November 7, 2013. Status * Concrete Repair Report was published in August 2013. * Included 40 recommendations for: * Revisions to standards. * New standards.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Parallel Flow Visualization/Mitigation Proposal
Galena Recovery Panel 2013 Spring Floods. Panel Members Galena Jon Korta (Local Disaster Recovery Coordinator and City Council Member) March Runner (Tribal.
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working: Follow Up Review Vale of Glamorgan Council Final Report- November 2009.
Manager Performance Evaluation
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
ASME SMR ROADMAP (STP-NU-072)
1 Current Reviews of Standards by NRC Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) November 7, 2013.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
Urban Poverty Strategy Update - LCG Urban Sector Subgroup Meeting - 16 November 2009.
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
Recommendation Letter for Inventors FITT (Fostering Interregional Exchange in ICT Technology Transfer)
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
November 7, Topics NESCC 2013 Survey – review of results Buried pipe coatings Seals for doors and penetrations to prevent flooding NESCC discussion.
Concrete Codes and Standards for Nuclear Power Plants (CTG) Chiara Ferraris, NIST Chairperson.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
JK August, ANS/Chair ANSI Washington DC March 28, /28/2013 NESCC Standards Meeting ANSI Washington, DC1.
Helping the people of Canada maintain and improve their health Aider les Canadiens et les Canadiennes à maintenir et à améliorer leur état de santé Path.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
Repair of Reinforced Concrete of Existing Nuclear Power Plants (RCTG) Chiara Ferraris, NIST Nathan Sauer, SIMCO Technologies.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting October 26, 2005.
ISO/IEC JTC 1 Special Working Group on Accessibility (SWG-A) JTC 1 SWG-A N Document Type: SWG-A Meeting Document Title: Task Group 2/Break.
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
ACSP Report – Review of Open Suggestions Nate Davis.
MyFloridaMarketPlace Roundtable January 21, :00 a.m. – 12:00 p.m. MyFloridaMarketPlace.
2015 ICPC Service & Commodity Planning Meeting Wednesday, January 28, 2015 from 9:00 a.m. to 11:00 a.m. Franklin County Dog Shelter & Adoption Center.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Nuclear Energy Standards Coordination Collaborative (NESCC) November 29, 2012.
T 2.3 Follow up to Conferences Leonardo Piccinetti, EFB FORESTA Project Meeting Brasilia, 20 September 2011.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
Post Seoul VSWG Update Seoul IRT October Plus code dialing –Reference document #145 approved by WG Pre-paid roaming –drafted white.
United Nations Statistics Division Registry of national Classifications.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) July.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
1 Presented to the Simplified Acquisition Committee on August 28, 2013 NIHCATS II electronic Government Ordering System (eGOS): An Overview.
Conversion Presentation. Overview T. Rowe Price Conversion Team Flowserve Team Flowserve Participant May 2010 June 2010July 2010August 2010September 2010October.
ACE Development and Trade Engagement Michael Denning, CBP Rick Davenport, eCP June 30, 2004.
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
S&I Standards Organization Engagement & Communication Plan DRAFT Standards Support Team 1 September 2011.
4.4 Timeline for M2M Consolidation Susan Miller ATIS Head of Delegation Meeting of Potential M2M Consolidation Partners #2 Washington, D.C. August 17-18,
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Police providing crime information and evidence Public Safety Infrastructure Fund Grants Presenter: Superintendent Peter Brigham Title: Assistant Director,
Ensuring Effective Communication Across the Enterprise Created by David R. Barnes Jr. National Director, Student Support Services.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
UIC Work Plan Analysis Discussion 15 November, 2009 Ellsworth LeDrew, IEEE, Univ. Waterloo Kathy Fontaine, NASA Lawrence Friedl, NASA.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Community Planning Training 8-1. Community Planning Training 8- Community Planning Training 8-2.
ESI/SPP Seams Agreement Implementation Update Transmission Planning Summit August 11, 2010.
Establishing Required Training for Washington State Employees.
Unit 8: Implementation, Part II Seminar Wednesday pm ET.
Planned Care RSCH Planned care referrals on plan for first three months Referral support service Generic Referrals Totally Health Integrated Respiratory.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
A Year in the Life Of a State Data Coordinator December, 2013.
Disaster Recovery Management By: Chris Rozic COSC 481.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Recruiting participants for education studies: Practical strategies and advice Elizabeth Autio, M.A. Jason Greenberg-Motamedi, Ph.D. Annual Meeting of.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
District Validation Review (DVR) Nonpublic School Preparation Information Division of Special Education.
Preparation of the Self-Study and Documentation
BSBWOR301 Organise personal work priorities and development
Proposed Bay TMDL Schedule
TN: TEACH AACTE Grant TN TEACH: The TN EPP Assistive and Collaborative Help Network.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Preparing for NCPDP Joint Technical Work Group Meetings
Central Valley Water Board Meeting of 29 March 2012
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

November 7, 2013

Status * Concrete Repair Report was published in August * Included 40 recommendations for: * Revisions to standards. * New standards. * Revisions to NRC regulatory documents. * Research that is needed.

Status * Follow-up activities: * Pulled from the report each recommendation and the appropriate organization to address (SDOs, NRC). * Identified 4 primary SDOs and points of contact for each: * ACI, ASTM, ICRI, ASME * Fran Schrotter had a preliminary conversation with each SDO. * Letters were sent to each in September, including attachments.

Key Points in Letter * The NESCC’s Concrete Repair Task Group recently published a report, entitled, “Codes and Standards for the Repair of Nuclear Power Plant Concrete Structures: Recommendations for Future Development.” The report is provided as Attachment A. * We are seeking your organization’s engagement in assessing how the recommendations can be effectively implemented and in planning a path forward. We would appreciate the opportunity to speak with you about this either in person or via conference call ….

Key Points in Letter - Continued * In preparation for that discussion, Attachment B contains items specific to your organization that have been extracted from the task group report for your convenience. Along with those items, it may be helpful to consider the following: * Significance of the issues and recommendations to your organization. * Feasibility of and potential issues with implementing the applicable recommendations by your organization. * Relationship of these recommendations to other efforts in your organization (or that you are aware of), and the relative priority you would place on the recommendations.

Status * Follow-up activities - continued: * Only ACI has responded to date: * Have strategy for addressing recommendations * Provided appropriate contacts * Agreed to a discussion * A conference call with ACI is scheduled for later this month. * Other SDOs that have not responded will be contacted again. * Process for following up is being documented so that it can be repeated for future task group reports. * Response from the NRC as an end user – provided by Rick Jervey.