EFC issues for NRA’s Conclusions & recommendations Status report activities EFC workgroup.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
3rd meeting COTS team April 25, 2007, Helsinki
New Technologies for Tuberculosis Control: Programme Perspective Draft Definitions Retooling Task Force Meeting Geneva, Switzerland January 2008.
inter-regional road charging project in Belgium
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL DATA PROTECTION AND PRIVACY COMMISSIONERS.
CEDR EFC Team in Oslo Ivar Christiansen, Norway.
André Piérard, ERGEG Project Leader on Complaints Citizens’ Energy Forum, London, September 2009 Draft advice on Customer Complaint Handling, Reporting.
PROJECT Towards an Harmonised Approach for National Space Legislation in Europe Berlin, January 2004 NATIONAL SPACE LEGISLATION: THE BELGIAN.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Road charging and vehicle taxation - the EU perspective
1 IPSG WORKSHOP 1 - CHALLENGES AND TOOLS FOR THE CENTRE OF GOVERNMENT There is an observable trend towards direction of centralization of the CoG: Reasons.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
Integration of Regulatory Impact Assessment into the decision making process in the Czech Republic Aleš Pecka Department of Regulatory Reform and Public.
Overview of present activities and developments in respect to the Directive of Interoperability 4 th meeting EFC Team, Berlin, Germany 20 January 2006.
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
1 Photo PAMECA IV TEAM Design of PAMECA IV PAMECA IV started in July 2013 and is scheduled to run until October Its overall objective.
PCR Status report AESAG, September Supported by:
Classification of Holding Companies and Head Offices according to NACE Rev.2.
PG Funding and Management Strategies Overview 3rd meeting Thursday, 22 February 2007 Paris La Défense.
The 27 National Energy Efficiency Action Plans – Results of the In Depth Analysis Brussels, 5 Oct 2010 Daniel Becker.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Capacity and Service to Road Users Task O1 Vision Paul van der Kroon, Copenhagen March 2006.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
EFC issues for NRA’s Conclusions & recommendations.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Statistics Portugal « (Quality Rome, 10 July 2008) « Simplified Business Information: « Improving quality by using administrative data in Portugal.
Module 2: Creating a Plan for Network Security. Overview Introduction to Security Policies Designing Security by Using a Framework Creating a Security.
Environmental Management System Definitions
OVERVIEW OF NAS PROBLEMS AND THE WAY FORWARD Dr. Katalin TÁNCZOS BUTE.
111 Synthesis of Questionnaires. Thematic concentration  Most of the new member states support the suggested principle while maintaining the element.
IRG/ERG Gabrielle Gauthey Member of the Board of ART.
Capacity and Service to Road Users Task 05: To optimise the capacity of the road network Mike Wilson, Bristol 27 January 2006.
Workshop on Implementing Audit Quality Practices Working Group on Audit Manuals and Methods March 2006 Vilnius (Lithuania) Hungarian Experiences.
Expert Group 4 (EG4) on Certification of the Equipment related to the Directive 2004/52/CE Francisco R. Soriano LISITT- Univ. of Valencia.
EU VAT Recent developments - Update - Maryse VOLVERT European Commission.
Introducing Regulatory Impact Analysis into Turkish Legal Framework Improving the Transparency, Consultation and Communication Aspects of RIA’s March.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
ESPON 2013 Programme Info Day on Calls and Partner Café Call for Proposals on Targeted Analysis A Decade of Territorial Evidence.
CEDR – Task O6 To harmonise electronic fee collection (EFC) Report to O1 – Jacob Trondsen, NPRA.
The Power of Recommendations Dainius Jakimavičius National Audit Office of Lithuania Vilnius, April 23, 2013.
Vienna, June 2005Heinz König EuroBoundaries The project of EuroGeographics for up-dating the European Boundaries Network
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
INSPIRE and statutory reporting under the environmental acquis Hugo de Groof January 2015, JRC-Ispra.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
1 M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 16 – Taxation Bilateral screening:
1 Vereniging van Compliance Officers The Compliance Function in Banks Amsterdam, 10 June 2004 Marc Pickeur CBFA CBFA.
Session 3 General RIA Training 6–8 July 2009 EuropeAid/125317/D/SER/TR
Office 365 Security Assessment Workshop
SIGNIFICANT CHANGES TO THE RULES
Equality and Human Rights Exchange Network
IAEA C2G Working Group 1 (Import / Export Controls, Repatriation, and National inventories / Registries) Outcome / Recommendation Summary Paul Gray & Dariusz.
Supported by: PCR Status report AESAG, September
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Outcome TFCS-11// February Washington DC
Supported by: PCR Status report AESAG, September
Draft OECD Best Practices for Performance Budgeting
Feedback from ACEA truck manufacturers and next steps
Module 5 The Climate Expert and your role as a consultant
X-DIS/XBRL Phase 2 Kick-Off
Albania 2021 Population and Housing Census - Plans
© Fresh Thoughts Consulting
Presentation transcript:

EFC issues for NRA’s Conclusions & recommendations Status report activities EFC workgroup

Tasks and activities EFC team 2005/2006  Finalise internal and cooperative work plan  Exchange best practices, lessons learned, set up knowledge base  Prepare inventory of concrete and practical issues, use results in briefing note in EFC issues for NRA’s  Include results in Strategic Position paper to be used in the discussions with EU-COM  EFC team: –members from Austria, Belgium (Walloon), France, Germany, the Netherlands, Norway, Poland, Portugal, Sweden, Switzerland. –Workshops in Basel (January 20 ). Oslo (April 21), Vienna (Sept. 8-9), Berlin (January 19-20, 2006)

Status and results briefing note  Inventory of issues  Team members made inventory of best- practices and lessons learned  First step towards knowledge base with best- practices and lessons learned made, all documents are placed in CEDR workspace  Implementation model used to cluster issues  Draft version of conclusions and recommendations, to be completed in coming weeks  Final version ready mid-March

General remarks  Role and positioning of Road Administrations: –Advisor to Minister –Principal  Interoperability –Policy wants it –Costs<>Toll Operator –EETS on which local operators have to deal wiht –Users have to pay –Jun2006 Regulatory Committee has serious decision to make….  Take local issues more on board; see Efc as a growing factor

EFC Implementation model

Policymaking (1)  Before the introduction of an EFC system the following aspects must have been addressed: –Determination of objectives – is it for funding of infrastructure and/or traffic management or fiscal taxation, which target group, where to apply –Political will, public acceptance –Adaptation of legislative framework –Political and administrative roles and responsibilities –Realistic time schedule

Policymaking (2)  Continuous attention should be given to political will and public acceptance and the chosen policy must remain consistent  Each NRA can use his position to define practical, successful EFC concepts  Political objectives and decisions tend to simplify the task of implementing such a scheme, this may yield great risks for the actual timely implementation.  To secure it’s success, the NRA should have formal responsibility or be the principal of the EFC implementation

Design and specification (1)  Political and administrative roles and responsibilities must be clarified explicitly in this phase. Structure and organisation of the EFC system need to be defined in conjunction with the roles and responsibilities  Organisation and technology concepts must be examined and redefined based on detailed implementation analysis. It will determine the success of the implementation in terms of costs, returns, user acceptance and enforcement.  Enforcement should be treated as an important issue and the NRA should take their responsibility for defining the enforcement regime. The EFC organisation should be made responsible for the operation of the enforcement system.

Design and specification (2)  EFC systems collects and distributes large sums of money as electronic values. Security is a core element in the specification. It must be based on threat analysis that address all sides of security issues. Use simple, robust cost effective EFC solutions to keep operational costs low.  Reliable and cost effective solutions have a large impact on the operational costs. Technology need be applied, but cannot solve all problems.  The EU directive on interoperability of EFC must be taken into account during the specification and design

Technology  When using existing, cost effective, technology it is of greatest importance to take into consideration the specific conditions for that specific location - no scheme or location is exactly the same.  Technology should be flexible for future developments.  Systems developed for use with trucks and busses are not automatically suited for use with passenger cars  Business case for interoperability is difficult, but may return benefits on the long term. Customers expect it to be there.

Implementation(1)  EFC projects are complex and require specific experience that can only be acquired in practice  Use pilots for test purposes, to avoid unexpected delays and considerable political risks in large scale implementation  Procurement can only start as all roles, responsibilities, new laws, implementation roadmap, fallback scenarios etc.. are in place  Include a strategy for delays. Time consuming legal problems may arise during the procurement process.  Specifications should be mainly functional, relying on open standards, thus creating an open and fair competition for potential suppliers.

Implementation (2)  The principal must continue his involvement in the procurement and implementation phase. Must be decisive in all Go/No-Go milestones  NRA must safeguard professional principles and the flexibility of the concept need to be safeguarded.  EFC implementations are never turn-key projects  Complex In-Car systems can only be installed by trained technicians. The capacity of certified installation centres may form an unexpected bottleneck in the start up phase.  For situations including large fleets of passenger cars this will be a real constraint. A quite different logistic process is needed here.

Recommendations(1)  NRA’s are recommended to: –define their roles and responsibilities explicitly. –have a leading role or at least influence the framework for the EFC implementation –safeguard the consistency of the chosen policy –to be pro-active and consider all options in relation to his specific infrastructure conditions and associated costs and benefits. –put emphasis on a practical and straightforward approach –create consensus on interoperability and cross- border issues like enforcement

Recommendations (2)  NRA’s are recommended to: –address recovery rate and enforcement in relation to each other since they can have a large influence on the success of the EFC implementation and operation in terms of costs and public acceptance. –to monitor the procurement process to secure compliance with legal regulations to avoid time consuming appeals against the results of the procedure. –exchange best practice experiences with the other NRA’s –safeguard public acceptance in all phases

EFC: next activities  Finalise note”EFC issues for NRA’s  Definition of additional recommendations regarding issues for NRA’s as a result of the Directive on Interoperability and the activities carried out in relation to that Directive.  Preparation of a Position Paper with recommendations for CEDR with regard to their contacts with EU-COM in respect to the Directive on Interoperability  Next O6 activity: Drafting of a questionnaire covering several aspects: policies, organisational structure, and future activities relevant to the harmonisation of EFC and road charging. This will be discussed in the meeting in June.