Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

Mantychore Nov 2010 WP 7 Andrew Mackarel. Scope of WP 7 MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which.
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
LONG: Laboratories Over Next Generation Networks. Project Description & WP1: Management.
ARCH-05 Application Prophecy UML 101 Peter Varhol Principal Product Manager.
<<replace with Customer Logo>>
ITIL: Service Transition
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Connecting People With Information DoD Net-Centric Services Strategy Frank Petroski October 31, 2006.
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project October 2005.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Kick-off meeting 3 October 2012 Patras. Research Team B Communication Networks Laboratory (CNL), Computer Engineering & Informatics Department (CEID),
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
ACTION PLANNING. Session Objectives By the end of the session, participants will be able to: List the goals of Action Planning Explain the Action Planning.
Network Configuration Management hite_paper0900aecd806c0d88.html.
Enterprise Architecture
What is Business Analysis Planning & Monitoring?
Introduction to Information System Development.
MANTICORE II Kick off meeting Duration: 17.5 months Effort: 76mms Starts: 15/01/2009 Project Leaders: Project Partners: Project Affiliate Partners:
Web Development Process Description
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Connect communicate collaborate Renewable Energy in Ireland Greenstar Network, Mantychore 2012 Andrew Mackarel, HEAnet for GEANT NA3-T3 Workshop 2012.
Renewable Power associated Infrastructure as a Service Presented by: Andrew Mackarel HEAnet EUNIS 2011 Andrew Mackarel HEAnet, Ireland Alin PastramaNORDUnet,
Conquering Complex and Changing Systems Object-Oriented Software Engineering Art for Chapter 11, Project Management.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
The Preparatory Phase Proposal a first draft to be discussed.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations WP5 – Open End-to-End Pilots Implementation Jose Gato Luis –
Cluster Reliability Project ISIS Vanderbilt University.
3rd GA meeting, Dublin WP7 HEAnet Zero-carbon emission virtual infrastructures.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
WP6 Infrastructure Resource Market Place Overview of progress UEssex High-Performance Network Group.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Demonstrators and Pan-European Services Laboratory WP5 session.
IP Networks as a Service Sergi Figuerola Project Coordinator 8 th e-Infrastructure Concertation meeting.
Mantychore FP7 WP4 (SA1) - Software Refinement. Objectives Main duties – Analysis of User Requirements – Implementation – Support and bug fixing This.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
PRJ566 Project Planning & Management Software Architecture.
Software Development A Proposed Process and Methodology.
Introduction to Grids By: Fetahi Z. Wuhib [CSD2004-Team19]
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Network design Topic 6 Testing and documentation.
State of Georgia Release Management Training
MANTYCHORE MANTYCHORE WP7: Zero-carbon emission virtual infrastructures.
Management of Software Project CSM Review By:Nafas.
1 st EGI CTA VT meeting 18 January 2013 C. Vuerli (INAF, Italy), N. Neyroud (CNRS/IN2P3/LAPP, France)
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Connect. Communicate. Collaborate educonf Coordinated support of European videoconferencing under the GN2 SA6 framework Dimitris Daskopoulos, GRNET, AUTH.
1 ETL Framework Definition - For a leading Financial Service Company - Name: Designation: Date: February, 2004 Copyright Wipro Technologies 2004 Consultancy.
INDIGO – DataCloud WP5 introduction INFN-Bari CYFRONET RIA
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
BUDGET 4Distribution of budget per phases of the project; 4Itemization of budget; 4Division of budget per source of contribution; 4Division of budget between:
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
ITIL: Service Transition
GENUS Virtualisation Service for GÉANT and European NRENs
PLM, Document and Workflow Management
WP2 - INERTIA Distributed Multi-Agent Based Framework
EOB Methodology Overview
Physical Architecture Layer Design
The Open Group Architecture Framework (TOGAF)
AICT5 – eProject Project Planning for ICT
Executive Project Kickoff
System Analysis and Design:
Task Manager & Profile Interface
OU BATTLECARD: Oracle Utilities Learning Subscription
Presentation transcript:

Mantychore Oct 2010 WP 7 Andrew Mackarel

Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners Responsibilities distribution 8. Extra needs identified or topics to be discussed and approved by the whole team.

Scope of the WP MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which eventually check the viability of this movement of services (virtual machines (VMs), flexible device configuration utilities, etc...). What are the Tests? ( Experiments, demos or more) Are all features identified with a plan for availability

Mm Distribution Participants: Months – i2CAT, 5 – HEAnet, 2.5 – NORDUnet, 5.0 – TID 2.5 Leader HEAnet Task 1 Start: M7, Apr 2011 End: M25Oct 2012 Task 2 Start: M17, Feb 2012 End: M25Oct 2012 => Terena 2012 – CANARIE and others already running demos

Role of Partners i2CAT T7.1 will contribute on performing the integration between GSN and MANTYCHORE (physical integration between the GSN and the NRENs infrastructure and also the services integration). In T7.2 i2CAT will participate in implementing the necessary algorithms and mechanisms to integrate the Zero-carbon emissions virtual infrastructures into MANTYCHORE services.

Role of Partners HEAnet HEAnet is leading and coordinating this activity. T7.2 being responsible for the joint experimenting on moving virtual resources based on renewable energy availability. – Modifying the GEANT Stitching Framework is their responsible and should highlight the most relevant parameters and the interaction of their attributes to assist in the physical implementations. – HEAnet will also contribute in T7.1 contributing to the physical integration between MANTYCHORE and GSN infrastructures

Role of Partners NORDUnet Leads T7.1 In T7.1 NORDUnet will focus in performing the physical integration between MANTYCHORE and GSN infrastructures and also the services integration. Finally, in T7.2 NORDUnet will be the responsible for ensuring that the algorithms are optimised to perform network migrations.

Role of Partners TID TID will contribute in T7.1 offering part of its infrastructure to integrate MANTYCHORE and GSN. TID will also contribute in T7.2 performing some experiments over part of its infrastructure to ensure that the migration of entire virtual networks works correctly.

The WP plan Determine Energy Expense for each nodes components Details of Current Addressing plan Details of Layer 3 Addressing Plan work out address ranges Plans for testing network connectivity Matrix of all hardware being used by each NREN – Determine if this is selected to match CANARIE suggestion – How does it reflect deployments in Current Networks – How will deliverables for this work tie in with Mantychore Deliverables

The WP plan 2 Need to work out or see plans of proposed work by GSN Need to establish schedule delivery dates from GSN Establish common interface strategies which tie to software deliverables Need to agree task assignments and have buy-in from all participants and their team Leaders Plan Deployments of Nodes Plan Testing stages Check to see that this aligns with Total Project

Objectives Goals to achieve within this task are: Search and design algorithms which will select different policies and an optimised set of options Every MANTYCHORE device has an energy expense will be measured using different techniques. This subtask will search different possibilities to study the electrical consumption of each device and to integrate measuring and reporting algorithms into the MANTYCHORE application. Time is an important dimension in making energy measurements, which will require data capture, logging and historical analysis and comparison features Different options for migrating services are evaluated by conducting trials and experiments to highlight the full capability of these services. GSN will profit from MANTYCHORE’s architecture to increase the flexibility of testing and modelling services. The GEANT Stitching Framework [54] will be extended to characterise and highlight the attributes and energy consumption parameters to allow for easier integration into emerging solutions.

Deliverables 7.1 Integration between MANTYCHORE and GSN report: This deliverable will provide all relevant information related with the new installed resources. It includes all the information to the connection between MANTYCHORE-GSN including information about physical and software components. It is intended to be the comprehensive reference for building MANTYCHORE-GSN infrastructure [month 16]

Deliverables 7.2 Definition of Teams interpretation of Zero Carbon Month 3 Networks migration tests report: All experimental algorithms are presented in this deliverable, which details all the algorithms evaluated. Final experimental conclusions will show the viability of those algorithms selected. As each algorithm is described, full details of implementation features, and their interaction are fully explained (of both the optimal and other algorithms which were researched). [month 25] => Multiple Iterations of Document  Need agreement of Content & Schedule for each Iteration.

Partners Responsibilities Distribution 1 Agreement on WP Breakdown from T7.1 Tie in to WP 2 Dissemination of Activity Plan for staged implementation for WP5 and ensure awareness and compliance to this task.

Partners Responsibilities Distribution 2 Plan for Demos and Tests List of kit available to test Schematics / network diagrams of interconnection Matrix / list of whole solution and interdependencies – Hardware Revision – Driver version – Operating system Utilities required identify specific versions and the Inter relationships List of times when kit is available Special Version of the Stitching Framework with relevant parameters HEAnet and Volunteer

Extra Scope Availability of Test Solutions Access control for users to all Nodes Support for GSN Planned Demonstrations Template for documents for test station setup for each NREN or partner Documentation for all group Demos Agreement / rules for partners who are not members of both MANTYCHORE and GSN

GSN Node & Network

HEAnet GSN Nodes

IBBT GSN Node

i2CAT GSN Green Node i2CAT Rural Node Plan: Rural location Connectivity via a radiofrequency link. Solar Panel setup Capacity: 2000W Dual switch / Power Device Unit configuration Green Power for experimentation Regular grid for maintenance and operation

GSN Sept 2010 Demo