Chapter Overview 18 June 2009 North Star Chapter 1 2009 Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.

Slides:



Advertisements
Similar presentations
Chapter Meeting 12 January 2006 North Star Chapter PM Program Theme SE Interaction with other Disciplines Emphasis - Hands On Systems Engineering.
Advertisements

Chapter Overview 14 June 2007 North Star Chapter Program Theme Systems Engineering Practices in Industry Emphasis - Systems Engineering Interaction.
Chapter Overview 18 February 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 23 February 2012 North Star Chapter 1 Tonights Schedule 6:15 PM – Networking and Socialize over Pizza and Soft Drinks 6:45 PM – Welcome.
Chapter Overview 17 February 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Arrive at Boston Scientific 6:30 PM – Welcome and Chapter Overview Brendan.
Chapter Overview 17 January 2008 North Star Chapter 13 March Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 10 June 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview Mark.
Chapter Overview 13 January 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Arrive at 3M 6:30 PM – Customer Innovation Center Tour 7:30 PM – Welcome.
Principles of Systems Engineering. Historical Perspective Industry identified a knowledge gap Lockheed pursued MJSP(MN Job Skills Partnership) and investigated.
Intro to Risk Management One Morning Session: Friday, April 22, 2005, 8:30am – 12:30pm SAIC, Science Drive, Orlando, Florida Registration/Sign-In.
The International Council on Systems Engineering Introduction & Orientation Membership Committee Co-Chairs Lew Lee, TRW, Dona Lee, Dynamic.
Welcome INCOSE Orlando March 17, Agenda Upcoming Meetings Chapter Business Membership Status Previous Outreach Future Outreach M&S Status Report.
Welcome INCOSE Orlando September 15, Welcome Guests Sign-in Sheet Sign-in Sheet Welcome Packets Welcome Packets Welcome Space Coast and Central.
Slide 1 Risk Management Working Group R WG The Risk Management Working Group What it Does & What You Can Do.
College of Continuing Education Systems Engineering Non-credit Certificate.
Overview An overview of Apprenticeships and the Apprenticeship Vacancy Matching Service Your presenter is Anne Rodriguez Issue 1.0 Apprenticeship Vacancy.
Chapter Overview 11 September 2008 North Star Chapter Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 17 May 2012 North Star Chapter 1 Tonights Schedule 6:00 PM – Network and Socialize over Snacks and Soft Drinks COURTESY of STRATASYS 6:30.
Chapter Overview 12 February 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.
Chapter Overview 17 November 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 13 April 2006 North Star Chapter Program Theme Integrated Product Development Emphasis - Systems Engineering Interaction with Other.
Progress Report - The Development of a Masters Degree in Systems Engineering at the University of Minnesota 20 February 2003 North Star Chapter.
Chapter Overview 11 November 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Appetizers 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 15 February 2007 North Star Chapter Program Theme System Engineering Practices in Industry Emphasis - Systems Engineering Interaction.
Chapter Overview 12 May 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 10 March 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Arrive at PaR Systems 6:40 PM – Welcome and Chapter Overview Paul Frenz,
Chapter Overview 14 April 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 13 October 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 14 August 2008 North Star Chapter Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 12 March 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.
Chapter Overview 11 November 2008 North Star Chapter Program Theme Back to Basics Emphasis - Systems Engineering Life Cycle.
Chapter Overview 15 April 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 15 September 2011 North Star Chapter 1 Tonights Schedule 6:15 PM – Socialize over pizza and soft drinks 6:45 PM – Welcome and Chapter.
"System Analysis Tools and Techniques: CORE 12 June 2003 North Star Chapter.
Chapter Overview 10 March 2005 North Star Chapter PM Program Theme Integrated Product Development Emphasis - Hands On Systems Engineering (Basics.
Chapter Overview 16 April 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.
Chapter Overview 16 March 2006 North Star Chapter Program Theme Integrated Product Development Emphasis - Systems Engineering Interaction with Other.
THE BASICS OF SYSTEMS ENGINEERING THROUGHOUT THE LIFE CYCLE 16 January 2003 North Star Chapter.
Chapter Overview 14 January 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview.
Chapter Overview 10 June 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration, Networking, Pizza 6:45 PM – Welcome and Chapter Overview Mark.
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
International Organization International Organization
Michigan Section Dinner Meeting 20 October 2010, Uptown Grille, Commerce Twp, MI.
American Society for Quality Certification Programs Presented 21 July 2009 by Diane G. Kulisek
INCOSE Chapter Ambassador-Promoter Orientation Keys to Effective Chapters Example Template 15 March 2012.
Niagara Portal Introduction January 2007 Scott Muench - Technical Sales Manager.
Huntsville National Contract Management Association (NCMA) Speaker: Sherry Trowbridge Huntsville NCMA - President Business Success Through Contract Management.
DT&E Cmte - Walking The Line with Title 10 1 Beth Wilson Industry Co-Chair NDIA System Engineering Division, DT&E Committee Test Architect, Raytheon Company.
Welcome to Toastmasters District 26 Combined Officer Training
Achieving Success as President Club Leadership Training Session.
© WRI & WBCSD, 2010 Metropolitan Washington Council of Governments (COG) Recycling Committee Meeting March 18, 2010 Greenhouse Gas Protocol Product/Supply.
1 INCOSE Chesapeake Chapter Enterprise SE Panel Discussion L. Mark Walker/LMC 21 March 2007.
1 Director-Elect Activities Report Charles Rubenstein Region 1 Director-Elect Region 1 Board Meeting Newark, NJ 7 February 2009.
VOORBLAD.
National Order of the Arrow Conference Western Region Promotional Webinar February 9, 2012.
1 Phase III: Planning Action Developing Improvement Plans.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
Weekly Attendance by Class w/e 6 th September 2013.
5th Annual Innovation Challenge Kick-Off and Overview Info Sessions 1 & 2 Fall 2014 September 9 & 22
African Aviation Training Organization
International Society for Pharmaceutical Engineering Student Chapter Standard of Excellence Training Program Webinar August 2007.
Overview of INCOSE and the INCOSE Chesapeake Chapter Erik DeVito, President Elect INCOSE Chesapeake Chapter 9 April 2013.
As a Member of INCOSE  Network with ~9,000 Systems Engineering Professionals Internationally  Receive Insight, INCOSE Quarterly Newsletter  Receive.
Welcome to the INCOSE North Texas Chapter Meeting Announcements.
INCOSE Wasatch Chapter Planning Meeting
Presentation transcript:

Chapter Overview 18 June 2009 North Star Chapter Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle

Chapter Overview 18 June 2009 North Star Chapter 2 Tonights Agenda 6:15 PM – Registration, Networking, Timber Lodge Appetizers 6:45 PM – Welcome and Chapter Overview Neill Radke, Chapter Co-President 7:00 PM – Application of a Global Systems Engineering Competency Framework; INCOSE 2009 Paper Eileen Arnold 7:45 PM – Personal Rapid Transit Design and Progress Dr. Ed Anderson 8:30 PM – Adjourn

Chapter Overview 18 June 2009 North Star Chapter 3 Chapter Calendar Chapter Organization Chapter Communications INCOSE Events SE Certification Job Opportunities Chapter Meeting

Chapter Overview 18 June 2009 North Star Chapter 4 8 January – SE Initiatives at Starkey Labs, with a detailed tour of the Starkey facilities Starkey Laboratories 12 February – SE in Production Systems with a tour of the PaR Facilities PaR Systems 12 March – SE in a Student Project Wayzata High School 16 April – SE in Determining Interfaces Medtronic (MTS Corporation as Host) 28 May – SE in the Solar House Student Project National Competition University of Minnesota 18 June – Dry run of papers for INCOSE 2009 plus a special report on worldwide progress in developing the Personal Rapid Transit – PRT - System Eden Prairie Timber Lodge 2009 Meeting Calendar

Chapter Overview 18 June 2009 North Star Chapter 5 12 July – The North Star Summer Social, including IS 2009 Debrief Lake Minnetonka Cruise on the 1906 Steamboat Minnehaha Dinner at Biella Italian Restaurant - Excelsior 13 August – SE in Operations and Maintenance Xcel Energy 10 September – SE in Determining Architecture Eaton Corporation 8 October – SE in Architecture and Trade Studies Lockheed 12 November – SE in Requirements Development Honeywell 13 December – Annual North Star Holiday Party Place - TBD 2009 Meeting Calendar

Chapter Overview 18 June 2009 North Star Chapter 6 Why sign in? For the past several years we have had the chapter incentive program to encourage attendance at our meetings. For 2009, two $25 gift certificates for the TimberLodge Restaurant will be awarded to any member attending six or more regular meetings or who brings one new member into the chapter. For guests or members attending for the first time, this also insures your notification by of all subsequent events. Attendance BE SURE AND SIGN THE ATTENDANCE LIST! PLEASE WRITE SO WE CAN READ IT!!

Chapter Overview 18 June 2009 North Star Chapter Attendance at our meetings is Growing but so is the cost of Pizza (and Timber Lodge appetizers!) We will continue to have networking time and serve appetizers and soft drinks. We ask that you help us a bit by making a voluntary donation. You decide if and the amount and place it in the gold box. Donations 7 Many thanks, your response so far has been most helpful

Chapter Overview 18 June 2009 North Star Chapter Topic: System Integration, Test, Evaluation (SITE) –Introduction to SITE –SITE Entry Criteria –Preparation for SITE –SITE Conduct –SITE Exit Criteria –System Validation –SITE Programmatic and Technical Planning Presenter: Charles Wasson Date: Saturday, 14 November Place: Lockheed Martin, Eagan, MN Fall Tutorial Early Alert! 8

Chapter Overview 18 June 2009 North Star Chapter 2009 Chapter Organization INCOSE Certification Advisory Group (CAG) Eileen Arnold – Chair CAG Project Manager Dave Walden Contact Eileen Arnold Systems Science SE Technical Process Architecture SE Management Process Requirements Risk SE Support Processes Measurement Modeling & Tools Specialty Engineering Application Sectors President Neill Radke & John Palmer Secretary Bob Hunter Treasurer Mark Elpers Dir. Industry Mark Feitel President Elect Mark Elpers Past President Elliot Abrons Dir. Acad/Govt Eileen Arnold North Star Leadership Communication Eileen Arnold Technical Operations

Chapter Overview 18 June 2009 North Star Chapter Communication North Star Chapter Web Site: North Star Newsletter – The Integrator –June 2009 issue to be published and viewable/downloadable on 21 June North Star Chapter Meeting Information –Charts from past meetings are viewable and downloadable on the website

Chapter Overview 18 June 2009 North Star Chapter 11 INCOSE Events Details June 22 – 26, 2009: PSM (Practical Software and Systems Measurement ) Orlando, Florida July 15, 2009: Terminal 5 Rail Project: An Untold Success Story INCOSE Webinar July , 2009: INCOSE International Symposium Singapore July , 2010: INCOSE International Symposium Chicago

Chapter Overview 8 May 2008 North Star Chapter Chapter Overview 18 June 2009 Professional Certification Program International Council on Systems Engineering has established a multi-level Professional Certification Program to provide a formal method for recognizing the knowledge and experience of systems engineers, regardless of where they may be in their career.

Chapter Overview 18 June 2009 North Star Chapter For opportunities, either with your company or that you know of: Go to –Select Education and Careers –Select Post a Job –Create an account –Post job openings –Select View Jobs to see the listings Job Opportunities 13

Chapter Overview 18 June 2009 North Star Chapter ISO Systems Engineering Project Life Cycle Stakeholder Requirements Definition VerificationRequirements Analysis Transition Architectural Design Validation Implementation Operation Integration Maintenance Disposal Project PlanningProject Assessment Project Control Decision MakingRisk ManagementConfiguration Management Information Management Stakeholder Requirements Definition VerificationRequirements Analysis Transition Architectural Design Validation Implementation Operation Integration Maintenance Disposal Enterprise Environment Management System Life Cycle Process Management Quality Management Resource ManagementInvestment Management Supply Acquisition

Chapter Overview 18 June 2009 North Star Chapter Eileen Arnold, CSEP-ASQ, is currently a principal systems engineer at BAE Systems in Fridley, Minnesota. She has 29 years of experience in the engineering and management of HW, SW, and Systems to include product development, modeling and simulation, SE competency, measurement/analysis, and systems life cycle process for both the commercial and defense sector. She is currently Co-Chair of the INCOSE Certification Advisory Group (CAG). She helped start the INCOSE Heartland Chapter and is most active in the North Star Chapter acting as the Director of Government and Academia, editor of the chapter newsletter The Integrator and as web master of the chapter web site. She has been President of both Chapters. Eileen Arnold 15

Chapter Overview 18 June 2009 North Star Chapter Dr. Ed Anderson was a professor of Mechanical Engineering at the U of MN for 23 years where he worked on the theory and application of Personal Rapid Transit (PRT) systems. He chaired four international conferences on PRT, lectured and gave courses widely in the U. S. and abroad on transit systems analysis and design, authored the textbook Transit Systems Theory, and published over 100 technical papers, mostly on PRT topics. In 1981, he initiated the design of a new PRT system, and in 1986, he moved to Boston University as a Professor of Aerospace and Mechanical Engineering where he formed an industry team with members from five Boston-area companies to carry his PRT design to the point that in 1989 it attracted the attention of the Chicago RTA and Raytheon Company. In 1994, he moved back to the Minneapolis area where he has continued to work on commercialization of his system, which he now calls an Intelligent Transportation Network System (ITNS). Ed Anderson 16