Vertical Test Stand Update C.M. Ginsburg (Fermilab) For the VTS group: C.Sylvester, Y.Huang, R.Nehring, J.Ozelis, T.Peterson, V.Poloubotko, R.Rabehl, I.Rakhno,

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
US Cavities Status and Plan Mark Champion 01 October 2009.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Fermilab Vertical Cavity Test Facility (VCTF) VTS2&3 Project Status Ruben Carcagno, Camille Ginsburg, and Cosmore Sylvester On behalf of the VTS Group.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
9-cell cavity coordination CM Ginsburg 8 Mar
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Fermilab IB1 Vertical Test Stand Update C.M. Ginsburg (Fermilab) for the VTS group August 31, ft.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9-cell cavity coordination CM Ginsburg 15 Mar
February 13, 2007C.M. Ginsburg (Fermilab-TD)1 Fermilab Vertical Test Facility for ILC cavities Vertical Cavity Test Facility (VCTF) IB1 infrastructure.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
N. Dhanaraj 1 Single Cell Program - Status Single Cell Program - Status March 1, 2007 Thursday.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
S A Griffiths CM42 June 2015 Electrical & Control.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Vertical Test Stand Update
WP High Beta Cavities Delivery
Roadmap for triplet cryostats
Progress and Issues with VTS Upgrade
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
MICE Coupling Coil Update
Injector Performance Requirements Conventional Facilities Update
KEK injector cryomodule
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Prototype cavities development
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
Presentation transcript:

Vertical Test Stand Update C.M. Ginsburg (Fermilab) For the VTS group: C.Sylvester, Y.Huang, R.Nehring, J.Ozelis, T.Peterson, V.Poloubotko, R.Rabehl, I.Rakhno, C.Reid, M.Wong 05.October.2006

05.Oct.2006C.M. Ginsburg ILC/SRF mtg2 VTS Cryostat Two bids received: Meyer Tool and PHPK After technical & price bid evaluation, PHPK selected Purchase order placed Sept. 20 PHPK: – ASME code calculations done for pressure vessel – Minor changes to design requested – they await our approval Not affecting schedule – Will receive instrumentation (liquid level sensors, thermometry, etc.) and J-T heat exchanger from us in the next few weeks – C.Sylvester and T.Peterson very useful visit to PHPK Sept.26 – Will deliver status in ~biweekly teleconferences Cryostat top plate – Baseline design near final – Some top plate is needed for pressure vessel ASME code stamp, not necessarily one we will use for testing cavities – However, top plate for testing will also need ASME code stamp – Preferable to do both at once Delivery by March 2007

05.Oct.2006C.M. Ginsburg ILC/SRF mtg3 More Vertical Test Stand Activities Magnetic Shielding (room-temperature & 2K) – Detail designs in progress – Plan Request for Proposals to include some design work – Meet with J. Zweibohmer and Procurement within ~week Radiation Shielding – Calculations for “final geometry” in progress – Shielding lid movement design in progress – Plan radiation shielding assessment review within ~month – Kamran Vaziri (ES&H) will be our point-of-contact for radiation safety and permissions RF System – Response to RF Review committee Sept.11 – All procurements have been placed – 500W amplifier to be shipped October 5, when tests complete – RF personnel safety interlocks in progress, with Chuck Worel (AD/ES&H)

05.Oct.2006C.M. Ginsburg ILC/SRF mtg4 Still More VTS Activities 9-cell temperature map (not baseline VTS) – Aseet Mukherjee – Conceptual design completed – Few cheap diodes ordered for R&D – Wish to test parasitically in A0 3.9 GHz vertical test MS Project file update for Ken Domann (and us) in progress

05.Oct.2006C.M. Ginsburg ILC/SRF mtg5 Reminder: Project Scope Single, bare 1.3 GHz 9-cell Tesla-style cavities Cryo capacity ~125 W at 2 K Measure Q vs. T (T min ~1.5 K) Measure Q vs. E acc at 2 K 250 W (CW) max RF power required (Q>5x10 9, Eacc<35 MV/m) Maintain “Controlled Area” status in IB1 < 5 mrem/hr immediately outside the shielding <0.25 mrem/hr in normal working areas Foreseen upgrades: –Thermal mapping system, variable input coupler, 2 nd cavity test capability