I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Selected Acquisition Report (SAR) Maj Kyle Reybitz SAF/AQXRR as of.

Slides:



Advertisements
Similar presentations
Under Secretary of Defense for Acquisition, Technology and Logistics
Advertisements

Policies and Procedures for Proper Use of Non-DoD Contracts Revised April 19, 2005 Deidre A. Lee Director, Defense Procurement and Acquisition Policy Office.
Washington Headquarters Services Executive Services Directorate Information Management Division OMB Collection Number Paperwork Reduction Act – DoD Public.
Color of Money 101 PEO SYSCOM COMMANDERS’ CONFERENCE Siobhan Tack DAU
1 10 U.S.C. Chapter 144A and Major Automated Information System Annual Reports Presented by the Acquisition Directorate Office of the Assistant Secretary.
Renewals Review January Why are We Here Today ? During today’s web-conference, we’ll : Review the renewals “package” Discuss the process for.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
In-sourcing Guidelines and Procedures By Dr. John Anderson. PDASA, FMMR, OASA(M&RA)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Air Force Cost Analysis in 2011 Mr. Rich Hartley Deputy Assistant.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Proper Use of Non-DoD Contracts SAF/AQCP 6 December 2004.
Security Review Overview
End User Training Materials
Program Visibility, Analysis, and Reporting (PVAR)
0 9 Dec 2009, V1.2 Bradford Brown Director for Acquisition & Program management Directive-Type Memorandum (DTM) Implementation of the Weapon Systems.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
1 Army Policy and Procedures for Proper Use of Non-DoD Contracts Ed Cornett Procurement Policy and Support July 13 & 19, 2005 Presented to: Army Requiring.
1 How the AT&L Direct Budget System aka budgeOmatic and the Executive Information System aka zoomOrama fit into OSD management Presentation outline: Scope.
EPA Update- Bob Judge Maine Air Quality Monitoring Committee April 18, ) NAAQS schedule 2) Budget 3) Technical Systems Audit.
Office of Acquisition and Property Management Completing an Effective Project Data Sheet (PDS)
OSF/ISD Project Portfolio Management Framework January 17, 2011.
1 American Recovery and Reinvestment Act (ARRA) Reporting Requirements Presented by: Darryl Grant Procurement Analyst Division of Acquisition Policy &
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
THE AFMC MOASP Air Force Materiel Command D. Brian Morris HQ AFMC/PKV (937) I n t e g r i t y - S e r v i c e - E x.
Air Armament Center Mr. John Mistretta Technical Director, AAC/EN War-Winning Capabilities…On Time, On Cost Systems Engineering Update AAC.
DEFENSE ACQUISITION MANAGEMENT INFORMATION RETRIEVAL DAMIR Funding Formats Klif Hodgkin CACI DAMIR Team Presenter.
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
1 APB, SAR, and Nunn-McCurdy Status DAMIR Conference October 30-31, 2007 Larry Axtell & Wendell Irby OUSD(AT&L)
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
How to Review a SAR (Key attributes of a good SAR) October 2007 DAMIR Conference Dana Harrison (703)
1 GAO’s Use of DAMIR October 31, 2007 David Best Assistant Director
1 Nunn-McCurdy Unit Cost Reporting NDIA PMSC Meeting August 15-16, 2006.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
1 Dr. Nancy L. Spruill Director, Acquisition Resources & Analysis, OUSD(AT&L) Restructure of Business Career Field.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
MAIS Significant and Critical Change Processes 5 Aug 08.
Milt E. Nappier March 25, 2009 Combatant Commander Exercise Engagement Stakeholder Leadership Team (CE2 SLT) FY 2009 CE2T2 Fiscal Update 2009 Midyear Review.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
1 Felisha Hitt, Senior Procurement Analyst March 18, 2008 Defense Acquisition Regulations System
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
DEFENSE ACQUISITION MANAGEMENT INFORMATION RETRIEVAL Defense Acquisition Management Inform a tion Retrieval Version 3.0 DAMIR Training Conference October.
Defense Standardization Program Policy Updates Steve Lowell Deputy Director Defense Standardization Program Office.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
1 Nunn-McCurdy Unit Cost Reporting NDIA PMSC Meeting January 31, 2007.
Life Cycle Cost Composition
Materiel Development Decision (MDD) Information Requirements
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Life Cycle Cost Composition MILCON Facilities Disposal O&M (or others as appropriate ) RDT & E Development Costs of PME & Support Items Systems Engineering.
Business, Cost Estimating & Financial Management Considerations
Presidential Direction
Defense Acquisition Management Information Retrieval Version 3
October 31, 2007 David Best Assistant Director
MDD to Milestone A Requirements Management Activities
Defense Acquisition Executive Summary (DAES) Reporting and Review
Milestone A to Milestone B Requirements Management Activities
Program Visibility, Analysis, and Reporting (PVAR)
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
APB, SAR, and Nunn-McCurdy Status
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Internet Access Control Project Status
Acquisition Directorate
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
Mentor-Protégé Program (MPP) Program Management Review (PMR)
CARD: Basically must be prepared any time an independent estimate (ICE or CCA) is to be done
The Department of Defense Acquisition Process
Mark Robinson FINANCE DIVISION SUPPORT
Understanding: Wide Area Workflow Payment
NDIA PMSC Meeting May 21, 2009 Larry Axtell, OUSD(AT&L)
Mark Robinson FINANCE DIVISION SUPPORT
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Selected Acquisition Report (SAR) Maj Kyle Reybitz SAF/AQXRR as of 19 Jan 10

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2 Outline Definition and Requirements Purpose and Uses Content Dec 09 SAR List Dec 09 SAR Schedule Process Dec 09 Nuances Summary

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3 SAR Definition and Requirements What is a SAR? A standard, comprehensive summary reporting of schedule, performance, and cost information on Major Defense Acquisition Programs (MDAPs) within the Department of Defense (DoD) and to the Congress. Statutory Requirement Title 10, Sec Regulatory Requirement DoDI Reported “Quarterly” Dec: Annual for all MDAPs (currently 32 AF Programs) report submitted to Congress 60 days after PB submission Mar, Jun and Sep: by exception/out-of-cycle Nunn-McCurdy Unit Cost Breach >6 month schedule delay in the Current Estimate (CE) since last SAR Initial SAR (“quarter” following Milestone B decision) Termination SAR (>90% expended or delivered) Rebaselining from one Major Milestone to the next

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 4 SAR Purpose and Uses Purpose Provides status of an MDAP at a specific moment in time while documenting accomplishments, updating program information and explaining variations from previous reports Deliverable to Congress First source of information for staffers, committees, etc. Publically accessible through FOIA requests Authoritative source for MDAP information Frequently accessed by all levels of DoD Various elements analyzed to develop metrics and assess progress/health

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5 SAR Content SECTIONS 1. Program Information 2. Responsible Office 3. References 4. Mission & Description 5. Executive Summary 6. Threshold Breaches 7. Schedule 8. Performance 9. Track to Budget 10. Cost & Funding 11. Low Rate Initial Production 12. Foreign Military Sales 13. Nuclear Costs 14. Unit Cost 15. Cost Variance* 16. Contracts 17. Deliveries & Expenditures 18. Operating & Support Costs 19. Classified Annex (if required) COMPARED TO QUARTERLY DAES RED – mostly overlapping data GREEN – partially overlapping data BLUE – mostly unique data * Cost Variance most time consuming (19)

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6 Where are SARs? Created/stored in Defense Acquisition Management Information Retrieval (DAMIR) OSD’s System to store/ authoritative source of: APBs SARs DAESs Other Role based access/privileges PMO, PEO, AQ, OSD Basic, Review, Editor, Release Access thru AQXRR available for the following: Gov’t civilians Military Support Contractors (request must come from Civ/Mil)

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7 Dec 09 SAR Programs 31 Total PEO/AC (11) C-130 AMP C-130J C-17A C-5 AMP C-5 RERP JCA LAIRCM B-2 EHF B-2 RMP F-22 JPATS PEO/SP (8) SBIRS-HIGH SBSS BLK 10 AEHF FAB-T GBS WGS GPS IIIA NAVSTAR GPS PEO/ES (1) NPOESS DAO/AFNWC (1) Minuteman III PRP** PEO/WP (3) AMRAAM JASSM JDAM PEO/C2&CS (2) MP-RTIP NAS *Initial SARs ** Termination SARs SAF/AQXRR POCs Mr. Alan Lachel, DSN Maj Kyle Reybitz, DSN Maj Mark Murray, DSN Mr. Bob Loop, DSN PEO/ISR (4) ASIP* RQ- 4 Global Hawk MQ-1 Predator* MQ-9 Reaper* PEO/JSF (1) F-35 WI AP WI AP HC WI HC DJ MM DJ HC LA DJ OSD/AT&L ARA AM POCs LA – Mr. Larry Axtell, WI – Mr. Wendel l Irby, AP – Mr. Andy Pozda, HC – Mr. Harry Chelpon, DJ – Mr. Derek Jaquish, MM – Ms. Margaret Mattei, MB – Mr. Mike Burke, JW – Mr. James Wessels, MM DJ AP MB AP HC AP HC MM JW

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dec 09 SAR Schedule Reports due to OSD (17 Feb) OSD Final Review (11-18 Mar) FebruaryMarch 12 Reports due to AQXR (8 Feb) Security Review & SAR Classified Annex copies (22-26) OSD to Congress (2 Apr) Telcons (3-10 Mar) PMO Corrections (9-16 Mar) OSD SAR Memo (13 Jan) PMOs Enter SAR in DAMIR PEOs release (1 Jan – 8 Feb) FY11 Budget (1 Feb) January April AQXR Review (9-17 Feb) PMO/PEO OPR AQXRR OPR OSD OPRPMO & AQXRR OPRs

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 9 SAR Process AT&L Memo OSD PEO PMO AQX Memo PEO Instructions Generate SAR PEO Inputs to AQX Provide PB Funding Inflation Indices AQX Review OSD Review Teleconference Review OSD SPO AQX PEM USA Incorporate Revisions Final AQ Submission OSD Review & Submission to Congress Security Review Submission to OSD AQ

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 10 SAR – AQXR Role Coordinate with OSD, PEOs and PMOs Support telcons with PMOs, OSD & AQX Also PEM and PEO staffs in some cases Package and process classified annexes Quality check of documents Manage back-and-forth activity between Air Force and OSD

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 11 Dec 09 SAR Considerations Dec 09 SARs expected to document accomplishments and variances since Dec 07 SARs Dec 08 “Limited” SARs are available upon request to SAF/AQXRR but are not stored in DAMIR Weapons System Acquisition Reform Act (WSARA) 2009 Impacts TBD (expect guidance from OSD) DTM , Section 5e. “For MDAPs, the confidence level statement shall be also included in the next selected acquisition report (SAR)…” Confidence Level (CL) statement describes the CL used in establishing the cost estimate, the rationale for selecting the CL and if the CL is less than 80 percent, the justification for selecting the lower confidence level. Dec 09 SARs need to be consistent with PB11 FYDP and J-Books Numbers may not match exactly but variations need to be explained

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 12 SAR - Summary SAR is a PMO deliverable/report to Congress due 60 days after release of PB (forecasted for 1 Feb 10) SAF/AQX is the SAR Service Point of Contact; facilitator between PEO/PMO and OSD Initial SAR submissions for all MDAPS due to SAF/AQXRR by 8 Feb 10; early start is key! AF Inflation indices sent 12 Jan, Army/Navy indices sent 13 Jan Official “SAR Kickoff” Memo from SAF/AQX (including OSD Memo w/Dec 09 SAR specifics) sent week of 25 Jan 10

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 13 BACK-UP

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 14 APB & Nunn-McCurdy Background Purpose: To provide Congressional unit cost reporting for Major Defense Acquisition Programs (MDAPs) that are submitting Selected Acquisition Reports (SARs) (except MDAPs reporting RDT&E only costs prior to Milestone B) Applicable Statute: Title 10, United States Code, Section 2433 (Unit Cost Reports) and Section 2435 (Baseline Description) Unit Cost Measurements (in base-year dollars): PAUC (Program Acquisition Unit Cost) = (RDT&E $ + Procurement $ + MILCON $ + Acquisition-Related O&M $) / Total Quantity APUC (Average Procurement Unit Cost) = Procurement $ / Procurement Quantity Unit Cost Tracking: Compare Current Estimate to Current Baseline Estimate and to Original Baseline Estimate Current Estimate – Latest estimate of approved program Current Baseline Estimate – Currently approved Acquisition Program Baseline (APB) Original Baseline Estimate – APB approved at Milestone B (or initial MDAP APB if designation occurs after Milestone B) Note: Original Baseline Estimate can be revised only after “Critical” Nunn-McCurdy breach.

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15 APB & Nunn-McCurdy Breaches Reporting Requirements: Internal – Quarterly unit cost reporting required from program manager to Service Acquisition Executive via Defense Acquisition Executive Summary (DAES)/Web Services External – Breach reporting (see below) For “Significant” breaches, Service Secretary must notify Congress within 45 days of the report (normally PDR) upon which the determination is based and submit a SAR with the required additional unit cost breach information For “Critical” breaches, in addition to notification and SAR, the USD(AT&L) must certify to Congress within 60 days of the SAR that: 1. The program is essential to the national security 2. There is no alternative which will provide equal or greater capability at less cost 3. The new estimates of the PAUC and APUC are reasonable 4. The management structure is adequate to control PAUC and APUC (Note: Certification not required for terminated program) If either SAR or certification are not submitted on time, obligational authority suspended on all major contracts “Significant Breach”“Critical Breach” Current Baseline Estimate+15%+25% Original Baseline Estimate+30%+50%

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 16 SAR - PEM Participation Beneficial if PEMs are involved in telcons Prep– review their SAR; ID needed changes Attend telecon, provide inputs Following the telcons Process is mostly administrative Minimal PEM involvement If something is broken, PEM should let us know