Industrial Controls Engineering Department SM18 Control Systems overview Jeronimo ORTOLA Roberto SPERONI EN/ICE Technical Committee 25 th June 2015.

Slides:



Advertisements
Similar presentations
1. 2 LHC consolidation: tests completed in 2010 Projects completed in 2010 Test facility consolidation Where are we now? Planning Foreseen Activities.
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Time Stamping and archiving of PLC data
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
UNICOS-like system for interlocks II Workshop on PLC-based interlocks systems ITER, Dec 2014 Jeronimo ORTOLA VIDAL CERN Engineering Department, Industrial.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
State Services Commission Crown Copyright 2006 RADIO COMMUNICATIONS – APCO P 25 TECHNICAL STANDARD SUITE It is recommended that the e-GIF committee Approve.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.
Don Wells Hess Corporation
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review of the Tests of Superconducting Magnets in SM18 14 th January 2005 Review of the Cryogenic Infrastructure in SM18 Bruno Vullierme ACR-MT.
Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October H. Reymond.
Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Readiness of test stations for design validation Marta Bajko on behalf of the TE-MSC TF team CERN, 11 th December 2014 QXF design review, CERN.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
TE-MPE- Post LS1 Review: 02 & 03/06/2015, Richard Mompo Upgrade, IST and Powering tests of the WIC systems Richard Mompo for the WIC team 1.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Reconfigurable Radio Systems (RRS) in ETSI Dr Peter Olanders, ETSI TC RRS Chairman Presenter: Gabrielle Owen DOCUMENT #:GSC13-GRSC6-22 FOR: Presentation.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S.,
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October H.
Status, Schedule and EVM for the test facility project
HL-LHC IT STRING and Series test of SC link
TC activities.
Quench protection on the test benches
Test CERN Marta Bajko CERN
HFM Test Station Main Cryostat
Preparation of the activities for the LHC Long Shutdown 2
Engineering - potential areas for action
YETS 2017 TE-CRG-OP overview of tasks to perform during the first month _GF YETS2017_CRG-OP.
EN-ICE Technical Committee SM18 activities & projects
Status of the cryogenic system for B180
Block 4 and Cluster D - Safety
GUAPI working group meeting June 26th 2013
TEST PLANS for HL LHC IT STRING
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Safety Integrity Level (SIL) Classification
Draft CIS work programme
Review of hardware commissioning
Review Bloc 4 and SM18 facilities and upgrade
Radio Dispatch Console
Presentation transcript:

Industrial Controls Engineering Department SM18 Control Systems overview Jeronimo ORTOLA Roberto SPERONI EN/ICE Technical Committee 25 th June 2015

Industrial Controls Engineering Department BACKGROUND  Development started ~ 2002  Many people involved. From C. Dehavay to D. Willeman  All systems inherited  Mainly protection systems but also process control  Many small systems interconnected  20 PLCs under our responsibility  1500 I/Os 225th of June 2015J. Ortola, R. Speroni (EN/ICE)

Industrial Controls Engineering Department SM18 Now 325th of June 2015J. Ortola, R. Speroni (EN/ICE)

Industrial Controls Engineering Department HW layout 425th of June 2015J. Ortola, R. Speroni (EN/ICE)

Industrial Controls Engineering Department Controls layout 525th of June 2015J. Ortola, R. Speroni (EN/ICE) Power Converters Water system FRESCA2 HORIZONTAL TEST BENCH BLOC4 (Cluster G) LONG Cryostat SC Link Station (Pipe) DIODE Cryostat SIETGAL Cryostat POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ HV Mobile Rack 2 HV Mobile Rack 1 E F C B A ARTC1 ARTC2 ARTB1 ARTB2 ARTA1 ARTA2 ARTF1 ARTF2 ARTE1 ARTE2 CU CFBC2 CBFC1 CFBB2 CBFB1 CFBA2 CFBA1 CFBF2 CBFF1 CFBE2 CFBE1 CTH HV1 HV2 SE-F SE-E SE-C SE-B SE-A FRESCA2 BLOC4 HFM Cryostat Cluster D 15 kA

Industrial Controls Engineering Department Control system status 625th of June 2015J. Ortola, R. Speroni (EN/ICE) FRESCA2  In operation 6 weeks a year  Migrated to CPC6 (David Willeman)  No major development foreseen

Industrial Controls Engineering Department Control system status 725th of June 2015J. Ortola, R. Speroni (EN/ICE) BLOC4  In operation  Developed in CPC5  Migration to CPC6 ready  Future HFM cryostat already in the control system.  Future activities:  Risk Analysis  Safety Instrumented System implementation  CPC6 + Safety program

Industrial Controls Engineering Department Control system status 825th of June 2015J. Ortola, R. Speroni (EN/ICE) HORIZONTAL TEST BENCH  Functional analysis  Risk Analysis done  Safety System implemented + CPC6 (Cluster C)  PLC reorganization: from 6 PLCs (1 per cluster + CU) to 1.  HV mobile rack refurbished.  WinCCOA layer implemented  Under commissioning

Industrial Controls Engineering Department Control system status 925th of June 2015J. Ortola, R. Speroni (EN/ICE) HORIZONTAL TEST BENCH  Future activities:  Cluster A, B, E, F protection system implementation  Safety consolidation in all clusters.  CU integration in Safety PLC  Improve data exchange across systems  10 ART PLCs to be migrated to CPC6  Improve documentation

Industrial Controls Engineering Department Control system status 1025th of June 2015J. Ortola, R. Speroni (EN/ICE) Cluster D  2 possible solutions:  QPS + PIC  Potain + Matrix + Safety PLC

Industrial Controls Engineering Department Controls layout 1125th of June 2015J. Ortola, R. Speroni (EN/ICE) Power Converters Water system FRESCA2 HORIZONTAL TEST BENCH BLOC4 (Cluster G) LONG Cryostat SCLink (Pipe) DIODE Cryostat SIETGAL Cryostat HFM Cryostat POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ POTAIN MATRIX PXI DAQ HV Mobile Rack 2 HV Mobile Rack 1 E F C B A ARTC1 ARTC2 ARTB1 ARTB2 ARTA1 ARTA2 ARTF1 ARTF2 ARTE1 ARTE2 CU CFBC2 CBFC1 CFBB2 CFBB1 CFBA2 CFBA1 CFBF2 CBFF1 CFBE2 CFBE1 CTH HV1 HV2 SE-F SE-E SE-C SE-B SE-A