Dan Packer Construction Management Senior Thesis April 16, 2002

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects August 2009.
Advertisements

Council Rock High School South Brad Kirkham Structures Council Rock High School South Northampton Township Council Rock High School South Brad Kirkham.
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
George Read Hall The University of Delaware
Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Paul Roberts Senior Thesis 2010 Construction Management.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Hearst Recreation Center
Bond Oversight Committee
Pearl Condominiums Philadelphia, PA
Bond Oversight Committee
Redifer Commons Addition & Renovation Project
Introduction James W. & Frances G. McGlothlin Medical Education Center
Wrangle Hill Elementary School New Castle, DE
Outline Introduction Structural Redesign Gravity System
Justin Pennycoff AE Senior Thesis 2008 Construction Management
North Shore at Canton The Pennsylvania State University
Dan Packer CM Option Introduction Existing Buildings and Systems
Commercial Structural Framing Systems
RiverView Condominiums II Chicago, IL
Presentation transcript:

Dan Packer Construction Management Senior Thesis April 16, 2002 Site Improvements & New Middle School Building William Penn Charter School Dan Packer Construction Management Senior Thesis April 16, 2002 Department of Architectural Engineering

Presentation Outline Project Background Site Renovation Planning 4D Site Planning Alternative Structural System Summary Questions

Project Background Quaker School - founded in 1689 Oldest Quaker School in the world High standards – Academic and Athletic Kindergarten – 12th grade Enrollment – 855 students Located in Philadelphia 45 acre campus 5 existing buildings

Project Background Part 1 of Master Plan Part 2 Site Improvements Middle School Building Part 2 Performing Arts Building Middle School Performing Arts

Project Background Primary Project Team Owner: William Penn Charter School General Contractor: Intech Construction, Inc. Architect: Bower Lewis Thrower Landscape Architect/ Civil Engineer: Cairone & Kaupp, Inc. Structural Engineer: O’Donnell & Naccarato MEP Engineer: Paul H. Yeomans, Inc. Acoustical Consultant: Metropolitan Acoustics

Project Background Project Delivery Method

Project Background Project Timeline Site Improvements 29May01 – 03Sept01 Middle School Building 20June01 – 15Aug02

Project Background Project Costs Site Improvements $3.1 Million Middle School Building $7.8 Million Contingency of $300,000 to be used for either phase of the project

Project Background Middle School Building Features Similar Architecture as other buildings on campus Exterior stone matched Main Building’s exterior stone (Wissahickon Schist) Natural Slate roof matching Main Building’s Exposed heavy timber trusses

Project Background Site Improvement Features Demolition Trees and shrubs Tennis courts Sidewalks and asphalt roads Athletic fields Playground area Fencing and signage Sewer piping & structures

Project Background Site Improvement Features New Construction Sanitary and storm sewer piping - structures Underground electrical & telecommunications New parking lots, campus roads, sidewalks, curbs Seven new tennis courts Two new athletic fields with new sod turf Site fencing Playground area with safety surface Landscaping and site furnishings

Site Renovation Planning Pre – Construction Planning Purpose Alleviate headaches during construction Possible cost and time savings Avoid delays by staying on top of issues Permits Long lead time items Create communication between all project members Owner Designers Construction Manager & Subcontractors

Site Renovation Planning Pre – Construction Planning Key items to be addressed Review schedule dates – make sure all are in agreement Parking requirements – temporary parking lot Permits Site utilities, sewer tie-ins Road closure Meet with neighbors and address concerns Home inspections Site specific safety plan

Site Renovation Planning Pre – Construction Planning Key items to be addressed Locate existing utilities Submittals for long lead time items Underground piping and structures Contract a testing consultant Concrete pours Soil compaction rates Discuss site access with Owner

Site Renovation Planning Site Access Not 100% accessible throughout summer May 29, 2001 – small section available June 11, 2001 – remainder of site available Day camps from June 18th – August 3rd DEMO ALLOWED

Site Renovation Planning Addressing the issues Communication between all parties Schedule Constructability Address all issues early Develop site layout plan Use new technology to assist with planning Project collaboration via the internet 4D CAD

4D CAD What is 4D CAD?

4D CAD Advantages & Disadvantages Advantages Ability to clearly communicate plan Identify major issues ahead of time Owner’s needs Constructability Develop a sequencing plan Balance resources – crews and equipment

4D CAD Advantages & Disadvantages Disadvantages Time intensive to develop Expensive In House Outsourced Desired level of detail can be difficult to achieve

4D CAD Benefits for WPCS Site Improvements Construction Manager (GC) Gives opportunity to correct conflicts before they arise in the field during a tight schedule Owner Site access plan – what the contractor expects Subcontractors Allows subs to see number of crews necessary to complete work Where they should be at all times

4D CAD

4D CAD

4D CAD Recommendation Not recommended for WPCS Site Improvements Smaller project Effectively communicate the plan during Pre-Construction Utilize One or Two Week Look-Aheads

Floor System Redesign VS. Concrete Masonry Units – Open Web Steel Joists – Slab on Metal Deck VS. Concrete Masonry Units – Precast Hollow Core Planks

Hollow Core Precast Planks Original System Welded bearing plate 4” Slab on Metal Deck 8” Bond Beam K Series joists ranging from 10 – 26” deep 8” CMU

Hollow Core Precast Planks Proposed System Reinforcement 2” topping slab 8” Precast hollow core plank 8” Bond Beam 8” CMU

Hollow Core Precast Planks System Comparison Steel Joists Hollow Core Plank 10”-26” depth 10” (8” + 2”) deep 3’ O.C. 4’ O.C. Vibration Considerations No vibration Acoustical Issues Sound Attenuation Bridging needed to stabilize Laterally Stable Tack Welded to deck No Metal Deck 9 different types of joists 1 type of concrete plank Welded to steel plate at bearing Reinforcing at Connection to Wall

Hollow Core Precast Planks Schedule Comparison – Saves 22 days 1st & 2nd Floor Sequence Roof enclosed by October 18th

Hollow Core Precast Planks Cost Comparison Original Floor System $202,764 Precast Plank System $180,581 Cost Savings $22,183

Hollow Core Precast Planks Conclusion Recommendation Precast Planks Simpler for field construction Produces minor cost savings Shortens schedule for earlier enclosure

Summary Site Renovation 4D CAD Floor System – Precast Plank Communication between parties Well thought out plan 4D CAD Effective on larger scaled projects Floor System – Precast Plank Simple system Reduce schedule

Common Point Technologies Acknowledgements Thanks to… AE Faculty Fellow Students Friends and Family Intech Construction Nitterhouse Concrete Common Point Technologies

Questions???