Prabha Kundur Powertech Labs Inc. Surrey, B.C. Canada Prabha Kundur

Slides:



Advertisements
Similar presentations
FIGURE 7.1 Elements of the final control operation.
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Automation and Motion IEC Control Marketing, , 1 Safety Integrated® Topics for today.
NERC Policies Introduction
Cost Management ACCOUNTING AND CONTROL
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Balanced Device Characterization. Page 2 Outline Characteristics of Differential Topologies Measurement Alternatives Unbalanced and Balanced Performance.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
FIGURE 2.1 The purpose of linearization is to provide an output that varies linearly with some variable even if the sensor output does not. Curtis.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
New Formulations of the Optimal Power Flow Problem
1. 2 Earthquake effects on health care facilities 2.
PP Test Review Sections 6-1 to 6-6
1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
Capacity Planning For Products and Services
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Using Synchrophasors for Preventing Cascading Outages
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Chapter 4 Computer Use in an International Marketplace
MANAGEMENT RICHARD L. DAFT.
Software Analysis Tools
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
1 Phase III: Planning Action Developing Improvement Plans.
Flat Flow by Kamila Součková 11. Task Fill a thin gap between two large transparent horizontal parallel plates with a liquid and make a little hole in.
Organization Theory and Health Services Management
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
1 McGill University Department of Civil Engineering and Applied Mechanics Montreal, Quebec, Canada.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
FIGURE 3-1 Basic parts of a computer. Dale R. Patrick Electricity and Electronics: A Survey, 5e Copyright ©2002 by Pearson Education, Inc. Upper Saddle.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
August 14, 2003 Blackout Final Report
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
1 Blackout 2003 See:
August 14 th NE Blackout and Common Roots of Blackouts Damir Novosel, PhD President KEMA Inc., T&D Consulting BLACKOUT AMERICANO E ITALIANO:
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
THE ELECTRIC SUB STATION
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
Review of BPA Voltage Control Conference
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Smart Grid Schneider Electric Javier Orellana
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
1 MOSC Presentation Grid Collapse 2003 September 22/2004 Information is preliminary subject to ongoing investigations Certain material is from NERC and.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
V Winnipeg 2015 / Aug. 31 – Sept. 02 CIGRE Canada 2015 Conference No. 680 W.K.HVDC Engineering INNOVATIVE TECHNOLOGIES FOR STABLE ACDC TRANSMISSION SYSTEMS.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
ISO New England System R&D Needs
Transmission Planning in a Modern Market Environment
Reliability Assessment Committee Reliability Workshop Priorities
Impacts and Actions Resulting from the August 14, 2003 Blackout
Reliability Assessment Committee Reliability Workshop Priorities
Presentation transcript:

Power System Security in the New Industry Environment: Challenges and Solutions Prabha Kundur Powertech Labs Inc. Surrey, B.C. Canada Prabha Kundur Powertech Labs Inc. Surrey, B.C. Canada IEEE Toronto Centennial Forum on Reliable Power Grids in Canada October 3, 2003 pk1443 - 1

Power System Security Security of a power system is affected by three factors: Characteristics of the physical system: the integrated generation, transmission and distribution system protection and control systems Business structures of owning and operating entities The regulatory framework pk1443 - 2

Challenges to Secure Operation of Today's Power Systems Power Systems are large complex systems covering vast areas national/continental grids highly nonlinear, high order system Many processes whose operations need to be coordinated millions of devices requiring harmonious interplay pk1443 - 3

Challenges to Secure Operation of Today's Power Systems (cont'd) Complex modes of instability global problems different forms of instability: rotor angle, voltage, frequency "Deregulated" market environment many entities with diverse business interests system expansion and operation driven largely by economic drivers; lack of coordinated planning pk1443 - 4

Traditional Approach to Power System Stability The November ,9 1965 blackout of Northeast US and Canada had a profound effect on consideration of stability in system design and operation focus, however, has been largely limited to transient (angle) stability The changing characteristics of power systems requires careful consideration of other aspects of stability Interarea oscillations; voltage stability System designed/operated to withstand loss of a single element Operating limits based on off-line studies scenarios based on judgment and experience pk1443 - 5

November 9, 1965 Blackout of Northeast US and Ontario

November 9, 1965 - Blackout of Northeast US and Ontario Clear day with mild weather Load levels in the regional normal Problem began at 5:16 p.m. Within a few minutes, there was a complete shut down of electric service to virtually all of the states of New York, Connecticut, Rhode Island, Massachusetts, Vermont parts of New Hampshire, New Jersey and Pennsylvania most of Ontario Nearly 30 million people were without power for about 13 hours pk1443 - 7

Events that Caused the 1965 Blackout The initial event was the operation of a backup relay at Beck GS in Ontario near Niagara Falls opened circuit Q29BD, one of five 230 kV circuits connecting Beck GS to load centers in Toronto and Hamilton Prior to opening of Q29BD, the five circuits were carrying 1200 MW of Beck generation, and 500 MW import from Western NY State on Niagara ties Net import from NY 300 MW Loading on Q29BD was 361 MW at 248 kV; The relay setting corresponded to 375 MW pk1443 - 8

Events that Caused the 1965 Blackout (cont’d) Opening of Q29BD resulted in sequential tripping of the remaining four parallel circuits Power flow reversed to New York total change of 1700 MW Power surge back to Ontario via St. Lawrence ties ties tripped by protective relaying Generators in Western New York and Beck GS lost synchronism, followed by cascading outages After about 7 seconds from the initial disturbance system split into several separate islands eventually most generation and load lost; inability of islanded systems to stabilize pk1443 - 9

Formation of Reliability Councils Northeast Power Coordinating Council (NPCC) formed in January 1966 to improve coordination in planning and operation among utilities in the region that was blacked out first Regional Reliability Council (RRC) in North America Other eight RRCs formed in the following months National/North American Electric Reliability Council (NERC) established in 1968 Detailed reliability criteria were developed Procedures for exchange of data and conducting stability studies were established many of these developments has had an influence on utility practices worldwide still largely used pk1443 - 10

Examples of Recent Major System Disturbances/Blackouts July 2, 1996 disturbance of WSCC (Western North American Interconnected) System August 10, 1996 disturbance of WSCC system 1998 power failure of Auckland business districts, New Zealand March 11, 1999 Brazil blackout July 29, 1999 Taiwan disturbance August 14, 2003 blackout of Northeast U.S. and Ontario pk1443 - 11

July 2, 1996 WSCC (WECC) Disturbance

WSCC July 2, 1996 Disturbance Started in Wyoming and Idaho area at 14:24:37 Loads were high in Southern Idaho and Utah; High temperature around 38°C Heavy power transfers from Pacific NW to California Pacific AC interties - 4300 MW (4800 rating) Pacific HVDC intertie - 2800 MW (3100 capacity) pk1443 - 13

WSCC July 2, 1996 Disturbance (cont'd) pk1443 - 14

WSCC July 2, 1996 Disturbance (cont'd) LG fault on 345 kV line from Jim Bridger 2000 MW plant in Wyoming to Idaho due to flashover to a tree tripping of parallel line due to relay misoperation Tripping of two (of four) Jim Bridger units as stability control; this should have stabilized the system Faulty relay tripped 230 kV line in Eastern Oregon Voltage decay in southern Idaho and slow decay in central Oregon pk1443 - 15

WSCC July 2, 1996 Disturbance (cont’d) About 24 seconds later, a long 230 kV line (Amps line) from western Montana to Southern Idaho tripped zone 3 relay operation parallel 161 kV line subsequently tripped Rapid voltage decay in Idaho and Oregon Three seconds later, four 230 kV lines from Hells Canyon to Boise tripped Two seconds later, Pacific intertie lines separated Cascading to five islands 35 seconds after initial fault 2.2 million customers experienced outages; total load lost 11,900 MW Voltage Instability!!! pk1443 - 16

WSCC July 2, 1996 Disturbance (cont'd) pk1443 - 17

WSCC July 2, 1996 Disturbance (cont'd) pk1443 - 18

ETMSP was Used to Replicate Disturbance in Time Domain MEASURED RESPONSE SIMULATED RESPONSE pk1443 - 19

August 10, 1996 WSCC (WECC) Disturbance

WSCC August 10, 1996 Disturbance High ambient temperatures in Northwest; high power transfer from Canada to California Prior to main outage, three 500 kV line sections from lower Columbia River to load centres in Oregon were out of service due to tree faults California-Oregon Interties loaded to 4330 MW north to south Pacific DC Intertie loaded at 2680 MW north to south 2300 MW flow from British Columbia Growing 0.23 Hz oscillations caused tripping of lines resulting in formation of four islands loss of 30,500 MW load pk1443 - 21

August 10th, 1996 WSCC Event pk1443 - 22

WSCC August 10, 1996 Disturbance (cont'd) 2300 2400 2500 2600 2700 2800 2900 3000 3 6 9 12 16 19 22 25 28 31 34 37 40 43 47 50 53 56 59 62 65 68 71 74 Time in Seconds Malin - Round Mountain MW Flow pk1443 - 23

WSCC August 10, 1996 Disturbance (cont'd) As a result of the undamped oscillations, the system split into four large islands Over 7.5 million customers experienced outages ranging from a few minutes to nine hours! Total load loss 30,500 MW pk1443 - 24

ETMSP was Used to Replicate Disturbance in Time Domain MEASURED RESPONSE SIMULATED RESPONSE pk1443 - 25

Sites Selected for PSS Modifications San Onofre (Addition) Palo Verde (Tune existing) pk1443 - 26

Power System Stabilizers With existing controls Eigenvalue = 0.0597 + j 1.771 Frequency = 0.2818 Hz Damping = -0.0337 With PSS modifications Eigenvalue = -0.0717 + j 1.673 Frequency = 0.2664 Damping = -0.0429 pk1443 - 27

March 11, 1999 Brazil Blackout

March 11, 1999 Brazil Blackout Time: 22:16:00h, System Load: 34,200 MW Description of the event: L-G fault at Bauru Substation as a result of lightning causing a bus insulator flashover the bus arrangement at Bauru such that the fault is cleared by opening five 440 kV lines the power system survived the initial event, but resulted in instability when a short heavily loaded 440 kV line was tripped by zone 3 relay cascading outages of several power plants in Sao Paulo area, followed by loss of HVDC and 750 kV AC links from Itaipu complete system break up: 24,700 MW load loss; several islands remained in operation with a total load of about 10,000 MW pk1443 - 29

March 11, 1999 Brazil Blackout (cont'd) Measures to improve system security: Joint Working Group comprising ELECTROBRAS, CEPEL and ONS staff formed organized activities into 8 Task Forces Four international experts as advisors Remedial Actions: power system divided into 5 security zones: regions with major generation and transmission system; emergency controls added for enhancing stability improved layout and protection of major EHV substations improved maintenance of substation equipment and protection/control equipment improved restoration plans pk1443 - 30

What Can We Do To Prevent Blackouts?

Methods of Enhancing Security Impractical to achieve complete immunity to blackouts need to strike a balance between economy and security Good design and operating practices could significantly minimize the occurrence and impact of widespread outages Reliability criteria On-line security assessment Robust stability controls Coordinated emergency controls Real-time system system monitoring and control Wide-spread use of distributed generation pk1443 - 32

Reliability Criteria At present, systems designed and operated to withstand loss of any single element preceded by single-, double-, or three-phase fault referred to as "N-1 criterion" Need for using risk-based security assessment consider multiple outages account for probability and consequences of instability Built-in overall strength or robustness best defense against catastrophic failures! pk1443 - 33

Enhancement of Stability: Controls Greater use of on stability controls excitation control (PSS), FACTS, HVDC, secondary voltage control multi-purpose controls Coordination, integration and robustness present challenges good control design procedures and tools have evolved Hardware design should provide high degree of functional reliability flexibility for maintenance and testing Industry should make better use of controls! pk1443 - 34

Development of a Good "Defense Plan" against Extreme Contingencies Judicious choice of emergency controls protection against multiple outages identification of scenarios based on past experience, knowledge of unique characteristics of system, probabilistic approach Coordination of different emergency control schemes complement each other act properly in complex situations Response-based emergency controls should generally be preferred "self-healing" power systems Need for advancing this technology! pk1443 - 35

State-of-the-Art On-Line Dynamic Security Assessment (DSA) Practical tools with the required accuracy, speed and robustness a variety of analytical techniques integrated distributed hardware architecture using low cost PCs integrated with energy management system Capable of assessing rotor angle stability and voltage stability determine critical contingencies automatically security limits/margins for all desired energy transactions identify remedial measures The industry has yet to take full advantage of these developments! pk1443 - 36

Management of System Reliability Roles and responsibilities of individual entities well chosen, clearly defined and properly enforced Coordination of reliability management Need for a single entity with overall responsibility for security of entire interconnected system real-time decisions System operators with high level of expertise in system stability phenomena, tools pk1443 - 37

Future Trends in DSA: Intelligent Systems Knowledge base created using simulation of a large number cases and system measurements Automatic learning, data mining, and decision trees to build intelligent systems Fast analysis using a broad knowledge base and automatic decision making Provides new insight into factors and system parameters affecting stability More effective in dealing with uncertainties and large dimensioned problems We just completed a PRECARN project pk1443 - 38

DSA Using Intelligent Systems pk1443 - 39

Real-Time Monitoring and Control: An Emerging Technology Advances in communications technology have made it possible to monitor power systems over a wide area remotely control many functions Research on use of multisensor data fusion technology process data from different monitors, integrate and process information identify phenomenon associated with impending emergency make intelligent control decisions A fast and effective way to predict onset of emergency conditions and take remedial actions pk1443 - 40

Distributed Generation (DG) Offer significant economic, environmental and security benefits DG becoming increasingly cost competitive Microturbines small, high speed power plants operate on natural gas, future units may use diesel or gas from landfills pk1443 - 41

Distributed Generation (DG) (cont'd) Fuel Cells combine hydrogen with oxygen from air to generate electricity hydrogen may be supplied from an external source or generated inside fuel by reforming a hydrocarbon fuel high efficiency, non-combustion, non-mechanical process Particularly attractive in Ontario generate hydrogen during light load using nuclear generation Not vulnerable to power grid failure due to system instability or natural calamities! pk1443 - 42

Summary The new electricity supply industry presents increasing challenges for stable and secure operation of power systems State-of-the-art methods and tools have advanced our capabilities significantly facing the challenges comprehensive stability analysis tools coordinated design of robust stability controls on-line dynamic security assessment Industry yet to take full advantage of these developments! Need to review and improve the reliability criteria the process for managing "global" system reliability pk1443 - 43

Summary (cont'd) Emerging technologies which can better deal with growing uncertainties and increasing complexities of the problem Intelligent Systems for DSA Real-time monitoring and control "Self-healing" power systems Wide-spread use of distributed generation is a cost effective, environmentally friendly means of minimizing the impact of power grid failures pk1443 - 44

Vulnerability of B.C. Power System to Blackouts Transmission is not very meshed power transmitted from large sources of hydroelectric generation over 500 kV lines Most of the power generation is from hydroelectric plants simple and rugged can be restored quickly Good set of emergency controls generation and load tripping braking resistor Disturbances in western interconnected system result in separation into islands Less vulnerable to complete blackout ! pk1443 - 45

Terminology

Power System Security Security: the degree of risk in the ability to survive imminent disturbances (contingencies) without interruption of customer service depends on the operating condition and the contingent probability of a disturbance To be secure, the power system must: be stable following a contingency, and settle to operating conditions such that no physical constraints are violated The power system must also be secure against contingencies that would not be classified as stability problems, e.g. damage to equipment such as failure of a cable pk1443 - 47

Power System Security (cont'd) Stability: the continuance of intact operation of the power system following a disturbance Reliability: the probability of satisfactory operation over the long run denotes the ability to supply adequate electric service on a nearly continuous basis, with few interruptions over an extended period Stability and security are time-varying attributes; Reliability is a function of time-average performance pk1443 - 48