Performance Specifications T. E. A. M. St. Louis Presentation October 8, 2004.

Slides:



Advertisements
Similar presentations
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Advertisements

CRI- Common Review Initiative Reducing Lender Review Redundancy.
Construction Inspection Certification Program (CICP) Devin Townsend, P.E.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
PARCC Progress Update 1 June 26, In the Last Year… 2 June 2012 Minimum Technology Specifications, Version 1.0, Released Item Development Began August.
Zonta International District 9 Leadership Training Secretary.
How to Document A Business Management System
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
1 CFR CHAPTER I AND 1 CFR PART 51 REGULATORY UPDATE.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
SIGN MANAGEMENT UPDATE Tracy Nowaczyk Pavement Management and Operations Section Engineer Meeting Fall 2013.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
Supplemental Salaries. History School Board ask Personnel Policy Committee to look into supplemental pay Personnel Policy Committee formed a Supplemental.
History of New Crane & Derricks Standard July 30, 2003: C-DAC first meeting July 30, 2003: C-DAC first meeting Committee met 11 times Committee met 11.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Value Engineering at FHWA
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Old Policy – which no one ever seem to have heard of.
2006 California Bridge Construction Forum Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction.
CONSTRUCTION SEMINAR Title 28 Professional Engineers and Land Surveyors Effective October 1, 2004.
CODES, STANDARDS AND GUIDELINES
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
SD Secondary Career & Technical Education (CTE) Perkins Updates – July 2013.
1 OGT Assessment Update (C-4) Ohio Department of Education Office of Assessment September
The New Public Assistance ProgramOV-1 Objectives  Describe the purpose of the New Public Assistance Program  Identify the components of the New Public.
FHWA Update Butch Wlaschin, P.E. Director, Office of Asset Management AASHTO Highway Subcommittee on Construction 2010 Annual Meeting Burlington, Vermont.
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
AASHTO Technical Committee on Cost Estimating AASHTO Subcommittee on Design Annual Meeting July 20, 2009 Lesly Tribelhorn, Chair, TCCE.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Item 14 Re view of Budget and Outline for the FY2015 Unified Planning Work Program (UPWP) 1 Gerald Miller Acting Co-Director Department of Transportation.
HIGHLIGHTS From the PHOENIX MEETING December 2002.
UPDATING RIGHT OF WAY MANUALS FLORIDA’S PROCEDURES.
Project Kickoff Meeting May 29, Transforming the Way Government Builds Solutions.
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
SES Performance-Based Pay System Three steps to USDA implementation and change: 1. Convert all senior executives to new pay for performance system 2. Develop.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
NCDOT – “Final Surface Testing” CAPA / NCDOT Asphalt Training Workshop February 21-22, 2012 Raleigh, NC IRI Standard Specification Article
Study on the Patent Involved in National Standards China National Institute of Standardization September, 2009.
Overview of SCOH Strategic Plan AASHTO Subcommittee on Design 2010 Annual Meeting Rick Land, Vice Chair AASHTO Highway Subcommittee on Design and Chief.
Standard Design Process Overview
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
ICC Industry Advisory Committee Purpose and Scope The purpose of the Industry Advisory Committee (IAC) is to promote, in cooperation with the International.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
Andy Doyle UK Corporate Sales Manager BCS Solutions for Business.
The CED’s & DED’s role in the Tenure & Promotion of Agents
Our Goal Consistent with the Americans with Disabilities Act, insure RTD’s website content is accessible to people with disabilities using a variety of.
Moving forward to Fall 2018 visit
Acceptance Process for Manufactured Products by Certification:
Implementing the Transportation/Land Use Connection Program
Overview of the FEPAC Accreditation Process
All Wales Safeguarding Procedures Review Project
Personnel data report Susan Bobbitt-Voth, Presenter
How did we do it? Case examples from AIC
Compliance with the Freedom of Information Act 2000
Review plan of the nature reporting – update 6
SPR-B Research Coordination Webinar
Report of the Technical Subcommittee
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Presentation transcript:

Performance Specifications T. E. A. M. St. Louis Presentation October 8, 2004

What are they? Performance Specifications

Types of Specifications: (Listed in Hierarchical Order) Performance End Result Performance-Based Performance-Related Statistical QC/QA Method

The type of work will dictate the type of specification used. Examples of most can be found in the new spec book.

Eliminate method specifications wherever possible. MoDOT’s Goal:

Performance: Describes how the finished product should perform over time. Other than warranties/guarantees, performance specs had not been used in highway construction.

Method: Specification that directs the contractor to use specified material in definite proportions and specific types of equipment and methods to place the material.

How are they different? Rather than providing the detailed steps, we tell the contractor what finished product we want.

A BRIEF history of performance specifications.

As of November 2000, over half of the state DOT’s were using performance specifications in one form or another. June US Secretary of Defense directed the reform of military specifications and standards. The idea caught on, and state DOT’s began using them in limited applications. History:

Typical applications include: Pavements Striping Bridge Painting Landscaping Design/Build Projects

Missouri will be the first state to entirely revise its specifications to performance wherever possible.

Encourage innovative thinking Promote new construction techniques Minimize restrictions by state government Allow contractors to showcase their work Lower costs and higher quality Why Use Performance Specifications?

The PROCESS How did we get where we are now?

Industry Rusty Crane Tom Kraus (Millstone Bangert) Late in the Summer of 2001… A Steering Committee was formed including individuals representing: Construction and Materials Pat McDaniel Dennis Bryant Vicki Woods Design Kirsten Munck A District Phil Knott-D9 FHWA Mary Ridgeway

January 2002 – with the recommendations of the Steering Committee… A Project Coordinator was designated in Design. Each section of the spec book was assigned to a functional unit. Functional Unit Leaders assigned team leaders. Deadline for submitting the first draft was December 31, Training was provided to most participants.

Teams consisted of: MoDOT Employees FHWA Personnel 140 Industry Representatives More than 250 individuals served on 76 teams.

In addition to the current specification, teams received the following documents to revise relating to their specs: Standard Plans Job Special Provisions General Special Provisions Pay Items

All draft specifications were posted on the website for a 30-day comment period. Web Site:

After the comment period, each specification passed through a series of approvals: Chief Engineer Engineering Policy Subcommittee (Technical Experts) Engineering Policy Committee (Functional Unit Leaders) The Directors of Project Development and Project Operations

The entire revised book was posted for final 30-day comment period January 5, Release Date: June 1, 2004

Effective Date: July 1, 2004

How does all of this affect Construction and Materials More inspection, less testing. More responsibility on the contractor. More knowledgeable inspectors. Inspectors must understand intent and verify outcomes.

Inspectors need be become familiar with the new specifications, standard plans and pay items. Central Office must update the Construction manual and the Materials Manual

Questions?