Doc.: IEEE 802.0-04/XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 Keep 802 Together Proposal Date: March 15, 2003 Point of Contact:

Slides:



Advertisements
Similar presentations
Slide 1 Insert your own content. Slide 2 Insert your own content.
Advertisements

Doc.: IEEE /0204r2 Submission March 2010 David Halasz, AclaraSlide 1 Comments on Sub 1 GHz license-exempt operation Date: Authors:
Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Doc.: ec EC Submission 2 nd VC Slides for EC Workshop Discussion Topics Date: November 12 th, 2011 Author: Matthew Sherman Vice Chair, IEEE.
Doc.: IEEE /398-r0 Submission July 2001 Vic Hayes, Agere SystemsSlide 1 Closing Report of Radio Regulations to Plenary Working Group meetings.
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Doc.: IEEE /0953r0 Submission Sept 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Sept 2009 Date: Authors:
Doc.: IEEE /0953r1 Submission November 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Nov 2009 Date: Authors:
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE /2079r0 Submission July 2007 Terry Cole, AMDSlide 1 WG Technical Editors Opening Report (July) Date: Authors:
Draft 03 Feb 26, PM EST1 Potential CAG/Sponsor Conflicts: an 802 perspective The IEEE SA endorses many projects –imperative principles of the SA:
Doc.: IEEE /854R3 SubmissionSlide 1 July 2004 Sheung Li, Atheros Section 21 Procedure (formerly Procedure 10) Request for P802.11j Conditional.
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2007 Slide 1 EC LMSC Policy and Procedures Update Date: July 16 th, 2007 Author: Matthew.
Doc.: VC1_ _r2_EC_Closing_Motions.ppt Submission 1 st Vice Chair Closing Motions Date: November 20 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 LMSC Policy and Procedures Update Date: March 14 th, 2005 Author:
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs & Stuart J. Kerry, Philips Slide 1 SEC Motion For the Chair of IEEE 802 LMSC.
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs Slide 1 Issues with P&P Review Requirments Date: March 18 th, 2003 Authors:
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Doc.: IEEE Submission March 2006 Michael Lynch, Nortel RR-TAG Opening Report Report on January 06 Interim Meeting Work to.
Nov. 14, 2005 C /81Chair, IEEE Opening November 2005 Plenary Session #17 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0009r1 Submission March 2006 Steve Shellhammer, QualcommSlide 1 March 2006 Opening Report Notice: This document has been prepared.
The Policies and Procedures of the IEEE 802 LMSC 15-March-2004.
Submission doc.: IEEE 802-EC-13/0033r0 July 2013 Jon Rosdahl, CSRSlide 1 ExSec Agenda Items July 2013 Plenary Date: Authors:
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
Doc.: 18-12/0076 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0025r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 1 IEEE Wireless Coexistence TAG Steve Shellhammer
May 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE /342r0 Submission 1 Slide Publicity Committee.
Doc.: IEEE 802.RR-02/040r3 Submission March 2002 Carl Stevenson, Agere SystemsSlide 1 Request to pass a motion to request SEC to establish a Radio Regulatory.
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE /0552r1 Submission May 2014 Slide 1 IEEE WG responses to SC6 on FDIS ballots on aa/ad/ae 13 May 2014 Authors: NameCompanyPhone .
Doc.: IEEE /0022r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Discussion on Contention-based Protocol (CBP) Study Group Notice:
Doc.: IEEE /372r0 Submission July 2001 Jim Lansford, Tim Blaney, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group Tuesday.
Doc.: IEEE /353r0 Submission July 2001 Jim Lansford, Tim Blaney, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group Tuesday.
Doc.: IEEE COEX-01/010r0 Submission November 2001 Jim Lansford, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group November Plenary.
Doc.: IEEE /0564r0 Submission May 2014 Marc Emmelmann, SelfSlide 1 Results of LB 201 on TGai D2.0 Date: Authors:
Doc.: IEEE /0054r00 Submission March 2013 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March Plenary EC Meeting IEEE P
Doc.: IEEE 802.RR-02/050r1 Submission March 2002 Carl R. Stevenson, Agere SystemsSlide 1 SEC Closing meeting March 2002 Agenda item 4.6 Reply Comments.
Doc.: IEEE 802.RR-02/050 Submission March 2002 Vic Hayes, Agere SystemsSlide 1 SEC Closing meeting March 2002 Agenda item 4.6 Reply Comment to FCC.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: November 14 th, 2005 Author:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 Motions Internal for LMSC 1 st Vice Chair (And supporting slides)
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission November, 2007 Slide 1 EC Update on LMSC Policy and Procedures Date: November 12 th, 2007 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
LMSC Policies and Procedures Subcommittee Inputs
IEEE P Motions at the July Plenary EC Meeting
LMSC P&P Issues for Closing Plenary
EC LMSC Policy and Procedures Update
EC Update on TV Whitespace ECSG
LMSC Policy and Procedures Update
Matthew Sherman, BAE Systems
EC Update on LMSC Policy and Procedures
LMSC Policy and Procedures Update
EC LMSC Policy and Procedures Update
IEEE P Motions at the July Plenary EC Meeting
Motions Internal for LMSC 1st Vice Chair (And supporting slides)
Formalizing the Wireless Chair’s Meeting
IEEE P Motions at the July Plenary EC Meeting
EC Closing Report on Rules
IEEE WG Policies and Procedures Update
Month 2000 doc.: IEEE /xxx November, 2005 Open season on the P&P
Presentation transcript:

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 Keep 802 Together Proposal Date: March 15, 2003 Point of Contact: Matthew Sherman 2 nd Vice Chair, IEEE 802 BAE Systems - CINR Contributors: Bob Grow, Matthew Sherman, Bill Quakenbush, Roger Marks

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 2 Goals Define reorganization within existing 802 Address concerns expressed at Nov. 03 meeting

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 3 Approach Develop resolutions to major concerns raised Evolve strawman reorg proposal based on resolutions Present strawman to EC in March 04 Address additional concerns expressed Refine proposal Solicit inputs from CS and SA Bring to vote in July 04

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 4 New Organization Highlights Preserves 802 as market facing and oversight entity –802 Architecture preserved Greater independence to WG Changes purely through P&P –Limit content to key topics Center on Pars req, Sponsor ballot req, EC ballots, tutorials Rely on Higher P&P and WG P&P for all else –May need / want to move to SCC

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 5 Concerns and Suggested Resolutions

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 6 Concern: Logistics problems associated with size Resolution: Allow separate WG Plenary 802 hosted plenary 3 times per year if desired For WG who dont want treasury One full Plenary per year Encourage cross-polinization between groups Have every 2 years if every year too much Short electronic EC after each plenary Allows quick action by EC on issues Telecom augmented with web conferencing

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 7 Concern: Current P&P are broken Resolution: Rework around Model P&P Minimize content with ref to other docs Incorporate mods based on this doc Move to SCC format if needed

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 8 Concern: Maintaining architectural consistency across MACs wrt future organization Resolution: 802 still approves all PARs and Sponsor Ballots All other issues determined by WG

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 9 Concern: Increased friction between WGs Resolution: Reduce interactions to PARs Sponsor Ballots New activity tutorial If conflict with 802 tutorials WG allocates WG time Electronic pres in non-802 Plenary 12 votes so limited impact of any one group Hard to block unless serious problem All other issues left to WG

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 10 Concern: Continually at odds over operational style and procedures Resolution: See section on increased friction

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 11 Concern: Difficulty of coordinating technical work across a group of this size Resolution: Dont know how to do better than curret org

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 12 Concern: Need to devolve power from EC to WGs Resolution: See slide on increased friction

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 13 Concern: Operational efficiency of WGs Resolution: Up to WG to set their own pace Must comply with SA requirements, etc.

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 14 Concern: Large groups need faster response time, more dynamic environment, without losing quality Resolution: See slide on increased friction

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 15 Detailed Reorganization Proposal To be added if fundamental approach approved by 2/3s of EC Fully handled via P&P Changes Move to SCC format if needed