Chapter Overview 17 May 2012 North Star Chapter 1 Tonights Schedule 6:00 PM – Network and Socialize over Snacks and Soft Drinks COURTESY of STRATASYS 6:30.

Slides:



Advertisements
Similar presentations
San Diego MESA Alliance Industry Advisory Board February 17, 2010.
Advertisements

Chapter Meeting 12 January 2006 North Star Chapter PM Program Theme SE Interaction with other Disciplines Emphasis - Hands On Systems Engineering.
Chapter Overview 14 June 2007 North Star Chapter Program Theme Systems Engineering Practices in Industry Emphasis - Systems Engineering Interaction.
Chapter Overview 18 February 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 23 February 2012 North Star Chapter 1 Tonights Schedule 6:15 PM – Networking and Socialize over Pizza and Soft Drinks 6:45 PM – Welcome.
Chapter Overview 17 February 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Arrive at Boston Scientific 6:30 PM – Welcome and Chapter Overview Brendan.
Chapter Overview 18 June 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.
Chapter Overview 17 January 2008 North Star Chapter 13 March Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 10 June 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview Mark.
Chapter Overview 13 January 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Arrive at 3M 6:30 PM – Customer Innovation Center Tour 7:30 PM – Welcome.
Principles of Systems Engineering. Historical Perspective Industry identified a knowledge gap Lockheed pursued MJSP(MN Job Skills Partnership) and investigated.
Intro to Risk Management One Morning Session: Friday, April 22, 2005, 8:30am – 12:30pm SAIC, Science Drive, Orlando, Florida Registration/Sign-In.
INCOSE Presentation San Francisco Chapter 13 October 2009 Mapping CMMI to Systems Engineering Adrienne Friedman.
Welcome INCOSE Orlando September 15, Welcome Guests Sign-in Sheet Sign-in Sheet Welcome Packets Welcome Packets Welcome Space Coast and Central.
Slide 1 Risk Management Working Group R WG The Risk Management Working Group What it Does & What You Can Do.
College of Continuing Education Systems Engineering Non-credit Certificate.
Chapter Overview 11 September 2008 North Star Chapter Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 12 February 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.
Chapter Overview 13 April 2006 North Star Chapter Program Theme Integrated Product Development Emphasis - Systems Engineering Interaction with Other.
Progress Report - The Development of a Masters Degree in Systems Engineering at the University of Minnesota 20 February 2003 North Star Chapter.
Chapter Overview 11 November 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Appetizers 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 15 February 2007 North Star Chapter Program Theme System Engineering Practices in Industry Emphasis - Systems Engineering Interaction.
Chapter Overview 12 May 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 10 March 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Arrive at PaR Systems 6:40 PM – Welcome and Chapter Overview Paul Frenz,
Chapter Overview 14 April 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 13 October 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 14 August 2008 North Star Chapter Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 12 March 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.
Chapter Overview 11 November 2008 North Star Chapter Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 15 April 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 15 September 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Socialize over pizza and soft drinks 6:45 PM – Welcome and Chapter.
"System Analysis Tools and Techniques: CORE 12 June 2003 North Star Chapter.
Chapter Overview 10 March 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 16 April 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.
Chapter Overview 16 March 2006 North Star Chapter Program Theme Integrated Product Development Emphasis - Systems Engineering Interaction with Other.
THE BASICS OF SYSTEMS ENGINEERING THROUGHOUT THE LIFE CYCLE 16 January 2003 North Star Chapter.
Chapter Overview 14 January 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 10 June 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview Mark.
IEEE Student Activities Mission To provide undergraduate and graduate students who have an interest in IEEE designated fields of Engineering, Computer.
INCOSE Chapter Ambassador-Promoter Orientation Keys to Effective Chapters Example Template 15 March 2012.
Welcome to Toastmasters District 26 Combined Officer Training
1 INCOSE Chesapeake Chapter Enterprise SE Panel Discussion L. Mark Walker/LMC 21 March 2007.
Diski Naim HR Information System Consultant – Oracle Corporation.
NDIA SoS SE Committee Topics of Interest May 25, 2009.
Summary of theme 1 CHALLENGES Uta Wehn de Montalvo 30 May 2013.
5th Annual Innovation Challenge Kick-Off and Overview Info Sessions 1 & 2 Fall 2014 September 9 & 22
INCOSE Systems Engineering Professional (SEP) Program 1 © International Council on Systems Engineering Subject to the restrictions on Copyright.
International Society for Pharmaceutical Engineering Student Chapter Standard of Excellence Training Program Webinar August 2007.
Institute Engagement in AIAA Event Model January 2013.
Corporate Governance in Institutionalizing Project Management’ Narayan Ramtahal Past President and VP Sponsorship Project Management Institute Southern.
Engineering and Technology Management A program in technical decision making and leadership for engineering and business professionals.
VP of Membership Chris Elliott. VP OF MEMBERSHIP PROVIDE LEADERHSIP The Vice President of Membership serves as the main liaison between the Roundtable.
Caterpillar Confidential: Green Corporate Rotational Programs for Engineers Britta Jost – Caterpillar Inc.
BRINGING ALL THE PARTNERS TO THE TABLE FOR THE GOOD OF THE STUDENTS AND THE COMMUNITY! Establishing a Regional Industry Intern Project.
1 International Workshop 26 – 29 Jan 2013 Jacksonville, FL USA COMPETENCY WORKING GROUP Chairs / Co-Chairs: Eileen Arnold / Mimi Heisey / Don Gelosh INCOSE.
Overview of INCOSE and the INCOSE Chesapeake Chapter Erik DeVito, President Elect INCOSE Chesapeake Chapter 9 April 2013.
ISCB-SC - Saraswathi.S Saraswathi S PhD Student Iowa State University Ames, Iowa, USA Chairperson: ISCB-SC-RSG.
© SYBEX Inc All Rights Reserved. Session 2 Project Management Overview: What Is Project Management?
As a Member of INCOSE  Network with ~9,000 Systems Engineering Professionals Internationally  Receive Insight, INCOSE Quarterly Newsletter  Receive.
Systems Engineering In Aerospace Theodora Saunders February AUTOMATION IN MANUFACTURING Leading-Edge Technologies and Application Fairfield University.
Date Version Chapter Logo Here if desired. Same size as Global Logo.
Welcome to the INCOSE North Texas Chapter Meeting Announcements.
Project Management Institute Southern Maryland Chapter Overview of Our Chapter and Benefits to Becoming a PMISOMD Member April
PMI Sydney Chapter New Member Pack Making project management indispensable for business results.
FIRST GENERAL BODY MEETING
Chapter Leader Training Unit 2 - Certification - Technical Operations
INCOSE Digital Artifacts Challenge Team
INCOSE Wasatch Chapter Meeting
INCOSE Wasatch Chapter Meeting
INCOSE Wasatch Chapter Meeting
Presentation transcript:

Chapter Overview 17 May 2012 North Star Chapter 1 Tonights Schedule 6:00 PM – Network and Socialize over Snacks and Soft Drinks COURTESY of STRATASYS 6:30 PM – Welcome and Introductions Elliot Abrons, 2012 Co-President 6:40 PM – INCOSE 2012 Paper SE and PM Intersects and Confusion Eileen Arnold 7:20 PM – Stratasys & the Redeye Business Matt Havekost – Systems Engineering at Stratasys & Facility Tour Jim Orrock 8:30 PM – Adjourn

Chapter Overview 17 May 2012 North Star Chapter Program Theme Systems Engineering In Large, Medium & Small Companies

Chapter Overview 17 May 2012 North Star Chapter 23 February:An Introduction and Tour of ReconRobotics ReconRobotics, Presentation and Host 29 March:Artificial Intelligence Tools for the Systems Engineer Ridgedale Library 19 April: SAVI Technology as a Modeling Tool Honeywell 17 May: INCOSE 2012 Paper Review - plus An Introduction and tour of Stratasys Stratasys Corporation 14 June:Systems Engineering in Healthcare United Health Group Center – Opus Complex 29 July:Summer Social In Planning Calendar

Chapter Overview 17 May 2012 North Star Chapter For posting or seeking job opportunities: Go to: –Select Education and Careers –Select Post a Job –Create an account –Post job openings –Select View Jobs to see the listings Job Opportunities 4

Chapter Overview 17 May 2012 North Star Chapter 5 Why sign in? For the past several years we have had the chapter incentive program to encourage attendance at our meetings. For 2011, a $50 gift certificate for BP gasoline will be awarded to every member attending six or more regular meetings or who brings one new member into the chapter. (Note – You must be a member in good standing for the entire year to qualify) For guests or members attending for the first time, this also insures your notification by of all subsequent events. Attendance BE SURE AND SIGN THE ATTENDANCE LIST! PLEASE WRITE SO WE CAN READ IT!!

Chapter Overview 17 May 2012 North Star Chapter The INCOSE Bylaws state that each attendee Is eligible to receive 1 PDU for attending a regular chapter technical meeting –Maximum award per year of 10 PDUs The North Star Chapter will hereafter make 1 PDU certificates available to those attendees at our meetings who desire them. This benefit is available to members and non members and is directly applicable to CSEP requirements PDU Credit 6

Chapter Overview 17 May 2012 North Star Chapter 7 ISO Project Life Cycle Stakeholder Requirements Definition VerificationRequirements Analysis Transition Architectural Design Validation Implementation Operation Integration Maintenance Disposal Project PlanningProject Assessment Project Control Decision MakingRisk ManagementConfiguration Management Information Management Stakeholder Requirements Definition VerificationRequirements Analysis Transition Architectural Design Validation Implementation Operation Integration Maintenance Disposal Enterprise Environment Management System Life Cycle Process Management Quality Management Resource ManagementInvestment Management Supply Acquisition

Chapter Overview 17 May 2012 North Star Chapter Eileen Arnold, PMP, ESEP-Acq, has over 30 years experience in managing multi-site projects/programs and engineering & management of HW, SW, and Systems across the project and product life cycles, including development, modeling & simulation, SE and PM competency frameworks, and measurement/analysis for both the commercial and defense sectors. She gained insight into the project/program management world with her capability lead assignments at BAE Systems in Fridley, MN. She has a B.S.E.E and an M.A and recently received the Minnesota Federation of Engineering, Science, and Technical Societies (MFESTS) Charles W. Britzius lifetime achievement award. She has been active in INCOSE since 1996, holding positions as Chair of the Competency Working Group, Certification Advisory Group (CAG), and Technical Board/Technical Leadership Team/Technical Operations. She was a leader in formation of the Heartland Chapter and has been the North Star Chapter Director of Government and Academia, editor for the Chapter newsletter The Integrator and acting web master for the chapter web site. She has been President of both chapters. She is also a member of the Project Management Institute (PMI). Eileen Arnold 8

Chapter Overview 17 May 2012 North Star Chapter Paper Critique 9 The objectives of our paper presentations are three fold: Allow member to give their presentation in front of a live audience Allow presenters the opportunity to received constructive critiques so they can improve their presentations Give members who do not attend the international symposium an opportunity to hear papers presented by North Star members Please fill in the critique sheets and turn them in after Eileens presentation

Chapter Overview 17 May 2012 North Star Chapter Jim Orrock holds a B.S. in Aerospace Engineering and an M.S. in Mechanics, both from the University of Minnesota. He has worked in various R&D roles, primarily on industrial control and equipment applications for nearly 30 years, with about half that time at Honeywell where, as a young engineer he was immersed deeply in the systems engineering discipline. Jim joined Stratasys in 2008 as the Systems Engineering Manager. Prior to joining Stratasys Jim held engineering leadership positions with various semiconductor equipment manufacturers, most recently as Director of Systems Engineering for Soligie, a printed electronics additive manufacturing company. Jim moved into the position of Director, Materials Development at Stratasys in late 2011 and still works closely with the Systems Engineering team at Stratasys. Jim Orrock 10