Doc.: IEEE 802.11-12-0396r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.

Slides:



Advertisements
Similar presentations
Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Advertisements

May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
May SG Communications Overview Matt Gillmore 02/27/2012.
For OpenSG Discussion: Preliminary SG-Enterprise Charter Greg Robinson, Co-Chair, SG-Enterprise Wayne Longcore, Chair, SG-Enterprise.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Doc.: IEEE /1268r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– September 2011 Date: 22 September 2011 Discussion topics.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
Doc.: IEEE r1 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
1 May 2010 SG Network TF Overview & Deliverables Ron Cunningham (vice-chair) Presented to SGAC AWP 11Jul2012.
Doc.: IEEE /0955r0 Submission July 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-July-28 Abstract: Discussion.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0720r1 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Opening Report] Date Submitted: [February 1st, 2010] Source: [Don.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
Doc.: IEEE /0210r2 Submission February 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Teleconferences – Jan-Mar 2011 Date: 2 February 2011 Abstract:
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
DOCUMENT #:GSC15-PLEN-52 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.11 CONTACT(S):Maria Estefania ATIS and.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /0186r3 Submission March 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1180r0 Submission September 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Closing Report 2010 Date: 2010-September-13 Abstract: Discussion.
Submission doc.: IEEE /0156r0 January 2016 Joseph LEVY (InterDigital)Slide 1 IMT-2020 Discussion Review and Straw Polls Date: Authors:
Doc.: IEEE g TG4g - SUN November 2009 Phil Beecher, Beecher Communications Consultants Ltd Slide 1 Project: IEEE P Working Group.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
Smart Grid ad hoc – August 2011
Work Plan for IEEE m Standard & IMT-Advanced Submission
Smart Grid ad hoc Meeting Information - January 2010
Smart Grid SC– May 2012 NIST PAP2 activities of interest to 802 Name
Smart Grid ad hoc Meeting Information - January 2010
IMT-Advanced Opening Report
Wireless Characterization for NIST PAP#2
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Smart Grid ad hoc Closing Report – May 2011
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
<month year> doc.: IEEE < e> January 2012
Wireless Characterization for NIST PAP#2
IEEE IMT-Advanced Review Process
Smart Grid ad hoc Closing Report - March 2010
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
doc.: IEEE <doc#>
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Smart Grid ad hoc Closing Report – January 2011
Smart Grid Closing Report – November 2010
Smart Grid ad hoc-Closing Report - July 2010
<month year> doc.: IEEE < e> January 2012
WBA Carrier Wi-Fi Liaison request - March 2014
Presentation transcript:

doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone Bruce KraemerMarvell5488 Marvell Lane, Santa Clara, CA, Topic Abstract: Tuesday – NIST PAP2Kohala 3 Wednesday- Discussion on Smart Grid TAGKohala 4 March 2012

doc.: IEEE r0 Submission Waikoloa Agenda High level PAP02 GOALS, Work plan, Schedule, Discussion of details as appropriate Catalog of Standards Modeling Tool PAP02 Intro Cyber Security Publications and References Bruce Kraemer, MarvellSlide 2 March 2012

doc.: IEEE r0 SubmissionSlide 3Bruce Kraemer, Marvell March 2012

doc.: IEEE r0 Submission Major 802 Support Elements in SGIP Bruce Kraemer, MarvellSlide 4 NIST SGIP PAP#2 OpenSG SDOs Smart Grid Strategy Program management Document Publication Utility Requirements Technology Capabilities March 2012

doc.: IEEE r0 Submission High Level 802 Goals in the PAP02 Context Recognition of IEEE 802 wireless standards in NIST Catalog of Standards Acceptance of wireless standards as viable in Smart Grid deployments Bruce Kraemer, MarvellSlide 5 March 2012

doc.: IEEE r0 Submission Major 802 Engagement Opportunities in SGIP Participate in the PAP02 activity to develop Wireless Guideline 2.0 Prepare and Submit application paperwork for 802 standards to NIST for inclusion in the Catalog of Standards Bruce Kraemer, MarvellSlide 6 March 2012

doc.: IEEE r0 Submission PAP#2 Status Published: Version 1 –NISTIR 7761: NIST Priority Action Plan 2NISTIR 7761 Guidelines for Assessing Wireless Standards for Smart Grid Applications –Wireless Capability MatrixWireless Capability Matrix –Application Communication Requirements MatrixApplication Communication Requirements Matrix Extended Work: Update of the Guidelines with goal of completing Version 2 by August 2012 Slide 7 Bruce Kraemer, Marvell March 2012 Slide 7

doc.: IEEE r0 Submission Guideline Version 1 Bruce Kraemer, MarvellSlide 8 AttributeStandard Information Identifier of the standardNIST IR 7761 Title of the standardGuidelines for Assessing Wireless Standards for Smart Grid Applications Name of owner organizationNIST Latest versions, stages, dates1 URL(s) for the standardhttp://collaborate.nist.gov/twiki- sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_ Guidelines_for_Assessing_Wireless_Standards_for_S mart_Grid_Applications_1.0.pdf March 2012

doc.: IEEE r0 Submission Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Bruce Kraemer, MarvellSlide 9 March 2012

doc.: IEEE r0 Submission Annexes ANNEX A IEEE ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE /WIMAX NETWORK January 2012 Slide 10Bruce Kraemer, MarvellSlide 10 March 2012

doc.: IEEE r0 Submission Guideline 1 to 2 Differences Provide a significantly better method for analyzing/comparing the performance of a wireless technology in a representative physical environment with a specified data load scenario –Utilize realistic data loading (developed by OpenSG) –Correct definitions contained in Section 4 –Significantly extend the technology modeling (SDO sub com) in Section 5 Bruce Kraemer, MarvellSlide 11 March 2012

doc.: IEEE r0 Submission UCAIUG The UCA ® International Users Group is a not-for-profit corporation consisting of utility user and supplier companies that is dedicated to promoting the integration and interoperability of electric/gas/water utility systems through the use of international standards-based technology. It is a User Group for IEC 61850, the Common Information Model – Generic Interface Definition (CIM/GID as per IEC 61970/61968), advanced metering and demand response via OpenDR. Our Mission: To enable utility integration through the deployment of open standards by providing a forum in which the various stakeholders in the utility industry can work cooperatively together as members of a common organization to: Influence, select, and/or endorse open and public standards appropriate to the utility market based upon the needs of the membership. Specify, develop and/or accredit product/system- testing programs that facilitate the field interoperability of products and systems based upon these standards. Implement educational and promotional activities that increase awareness and deployment of these standards in the utility industry. Bruce Kraemer, MarvellSlide 12 March 2012

doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 13 G-NET%20PAP%20work-in-progress/Database- wip/database/SGNet-2010mod29Aug zip Latest data descriptions Actors Flows Data size Security levels Open SG Utility Data Flow information March 2012

doc.: IEEE r0 Submission SDO Sub group SDO Sub-group Purpose: Sub-group open to anyone with technical knowledge interested in contributing to clarifying SDO terms and generating estimates for covered equipment When: Occurs every Monday effective 8/8/2011 from 9:00 AM to 10:30 AM (UTC-08:00) Pacific Time (US & Canada). Conference Bridge: Conference ID: Passcode: 0681 Bruce Kraemer, MarvellSlide 14 March 2012

doc.: IEEE r0 Submission Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Bruce Kraemer, MarvellSlide 15 March 2012 Re-write focus

doc.: IEEE r0 Submission Annexes ANNEX A IEEE ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE /WIMAX NETWORK January 2012 Slide 16Bruce Kraemer, MarvellSlide 16 March 2012

doc.: IEEE r0 SubmissionSlide 17Bruce Kraemer, Marvell March 2012

doc.: IEEE r0 Submission PAP02 Guideline – January Schedule Overview Wireless Guideline 1 published – Jan 13, 2011 Finalize wireless model – Oct 7, 2011 Revise Sections 2,3,4,5,6,7,8,9,Annex - March 16, 2012 Collect all details on modeling scenarios – Nov 4, 2011 Exercise, refine, output model results – Feb 3, 2012 PAP02 vote on Guideline 2 Submit Guideline 2 to CoS process – April 16, 2012 Wireless Guideline 2 published – Aug 10, 2012 Bruce Kraemer, MarvellSlide 18 March 2012

doc.: IEEE r0 Submission PAP02 Guideline – March Schedule Overview Wireless Guideline 1 published – Jan 13, 2011 Revise Sections 2,3,4,5,6,7,8,9,Annex Model Assessment Tool ready for use– April 13, 2012 Exercise, refine, output model results – May-June, 2012 Draft ready for Group review – August 24, 2012 PAP02 vote on Guideline 2 – October 5, 2012 Submit Guideline 2 to CoS process – October 8, 2012 Wireless Guideline 2 published – February 22, 2013 Bruce Kraemer, MarvellSlide 19 March 2012

doc.: IEEE r0 Submission OpenSG Status SG Network TF is please to announce the release of SG Requirements Release 5.1 documentation set that contains the Smart Grid Application Requirements and especially the architectural non-functional telecomm communication network requirements. This version is an incremental release of the content as measured against the 5.0 release 23Aug2011 and contains: 19 payload-groupings (use cases) 204 payloads (asymmetric messages 500 payload-parent-sets 7854 requirement rows (parent and child) payload tab that contains payload: description, attributes, security LICs, security C-I-A risk levels, business rationale for the C-I-A risk values The release 5.1 documentation set of files are listed in the following pdf. This document also identifies where the SG Communications - SG Network TF Shared Documents website the various files are located along with high level description of the file contents. Alternately, use the embedded link to the SG Communications SG Network TF "Latest_Release_Deliverables" folder If you have any questions, please contact Matt Gillmore or Ron Cunningham respectfully Ron Cunningham SG Network TF vice-chair folder March 2012 Bruce Kraemer, MarvellSlide 20

doc.: IEEE r0 Submission Work in Progress: January 2012 Slide 21 Chapter 4: Chapter 5: Chapter 6: Bruce Kraemer, MarvellSlide 21 Range Estimator: March 2012

doc.: IEEE r0 Submission TELECON FEB 08 March 2012 Bruce Kraemer, MarvellSlide 22

doc.: IEEE r0 Submission UCAIUG The UCA ® International Users Group is a not-for-profit corporation consisting of utility user and supplier companies that is dedicated to promoting the integration and interoperability of electric/gas/water utility systems through the use of international standards-based technology. It is a User Group for IEC 61850, the Common Information Model – Generic Interface Definition (CIM/GID as per IEC 61970/61968), advanced metering and demand response via OpenDR. Our Mission: To enable utility integration through the deployment of open standards by providing a forum in which the various stakeholders in the utility industry can work cooperatively together as members of a common organization to: Influence, select, and/or endorse open and public standards appropriate to the utility market based upon the needs of the membership. Specify, develop and/or accredit product/system- testing programs that facilitate the field interoperability of products and systems based upon these standards. Implement educational and promotional activities that increase awareness and deployment of these standards in the utility industry. Bruce Kraemer, MarvellSlide 23 March 2012

doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 24 G-NET%20PAP%20work-in-progress/Database- wip/database/SGNet-2010mod29Aug zip Latest data descriptions Actors Flows Data size Security levels Open SG Utility Data Flow information March 2012

doc.: IEEE r0 Submission 802 Smart Grid Teleconference Plans Bruce Kraemer, MarvellSlide 25 Calls have been scheduled at 2pm ET on Wednesdays Call topics between March and May meetings ?? Call Dates to schedule?? Mar 21 Mar 28 Apr 04 Apr 11 Apr 18 Apr 25 May 02 March 2012

doc.: IEEE r0 Submission 802 Smart Grid Teleconference Plans Bruce Kraemer, MarvellSlide 26 Calls have been scheduled at 2pm ET on Wednesdays Agreed on one call between January and March meetings Feb 08 – Telecon to discuss recommended parameters from 11ah and 15.4g to use in the propagation model March 2012

doc.: IEEE r0 Submission Range Estimator Variables - Example Supplied Bruce Kraemer, MarvellSlide 27 March 2012 Frequency in MHz2000 BS Antenna Gain dBi15.0 Tx Amplifier Power per Antenna Element (watts) 10.0 Number of Base Station Tx Antennas1 Number of Base Station Rx Antennas1 Base Station Rx Noise Figure dB4.0 Terminal Type (Actor) Fixed Outdoor Mounted Terminal Fixed Indoor Self- Installed Terminal Vehicular Installed Mobile Terminal Feeder Line Device Wireless- Enabled Smart Meter Mobile Handheld Device Terminal (SS) Antennna Gain dBi Tx Amplifier Power per Antenna Element (watts) Number of Terminal/(SS) Tx Antennnas Number of Terminal/(SS) Rx Antennnas Terminal (SS) Rx Noise Figure dB DL Channel OH Factor29.3%

doc.: IEEE r0 Submission Range Estimator Variables – & update Bruce Kraemer, MarvellSlide 28 March 2012 Frequency in MHz2000 BS Antenna Gain dBi15.0 Tx Amplifier Power per Antenna Element (watts) 10.0 Number of Base Station Tx Antennas1 Number of Base Station Rx Antennas1 Base Station Rx Noise Figure dB4.0 Terminal Type (Actor) Fixed Outdoor Mounted Terminal Fixed Indoor Self- Installed Terminal Vehicular Installed Mobile Terminal Feeder Line Device Wireless- Enabled Smart Meter Mobile Handheld Device Terminal (SS) Antennna Gain dBi Tx Amplifier Power per Antenna Element (watts) Number of Terminal/(SS) Tx Antennnas Number of Terminal/(SS) Rx Antennnas Terminal (SS) Rx Noise Figure dB DL Channel OH Factor29.3% ah g Work not yet completed Complete on conf call