2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti NDIA PMSC.

Slides:



Advertisements
Similar presentations
NDIA PMCS May 2005 Falls Church, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
Advertisements

Presented to: NDIA PMSC By: Keith Kratzert Date: January 29, 2009 Federal Aviation Administration Improving Program Performance at FAA.
1 ANSI/EIA A STANDARD Earned Value Management Systems Proposed Changes Discussion January 31, 2007 NDIA Program Management Systems Committee.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 NDIA Earned Value Management Application Guide Status Report May 3, 2005.
1 NDIA PMSC Services Sub-Committee - Discussion Topics Charter Recap of key points from the April meeting and our current committee status Leadership challenge.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group 04 February 2010.
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. 1 Program Management.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Joint Working Group for DoD Systems Engineering Standardization
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Dave Roberts NDIA PMSC.
MAC Committee Update Robert Kondziolka, MAC Chair.
NDIA PMSC Scheduling Working Group. Exploratory working group Objective Objective Brainstorm and explore concerns and issues in scheduling bring them.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
IEEE COMMITTEE TO RESOLVE MEMBERS' CONCERNS FINAL REPORT IEEE Central Texas Section Spring Section Meeting January 25, 2014 San Marcos, TX.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group 29 January 2009.
2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti Dave Roberts.
Internal Information Services Risk Management Team Gay Infanti Northrop Grumman 3 May 2006.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting January 31, 2007 Updated Feb 4, 2007 Prepared by; Joe Houser KM.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
1 Program Management Systems Committee August 2010 Progress Report Program Management Outreach Working Group Jane Spriggs, Co-Lead Bill Altman, Co-Lead.
Internal Information Services Risk Management Team Gay Infanti Northrop Grumman 8 February 2005.
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Surveillance Guide Overview May
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
NDIA Program Management Systems Committee APM Reciprocity Agreement GEIA Engineering Bulletin Progress Report August 21, 2004 Walt Berkey, Lockheed Martin.
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
NDIA SE Division – 2014 Plan - Summary February 12, NDIA Systems Engineering Division 2014 Plan Summary - Annual Planning Meeting December 11-12,
Office of Management and Budget NDIA Program Management Systems Committee May 3, 2005 EVMS Compliance Requirements David Muzio.
1 NDIA PMSC Services Sub-Committee - Overview [initial draft] General Purpose: –To provide focused effort to represent PMSC interests in the application.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
APPLICATION GUIDE January 27, 2006 Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed Martin Telephone ;
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Internal Information Services Risk Management Working Group Gay Infanti Northrop Grumman 15 August 2006.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group Industry Issues and Position Summary 13 August 2008.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group 27 August 2009.
Internal Information Services Risk Management Team Gay Infanti/John Driessnack Northrop Grumman 3 May 2005.
NDIA PMCS May Rosslyn, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
DPG : presentation of a draft Joint Program Document DPG, 5 September 2006.
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
System Acceptance Working Group NDIA Program Management System Committee (PMSC) Meeting February 8 &
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting August 7, 2007 Prepared by; NDIA IBR Working Group August 2007.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting April 24, 2007 Prepared by; NDIA IBR Working Group April 15, 2007.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
Production EVM Working Group Outbrief August 2010 PMSC.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
NDIA Integrated Program Management Division EVM Practitioners Forum
Implementation Strategy July 2002
All Wales Safeguarding Procedures Review Project
Agenda 24 July – 1000 Around the room All 1000 – 1015 Review April meeting action items Jim/Gary 1015 – 1030 DMC 2018 Jim 1030 – 1045 OSD BoK.
NDIA Earned Value Management Application Guide
Reliability Standards Development Plan
NDIA PMSC Guides Working Group
1915(c) WAIVER REDESIGN 2019 Brain Injury Summit
NDIA Intent Guide Update for EVMIG.
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Program Management Systems Committee (PMSC)
Earned Value Management System Acceptance Working Group
Presentation transcript:

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti NDIA PMSC Guides Update Working Group 26 August 2010

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Guide Update Process/Timeline Survey conducted in Spring 2009 indicated PMSC Guides require update; in future, guides will be reviewed/maintained on a regular cycle PMSC decision to tackle IBR guide first PMSC Guides Update Team established; government and additional industry participation added in November First draft revised IBR Guide released for public comment in early October; feedback adjudication began in early November; joint team reached agreement on main body of guide Significant update to Pre-Award IBR section in December Second draft release in January. Comments addressed and incorporate; revised draft distributed on 4/14/10 Formal PMSC membership voted to approve IBR Guide as working draft, for 2-month use/comment period prior to final publication IBR Guide, Revision 1, dated 9/1/2010, approved for publication on 25 August 2010

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Guide Update Process/Timeline (continued) Surveillance Guide team formed and update begun in April Draft Surveillance Guide, Revision 1 (7/28/10) distributed to PMSC members review/comment on 3 August 2010 Final revision targeted for completion by 1 October Vote to approve for publication tentatively scheduled for November 10th Acceptance Guide update started; completion date is TBD Application Guide update started; lead is TBD Intent Guide updated last Spring to incorporate corrections and align with EIA 748-B – Currently awaiting feedback from DCMA’s EVMC – Collecting recommendations from other sources, e.g., the Scheduling WG – Will likely recommend an out-of-cycle revision to the Intent Guide for PMSC Board and PMSC membership concurrence 3

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Guides Update Project Organization 4

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. 5 IBR Guide Update Team Matt Pflieger - Battelle Marty Doucette – Pilgrim Companions Bill Mendelsohn - ITT Scott Gring - Lockheed Mitzi Shepard - Lockheed Ruth Taylor – Lockheed Dave Roberts – Navigant ( IBR Guide Lead) Todd Schulzetenberg - Raytheon Ed Silva - Raytheon Dale Gillam – SAIC Jim Brasell – Unisys Pam Brooker – Battelle Pete Wynne – Lockheed Gay Infanti – NGC (Guides Update Lead) Evelyn Neely – Raytheon Frank Malsbury – Raytheon Richard Childress – Unisys Fred Meyer – Air Force Bob Loop - Air Force Keith Samuels – Army Mia Lasat – Army Jesse Stewart – DAU Robert Pratt – DAU Roberta Tomasini - DAU Dennis Chapman – DCMA EVMC Brian Kong – DOE Matt Gonzales – JPL Ken Poole – NASA Beau Willis – Navy Anita Cukr – Navy Ted Rogers – NAVAIR Annette Junek - NAVAIR David Driver – Navy Aaron Risdal – Navy Lt Col David Arrieta – OSD Industry Participants Government Participants

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. IBR Guide Status Working draft of IBR Guide unanimously approved in May for publication on NDIA PMSC website as a working draft for use and comment Formal comments were requested during a two-month period ending 15 July formal comments and recommendations were received from PMSC member companies and government agencies – All were adjudicated, documented along with the rationale for acceptance or rejection (23 accepted in whole or in-part;10 rejected), and ratified by the PMSC Board – A documented Summary and Disposition of Comments was distributed with the final revision of the document to the PMSC membership and individually included in formal responses sent by PMSC to the companies and agencies to acknowledge and thank them for their comments Yesterday, the final revision was approved for publication on the NDIA PMSC website effective 9/1/10 6

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Summary of IBR Guide Changes Established new standardized format/style for this guide; plan to use on all PMSC guides Improved applicability and use for non-DOD agencies and for in- house IBRs Improved consistency of the IBR process across all stakeholders Added content to address both types of IBRs, pre- and post-award Increased content and focus on risk/opportunity assessment and management Included CAM/PM/IPT risk discussion objectives for each of the following risk areas: technical, cost, schedule, resources & management 7

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Summary of IBR Guide Changes Added recommended content for IBR Preparation – Objectives, entrance/exit criteria – Training – Data requests Included typical IBR execution agenda Clarified that IBR is not an EVMS review – EVMS should be reviewed in connection with management system risk only – EVMS risk should be assessed by checking its status via coordination with applicable CFA responsible for EVMS surveillance Additional material/guidance added regarding pre-award IBR – Acquisition planning guidance to identify when pre-award IBRs should be considered – Mechanisms for applying and funding pre-award IBR requirements – Key process differences associated with timing of pre-award IBRs, e.g., availability and maturity of data available prior to contract award 8

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Surveillance Guide Update Team 9 Dave Roberts – Navigant Consulting (Team Lead) Laura Ayres, Price Waterhouse Coopers Pam Brooker – Battelle Bill Mendelsohn - ITT Scott Gring – Lockheed Martin Lucy Haines – Lockheed Martin Mitzi Shepard – Lockheed Martin Pete Wynne – Lockheed Martin Marty Doucette – Pilgrim Companions Mike O’Neill- Raytheon Andrew Dorsey – Orbital Sciences Amy Martz – Raytheon Chris Nicholson, Northrop Grumman Gay Infanti, Northrop Grumman (Guides Update lead) Industry Participants Brian Kong – DOE Jim Fountain – DOE Tom Bruder - DOE Aaron Risdal – Navy Government Participants

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Surveillance Guide Status Draft revision distributed to PMSC members for review and comment on August 3 rd Comments requested by 1 September 2010 Submit comments to: – Dave Roberts at – Gay Infanti at All comments are welcome but preferred approaches, which facilitate consolidation and review by the team, are: – Mark-ups of the draft document using M/S Word‘s Track Changes menu command, or – Inserted comments using M/S Word’s Insert Comments menu command Alternatively, you may submit comments via referencing the sections and paragraphs to which they refer 10

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Summary of Surveillance Guide Changes Objective - Update Surveillance guide based on: –Changes in EIA 748-B –Latest government guidance/policy –Survey results –Lessons learned and best practices Increased focus on perceived gaps in earlier version: –Applicability of the PMSC Surveillance Guide (vs. the SSOM) –Risk and opportunity management –Schedules –Subcontractor surveillance –Data anomaly prevention –Accuracy/integrity of management report –Collection, tracking and use of surveillance results for subsequent year surveillance planning and system-level process improvements Replaced most of Section 6.3, deemed too detailed and overly-prescriptive with more generic guidance on collection/use of data and metrics Reformatted and modified terminology/definitions consistent with IBR Guide 11

National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Next Steps Surveillance Guide – Receive, disposition, and incorporate comments received by 9/1/2010 – Publish final revision by 1 October; distribute to PMSC membership for review – Hold formal vote to approve for publication (tentatively scheduled for November) Acceptance Guide –Buddy Everage leading this team –Tentatively planning a reciprocity workshop for the fall IPM Conference –Currently accepting members; if interested, please notify Buddy or Application Guide –Starting point will be the version of the Acceptance Guide containing the RM/EVM Integration Guidance recommended by the original PMSC Risk Management WG –Currently seeking team lead and members –Targeting year-end for completion of first draft for review/comment Intent Guide –further revision prior to May 2012 is still TBD 12