this presentation Various internet sites, primarily wikipedia (www.wikipedia. com)

Thank You!