Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.

Slides:



Advertisements
Similar presentations
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Advertisements

Frequency Responsive Reserve Process Update
WECC Reliability Based Control Field Trial
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
WECC Reliability Based Control Field Trial
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Generator Governor Frequency Response Alert
Physical Security CIP NERC Standing Committees December 9-10, 2014.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Business Planning and Strategy Alignment Planning Process
MAC Committee Update Robert Kondziolka, MAC Chair.
Student Learning Objectives The SLO Process Student Learning Objectives Training Series Module 3 of 3.
11 the best Customer satisfaction enhancement plan N. Jerry Simonoff Director, IT Investment & Enterprise Solutions CIO-CAO.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
WIRAB Comments to the Peak Reliability Interim Board Doug Larson, WIRAB December 4, 2013.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
August 7, Market Participant Survey Action Plan Dale Goodman Director, Market Services.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
Legislative Policy Committee ISAC Board approved concept at their meeting in December.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
School Accreditation School Improvement Planning.
HEALTH WORKFORCE HEALTH SYSTEM TRANSFORMATION Oklahoma State Innovation Model.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
Transition Plan Network Operations Model Change Requests 5/26/2010.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Western Electricity Coordinating Council
Proposed RISC 2014 Deliverables, Activities, and Calendar
Compliance Open Webinar
Integration of Variable Generation Task Force (IVGTF)
NERC Reliability Standards Development Plan
Integration of Variable Generation Task Force (IVGTF)
Western Electricity Coordinating Council
Compliance Open Webinar
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Eric Baran, WIRAB Staff April 30, 2018
NERC Reliability Standards Development Plan
2015 January February March April May June July August September
Presentation transcript:

Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010

2 FRI Objectives  Coordinate all NERC standards development and performance analysis activities related to frequency response and control  Identify specific frequency-related reliability factors  Identify root causes of changes in frequency response  Identify practices and methods to address root causes  Consider impacts of integration of new generation technologies (such as wind, solar, and significant nuclear expansion)

3 FRI Objectives  Develop metrics and benchmarks to improve frequency response performance tracking  Share lessons learned with the industry via outreach, alerts, and webinars  Determine if performance-based frequency response standards are warranted

4 Near-Term Tasks  Develop a clear set of terminology for use by NERC and the industry RS, FRWG, Freq. SDTs, SARI staff Start Date: April 26, 2010 Out for comment from PC & OC Target End Date: September 30, 2010  Issue an Recommendation (ROP § 810) and survey to collect data and information for analysis Survey drafting team, SARI staff Start Date: May 2010 Issue: Sept. 9-15, 2010 GOs/GOPs – 3-month response required BAs – 45 day response required Target End Date: Dec. 31, 2010

5 Near-Term Tasks  Analyze current and historical Primary and Secondary Control Response performance – what factors influence that performance (original tasks 3&4) Control Factor Task Team  RS, FRWG, Freq. SDTs, SARI staff Start Date: Aug. 2, 2010 Analyze  Existing primary control parameters – governor behavior  ACE equation influences – Appropriate Frequency Bias levels (mid-term task)  Plant-level controls influence  More? Target End Date: Jan. 31, 2011

6 Near-Term Tasks  Develop automated method for determining frequency deviation events to be used for BAs to measure Primary Control Response RS, FRWG, & SARI staff Start Date: Aug. 1, 2010 Parameters for events being evaluated by RS & FRWG Evaluating CERTS FMA Tool Incorporate FNet-like detection & triangulation algorithm  Potential modifications – DOE funding  Scope changes by Oct. 31, 2010 Quarterly review of event list and selection by RS or FRWG Target End Date: April 29, 2011

7 Near-Term Tasks  Develop appropriate metrics for tracking frequency performance on each interconnection to monitor trends and performance RS, FRWG, Freq. SDTs, & SARI staff Start: October 1, 2010 Target End Date: December 31, 2010

8 Near-Term Tasks  Develop sustainable methods for auto- matically collecting, trending, and analyzing various elements of frequency response and control for frequency deviation events RS, FRWG, Freq. SDTs, & SARI staff Start Date: Aug. 1, 2010 Data collection being evaluated by RS & FRWG Evaluating CERTS FMA Tool Incorporate PMU-based determination of Points A, B & C  Potential modifications – DOE funding  Scope changes by Oct. 31, 2010 Target End Date: April 29, 2011

9 Mid-Term Tasks  Determine appropriate minimum Bias settings for use in AGC systems as part of an overall Frequency Response and Control strategy RS, FRWG, Freq. SDTs, & SARI staff Analyze variability of frequency response to determine range of frequency response that must be protected Analyze sensitivity to performance for various Frequency Bias settings in ACE equations Start: November 1, 2010 Target End Date: April 29, 2011

10 Mid-Term Tasks  Improve transient dynamic models of Primary Control Response for generators and other devices Governor Review Team – DOE funding  John Undrill/Eric Allen  Student assistance  Regional modeling groups Compare GO/GOP Survey information against dynamic models  Critical evaluation  Analysis of control parameters in models  Recommendations for improvements & Feedback to regions and GOs Start: November 1, 2010 Target End Date: September 30, 2011

Some Frequency Control Initial Findings  No system wide tuning strategy being employed  Prior to interconnections of systems, it was necessary to tune each governor to regulate system frequency in isolation  The necessity of stable isolated governing has given way in many cases to faster load ramping or AGC control

WECC Hydro

Retuned Hydro Governors

14 Mid-Term Tasks  Explore and analyze what are appropriate frequency response and control performance requirements to maintain system reliability RS, FRWG, Freq. SDTs, & SARI staff In-depth analysis control performance requirements for generators Evaluate progress made in ERCOT  Lowered deadband to ±16.7 mHz  No-step method of droop application Report to OC/PC Possible recommendations for SARs Start: November 1, 2010 Target End Date: April 29, 2011

15 Longer-Term Tasks  Develop and implement mid-term dynamic models of Primary Control Response of generators and other devices Potential participants – TIS, SPCS, MVTF, turbine / generator and controls manufacturers Research required – potential DOE funding Tied to Modeling Improvements and System Protection Initiatives Projected Start: January 2011 Target End Date: December 2012

16 Longer-Term Tasks  Analyze current Inertial Response and determine what factors influence performance Potential participants – TIS, MVTF, regional dynamics groups Collect inertial response information from PMU data for Eastern and Western Interconnections  National labs collecting data from data concentrators for frequency events determined by RS/FRWG Data Collection Start: October 1, 2010 Target End Date: December 2012

17 Longer-Term Tasks  Examine Primary Control Frequency Response characteristics of electronically- coupled resources and “smart grid” loads Develop load and “generator” models (research required) to properly analyze influence on system behavior in transient, post-transient, and mid-term stability  Potential DOE funding  Work underway – BPA initiative on load analysis Potential participants – TIS, MVTF, regional dynamics groups Start Date: August 1, 2010 Target End Date: December 2012

18 Longer-Term Tasks  Explore how displacement of inertial generation with electronically-coupled resources might influence Inertial Response Potential participants – TIS, MVTF, regional dynamics groups Analyze sensitivity of system dynamics to changes in inertial response and synchronizing torque  Attenuation of oscillatory impulses  Dynamic cohesion Predecessor – determining characteristics of electronically-coupled resources and loads Start Date: June 2011 Target End Date: July 2012

19 Reporting & Ongoing Activities Ongoing Activities  Communications / Educational Outreach Technical Reference Documents Webinars / Workshops  Metrics & Calculations Ongoing determination of frequency events for analysis Quarterly determination of response performance Reporting on FRI Progress  Oct. 18, 2010 – Report to FERC  Dec. 31, 2010 – Report to Board  February 2011 – R eport to Board and FERC  2011 & 2012 Quarterly Reports to Board