April 28, 2015 City Council Workshop. City Council Goal 1 Expansion  Objective: To enhance infrastructure in order to maintain quality neighborhoods.

Slides:



Advertisements
Similar presentations
Pasadena Water and Power Contract with R C Foster Corporation to Provide Seismic Upgrades to Sheldon Reservoirs 1 and 2 City Council March 12, 2012.
Advertisements

RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Workflow analysis, design & development of remedy applications.
Department of Public Works Public Hearing – FY 2015 – 2019 Recommended Capital Improvement Program Budget April 28, 2014.
CARROLL 2030 TASK FORCE APRIL 19, 2013 Infrastructure & Transportation Cluster.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
2014 Budget Department Presentations Infrastructure Funding Options.
AANDC Presentation at the OFNTSC Southern Tribal Council Meeting Chippewas of Rama, Ontario October , 2012.
 Prepared for  City of Palm Coast, Florida  June 24, 2014 Drummond Property Acquisition in Connection With The Land Donation of 70 Laramie Drive From.
2015 Annual Strategic Action Plan Evaluation. Background & Overview January 2015: Citizen Survey Results March 2015: 2014 Annual Progress Report Delivered.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
1 World Water Congress and Exhibition - Montréal, Canada WATER AND POWER UTILITY PUBLIC SECTOR FINANCING Presented by: James B. McDaniel, Senior Assistant.
2015 Annual Strategic Action Plan Evaluation. Background & Overview January 2015: Citizen Survey Results March 2015: 2014 Annual Progress Report Delivered.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
City of Palm Coast Roberts Road District & Parkway East District City Council Workshop June 14, 2011 Prosperity 2021 “Plan for Growing our Local Economy”
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Palm Coast City Council STRATEGIC ACTION PLAN 2012.
July June 2014 Presented by Leah Howard & Ryan White Upper Dublin School District Educational Technology Plan.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
Ontario Region First Nation Water & Wastewater Action Plan Presentation on March 9, 2010 Niagara Falls, Ontario INAC Ontario Region.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
The Path to a Sustainable Foundation for Facilities Management in Education Council of Great City Schools Presented by: Doug Christensen, Lander Medlin,
Roadway Median Tree Program Public Works Department July 13, 2015.
Problem Management Scenario # 2 September 17,2005.
Missoula County Commissioners and City Council formed the Missoula Valley Water Quality District (MVWQD) Missoula County Commissioners.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
Seattle Planning Commission November 13, 2014 Seattle’s Comprehensive Plan: What it is and why we have it How it’s working What’s new and what are we asking.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
DEPARTMENT OF UTILITIES RATE DEVELOPMENT PLANNING UPDATE Utility Rate Advisory Commission – July 23, 2014.
Capital Improvements Program (CIP) Council Workshop January 29, 2008 Council Chambers 6:00 p.m.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
CITY COUNCIL WORKSHOP – APRIL 12, Strategic Action Plan Evaluation Results.
City Council – Project Update September 14, 2015.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, June 7 th 2016.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Kent County, Maryland Proposed Budget FY2017 Public Hearing June 7, 2016.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
1 Budget Presentation Fiscal Year 2011 May 10, 2010.
Budget City of Palm Coast, Florida City Council Work Session August 12, 2008.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Infrastructure Discussion 1 Mark A. Harral and Raul Rodriquez April 19 th, 2016.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Town Hall Meeting May 6, 2017 Bond Election
Town Hall Meeting May 6, 2017 Bond Election
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
Sewer User Rate Increase PUBLIC HEARING
107th & 110th Avenue North Public Utilities Renewal Projects
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Village of Ruidoso Water and Wastewater Systems
Gull lake sewer + water authority
CP-TXT Amendment to the Capital Improvements Element & Public School Facilities Element (Annual Update) October 2008.
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Phoenix Public Works Support Services
WATER DEPARTMENT BUDGET WORKSHOP
2018 Water/Wastewater Rate Study and Financial Forecast
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Presentation transcript:

April 28, 2015 City Council Workshop

City Council Goal 1 Expansion  Objective: To enhance infrastructure in order to maintain quality neighborhoods and business district  Strategy: Projects targeted as highest priority for replacement shall be evaluated for potential upgrade or enhancement  Measurement: Provide City Council with a presentation of the existing PEP tank replacement program

City PEP System  PEP system designed by ITT in the early 1970’s as an alternative to the installation of a conventional gravity sewer system in certain areas of the City  12,825 active PEP tanks and the count is growing every week

PEP Tank Failures

Why do PEP Systems Fail?

PEP Tank Failures vs. Rainfall

New PEP Tank Installations = 7,197 Multiple Sub-Contractor Installations

0.50% 0.79% 0.58% 0.67% 0.36% Annualized Failure Rate182 Tanks Replaced from FY2013 – Q2 FY2015

Potential Causes of PEP Tank Failures  Record Setting Growth in Palm Coast from 2003 through 2006  Underground Utility Sub-Contractor PEP Tank Installations  Work Site Conditions and Environment  Insufficient Staff for Workload and Inspections of PEP Tank Installations

Solution and Future Plan of Action  Upgrade to Continuous H20 Load Rated PEP Tanks  Continue to Perform Installations and Replacements with City Staff, if Possible  Monitor Growth and Replacements to Ensure Adequate Staffing Level for both Installation and Inspections  Ensure Appropriate Budget to Maintain Program

Water and Wastewater Utility Capital Improvement Plan PEP Tank Installations *Based on 2014 Wastewater Management System Facilities Plan for Growth Inside City Limits with 20% Requiring PEP Tank Installation **Based on Replacement Trends over Last 8 Years Year New Tanks* Replacement Tanks** Current CIPForecasted $600,000$629, $850,000$641, $900,000$665, $950,000$815, $1,050,000$1,095,000 Total $4,350,000$3,845,000

Questions