Monroe Elementary Everett, Washington Project of Distinction Award- New Construction Elementary School Dykeman, Inc. 2012Exhibition of School Planning.

Slides:



Advertisements
Similar presentations
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Advertisements

Issaquah High School Issaquah, Washington High School Project of Distinction Mahlum 2012 Exhibition of School Planning and Architecture.
Vashon Island High School
Central Regional Elementary School #22 Playa Vista, CA Design Concept Osborn Architects 2008 Exhibition of School Planning and Architecture.
TARVER ELEMENTARY SCHOOL Temple, Texas Elementary School New Construction Project SHW Group 2008 Exhibition of School Planning and Architecture.
Southwest High School Albuquerque, New Mexico High School Design Concept / Projects Under Construction Award Perkins+Will 2008 Exhibition of School Planning.
Austin, Texas 2013 CEFPI Southern Region Conference.
North Grove Elementary School Sycamore, Illinois New Construction Project of Distinction FGM Architects Inc Exhibition of School Planning and Architecture.
Centennial High School
Druid Hills High School
2011 Exhibition of School Planning and Architecture
Mountainside Middle School Mead, Washington New Construction Middle/Junior High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
The University of Sacramento Design of New Campus Sacramento, California Design Concept Award Projects in the Design Phase Holabird & Root 2009 Exhibition.
Silver Crest Elementary School HERRIMAN, UTAH Project of Distinction – New Construction Elementary School VCBO Architecture 2010 Exhibition of School Planning.
East Fairhaven Elementary School Fairhaven, MA Elementary School Project of Distinction Submission HMFH Architects, Inc Exhibition of School Planning.
Clark County School District Virtual High School and Vegas PBS Las Vegas, Nevada Project of Distinction New Construction JMA Architecture Studios 2010.
College of Southern Nevada Instructional Center – City of Las Vegas Fire Station Las Vegas, Nevada Project of Distinction New Construction JMA Architecture.
Rogers High School Spokane, Washington The Lee Brockway Award for Renovations High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
Peachtree Charter Middle School Dunwoody, Georgia Project of Distinction – New Construction Middle/Junior High School Cooper Carry, Inc Exhibition.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture.
El Cerrito High School El Cerrito, CA New Construction Project of Distinction WLC Architects, Inc Exhibition of School Planning and Architecture.
Westwood Elementary School San Diego, California Elementary School Lighthouse Renovation NTD Architecture 2008 Exhibition of School Planning and Architecture.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Bainbridge High School 200 Building Bainbridge Island, Washington High School Project of Distinction/New Construction Mahlum 2009 Exhibition of School.
Osseo Adult Education Center Brooklyn Center, Minnesota Other: Adult Education Project of Distinction – New construction ATS&R Planners/Architects/Engineers.
Eastgate Elementary School Bellevue, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2010 Exhibition of School.
Lansing Community College University Center Lansing, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of School Planning.
Little Cedars Elementary School Snohomish, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2008 Exhibition of School.
Westside Elementary School
Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture.
Advanced Technology Center Blue Ridge Community College New Construction Project of Distinction Moseley Architects 2012 Exhibition of School Planning and.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Swiftwater Elementary Center Swiftwater, Pennsylvania Project of Distinction Elementary School Gilbert Architects Inc Exhibition of School Planning.
Marco Antonio Firebaugh High School Lynwood, California High School Project of Distinction - New Construction Projects LPA, Inc Exhibition of School.
West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.
Lawrence High School Lawrence, Massachusetts High School New Construction Project of Distinction Flansburgh Architects 2008 Exhibition of School Planning.
Roosevelt and Jackson Elementary Schools
Malibu High School/Middle School Modernization and Reconstruction Malibu, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and.
2009 Exhibition of School Planning and Architecture
Fabyan Elementary School
DePauw University Judson and Joyce Green Center for the Performing Arts Greencastle, Indiana New Construction Project of Distinction Institutions of Higher.
Samuel Brighouse Elementary School
2009 CEFPI Exhibition of School Planning and Architecture Mountain Green Elementary School Mountain Green, Utah Project of Distinction Elementary School.
Columbus Signature Academy New Tech Campus – Phase 1 Columbus, Indiana Lee J. Brockway Award Renovations High School CSO Architects 2009 Exhibition of.
Forest View Elementary School Everett, Washington Elementary School Project of Distinction DYKEMAN 2008 Exhibition of School Planning and Architecture.
Eastgate Elementary School Bellevue, Washington Elementary School Design Concept Awards – Projects in the Design Phase NAC|Architecture 2008 Exhibition.
Bothell High School Phase I - III Bothell, WA Project of Distinction – New Construction DYKEMAN Architects 2010 Exhibition of School Planning and Architecture.
Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s Exhibition of School Planning and Architecture.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
don r. roberts elementary school
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
CHURCH HILL MIDDLE SCHOOL New Braunfels, Texas Middle School Lighthouse Award SHW Group 2008 Exhibition of School Planning and Architecture.
The PNR Pinnacle Award submittal package must be submitted electronically using the attached template. Complete a submittal package for each project that.
Glacier High School Kalispell, Montana High School Project of Distinction (New) CTA Architects Engineers 2008 Exhibition of School Planning and Architecture.
Project Name City, State School Type Construction Type Submitting Firm [YEAR] Monarch Award Please Note: PPT style may be altered to allow for creativity.
Jackson Community College Information & Technology Center Jackson, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of.
Issaquah High School Issaquah, Washington High School Design Concept Award Mahlum Architects 2008 Exhibition of School Planning and Architecture.
River Valley School Sundre, Alberta, Canada Elementary School (K-8) New Construction / Addition Group2 Architecture Engineering Ltd Exhibition of.
2017 Exhibition of School Planning and Architecture
2008 Exhibition of School Planning and Architecture
Silver Lake Regional High School
Glacier View Junior High
Location Category of Entry Award Type
2016 Exhibition of School Planning and Architecture
2019 Exhibition of School Planning and Architecture
2012Exhibition of School Planning and Architecture
2011 Exhibition of School Planning and Architecture
Presentation transcript:

Monroe Elementary Everett, Washington Project of Distinction Award- New Construction Elementary School Dykeman, Inc. 2012Exhibition of School Planning and Architecture

Monroe Elementary

BeforeAfter

Community Resource Community Environment: Monroe Elementary School was designed to replace an existing active school community located in an established suburban Everett neighborhood. The solution required the existing school to remain occupied throughout construction. So as to minimize the projects effect on the surrounding neighborhood. The building was built on the existing property maintaining and utilizing the established landscape buffers and playfields as a part of a new site design. The building was designed using brick and precast concrete to preserve the scale and character of the surrounding neighborhood. Ample parking and vehicular circulation were provided inviting community use, ease of access, and student safety.

Community Use Community Environment: The design allows for community use and access for the cafeteria/stage, gymnasium, library and computer rooms.

Breakout Spaces Learning Environment: Monroe Elementary is organized around three learning pods on (2) levels. Each pod consists of four classrooms surrounding a breakout space. The breakout spaces are common spaces that allow students to break into smaller groups for instruction or special projects. Innovative and progressive learning programs with changing educational delivery can easily be accommodated with operable partitions in each classroom allowing for team teaching, flexible class sizes and multi-use spaces sized as classrooms.

Outdoor Classrooms Learning Environment: The exterior landscape design provides two outdoor classrooms, incorporating the site into the curriculum. Outdoor benches and waist-high table ledges can be used by students to prop their books and take notes during outdoor science studies where nature is the laboratory.

Design Concept Physical Environment : The building design is organized along two main circulation corridors anchored by the school administration offices at the southwest corner. The nexus of the two circulation axis is articulated by a 2 1/2 story entry vestibule.

Design Concept Physical Environment : The main entry axis is emphasized with a continuous ground face cmu wall and main staircase that serves to orient the students, teachers, and visitors. Exposed heavy timber clerestories are provided at the breakout spaces and entry providing daylight and material consistent with the Northwest environment. All systems mechanical, electrical, and structural are left exposed creating an opportunity as a passive and active teaching tool. Monroe Elementary School is the first school in the Northwest to be entirely lit with LED lighting.

Design Resolution Planning Process: The site presented many challenges most notably the existing fully occupied school was required to remain operational during construction of the new school on the existing suburban site. The final solution created a new L shaped brick building that reinforced the edges and scale of the surrounding neighborhood and while allowing all of the classrooms, library and offices natural light ventilation. The project was phased allowing the existing school to function throughout construction.

1 st Floor plan

2 nd Floor plan

Exhibition of School Planning and Architecture Project Data Submitting Firm :Dykeman, Inc. Project RoleArchitect Project ContactTim Twietmeyer TitleAIA, Project Manager Address1716 West Marine View Drive City, State or Province, CountryEverett, Washington, USA Phone Joint Partner Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Other Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Construction Firm:Spee West Construction Project RoleGeneral Contractor Project ContactKris Weholt TitleProject Manager Address307 Bell St. #101 City, State or Province, CountryEdmonds, Washington, USA Phone

Exhibition of School Planning and Architecture Project Details Project Name Monroe Elementary School City Everett State Washington District Name Everett School District Supt/President Dr. Gary Cohn Occupancy Date January 2012 Grades Housed K-5 Capacity(Students) 566 Site Size (acres) 9.2 acres Gross Area (sq. ft.) 68,324 s.f. Per Occupant(pupil) 120 s.f. gross/net please indicate 68,324/64,907 Design and Build? No If yes, Total Cost: Includes: If no, Site Development: $1.9 million Building Construction: $3.98 million Fixed Equipment: $280, Other: Total: $16.16 million

Supporting/Supplemental files/Images