Six Sigma: Production & Operations Management July 26, 2005

Slides:



Advertisements
Similar presentations
What is Six Sigma?.
Advertisements

12–1. 12–2 Chapter Twelve Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Quality Management Awards and Framework ISO 9000: 2000 Malcolm Baldrige National Quality Award Deming Prize Six Sigma.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Control Charts for Attributes
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Principles of Six Sigma
Quality Management, Process Capability and Six Sigma MGMT 311
Six Sigma Dr. Ron Tibben-Lembke SCM 462 Dr. Ron Tibben-Lembke SCM 462.
Principles of Six Sigma
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
1 Chapter 10 Principles of Six Sigma. Key Idea Although we view quality improvement tools and techniques from the perspective of Six Sigma, it is important.
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
SIX SIGMA. What is six sigma? Sigma is a measure of “goodness: the capability of a process to produce perfect work. A “defect” is any mistake that results.
Product Lifecycle Management Cost of Quality Pasi Kaipainen, Mika Huhta.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Development of Six Sigma
Managing Project Quality
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Chapter 9 Quality Management – Focus on 6 Sigma
1 L U N D S U N I V E R S I T E T Projektledning och Projektmetodik, VBEF01 Kristian Widén Tekn. Doktor Avd. För Byggproduktion Inst. För Byggvetenskaper.
“Safety is a Measure of Success”
Quality Control Prof. R. S. Rengasamy Department of Textile Technolgoy
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Six-Sigma Quality Chapter 9.
Σ Six Sigma: Process Perfection Customer Satisfaction through Error Elimination.
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
What is six sigma -Six Sigma is a methodology that provides businesses with the tools to improve the capability of their business processes. This increase.
Six Sigma By: Jensen Agcaoili. What is Six Sigma? Six Sigma Definitions: A management driven, scientific methodology for product and process improvement.
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
6Sigma Chapter 3. Six Sigma Quality: DMAIC Cycle  Define, Measure, Analyze, Improve, and Control (DMAIC)  Developed by General Electric as a means of.
Quality Management.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
Quality and Productivity Management Deming, TQM, and 6 Sigma.
By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time.
How to Complement ISO 9001:2000 with Six Sigma. ISO 9001:2000 introduces a strong focus on measurement, analysis and improvement. This section will discuss.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 3 Roberta Russell.
Operations Fall 2015 Bruce Duggan Providence University College.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
UNIT 5.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
Six sigma Introduction Prepared & Presented By:-Six Sigma Team.
THE MANAGEMENT & CONTROL OF QUALITY, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma The Management & Control of Quality,
Product Lifecycle Management
What is Six Sigma?.
A Strategy for Achieving World Class Perfor-mance
Six Sigma.
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Six-Sigma : DMAIC Cycle & Application
Control Charts for Attributes
Six Sigma Approach.
Six Sigma.
What Is Six Sigma? Sigma is a letter in the Greek Alphabet
Quality Certification
Quality Management Six Sigma
6 Six Sigma Basics GEOP 4316.
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
QMS, ISO and Six Sigma It’s all related…..
Six Sigma Introduction 1 1.
Presentation transcript:

Six Sigma: Production & Operations Management July 26, 2005 Jonathan Butt Greg Cake Subir Roy July 26, 2005

What is Six Sigma? Statistically-based process improvement methodology which aims to reduce defects to a rate of 3.4 per million opportunities. This reduction is achieved by identifying & eliminating variation in process. Through defining “defects” the Six Sigma process focuses on customer requirements, and thus is very customer orientated. Fundamental methodology of Six Sigma is based on “DMAIC” an acronym: Define, Measure, Analyze, Improve, & Control. Six Sigma is not a quality management system, or quality certification system like ISO-9001. The focus on defects is shifted from checking products for defects to improving the process so that defects do not occur.

Key Concepts of Six Sigma At it’s core, Six Sigma revolves around a few key concepts: Critical to Quality (CTQ): The attributes most important to the customer. Defect: Failing to deliver what the customer wants. Process Capability: What your process can deliver. Variation: What the customer sees & feels. Stable Operations: Ensuring consistent, predictable processes to improve variation. Design for Six Sigma (DFSS): Designing to meet customer needs and process capability.

Origins of Six Sigma Credited to Bill Smith a reliability engineer at Motorola, who noted system failure rates were quite higher than predicted by final product testing. Smith blamed dramatic increases in system complexity & the resulting opportunities for failure as well as a fundamental flaw in traditional quality thinking. However many other quality “gurus” also made presentations to upper management at Motorola around the same time, and conflicting information arises about who actually developed this philosophy first.

Why Sigma? The concept of Six Sigma relates to the fundamental statistical concept of deviation, which is noted by the Greek letter sigma (σ). The deviation by which a product’s quality could fluctuate during production and still be of acceptable quality at the time was 3σ, or just over 66 000 defects per million (6.68%) At Motorola during this period the design margin for quality had been 4σ, which was considerably better at 0.621%. Sometime in 1986 Smith realized that actual quality figures at Motorola did not match the 4σ deviation for quality, and theorized that the real mean value could be differing by as much as 1.5σ because of increasing complexity in systems and the higher probability of one of these many components to be substandard.

Hospital: 5,000 incorrect surgical procedures per week. All these deviation values basically led to a goal of 6σ or 3.4 defects per million opportunities. With a four sigma standard for quality Hospital: 5,000 incorrect surgical procedures per week. Air travel: Two short or long landings at every major airport every day. Drug Prescriptions: 200 000 wrong prescriptions every year. Downtime: 54 hours of system downtime per year. Golf: One missed putt every nine rounds. Lets compare with six sigma quality standards Hospital: 1.7 incorrect surgical procedures per week. Air travel: a short or long landing at every major airport once every five years. Drug Prescriptions: 68 wrong prescriptions every year. Downtime: 2 minutes of system downtime per year. Golf: One missed putt every 163 years.

Because of this increased focus on reliability, Motorola received the Malcolm Baldrige Award shortly after the rollout of Six Sigma in 1988. Receiving this award required Motorola to share it’s methods with colleagues, and showed Motorola’s quality professionals how far ahead they were with respect to their competitors. At this point Mikel Harry developed the strategic vision for Six Sigma. His basic ideals were: A change in company focus towards preventing defects, not inspecting for them. Anchoring quality by dollars (increased spending). Finally seeking a whole business transformation. This vision included the description of difference competence levels in Six Sigma and based on the traditions of karate, were designated by belts: Green Belt Black Belt Master Black Belt

Six Sigma & Belts Developed as a core initiative of the Six Sigma program, the concept shows the skills and dedication to the methodology of quality, and is designed to instill pride in the six sigma workforce. The six sigma workforce is broken down into different organizational groups. Champion: These individuals are high-level executives with great understanding of the methodology and are committed to the success of the program. In all organizations the program will be led by a full time champion who uses six sigma in everyday work & communicates the merits of six sigma at every opportunity.

Sponsor: The owner of the process who helps to initiate and coordinate improvement activities in their area of responsibility. Master Black Belt: Highest level of technical & organizational proficiency. These individuals provide technical leadership to the program, as well as provide most of the training. Because of this communications & teaching skills are as important as technical competence. Black Belt: A technically minded individual with a strong background in college level mathematics & statistics. The Black Belt provides much of the quantitative analysis involved in the daily six sigma project. Green Belt: Six Sigma project leader, capable of facilitating six sigma teams & projects from conception to completion. Training for green belts in much less than Black, with emphasis on project management, and quality control. These individuals are not employed full time on six sigma projects. A mature six sigma program has around 1 Master Black Belt for every 1000 employees, a Black Belt completes from 5 to 7 projects a year.

Themes In order for a company to be successful in Six Sigma development the following “themes” must become second nature: Continuous focus on customer requirements. Use of measurements & statistics to identify and measure variation in the process of interest. Identifying root causes of problems. Process improvements to remove variation and thus lower defects. Pro-active management focusing on problem prevention, continuous improvement & ever constant strive for perfection. Cross-functional collaboration within the organization. Setting very high goals.

Company Size and Percentages with Six Sigma Who uses Six Sigma? Surveys undertaken in the US in the first half of this decade by a number of firms show larger use of six sigma than one might imagine. Also, company size is not a determining factor in six sigma use. The highest percentage of survey’d respondents with six sigma programs in use, were those with 1000 or less employees Company Size and Percentages with Six Sigma Note: QD – Quality Digest Magazine, The Dyncorp percentages do not add to 100 because all respondents were used in tabulating results, QD numbers are only respondents who have a six sigma program in place. QD refers to the number of employees as all persons in the employ of the company, Dyncorp does not specify how the number of employee values were determined. # Employees QD Dyncorp 0 - 1000 19.4% 32.6% 1001 - 5000 23.7% 20.5% 5001 - 10 000 9.9% 6.3% 10 001 - 20 000 7.9% 7.6% > 20 000 39.3% 24.1%

Length of Time Six Sigma Has Been in Place Along with the wide variety in the size of companies with six sigma programs, there are also many companies who have been on board the six sigma philosophy for a number of years. Length of Time Six Sigma Has Been in Place Note: QD – Quality Digest. QD numbers total 100%, The Dyncorp percentages do not add to 100 because all respondents were used in tabulating results, QD numbers are only respondents who have a six sigma program in place. Number of Years QD% Dyncorp% 2003 2002 0-1 21.3% 30.4% 21.0% 1-2 28.0% 31.9% 35.3% 2-3 23.2% 17.4% 13.4% 3-4 10.9% 7.3% 7.1% 4-5 6.4% 2.9% 3.3% 5-10 7.2% 5+ 10.1% 10.2% 10.3% 10-15 1.1%   15+ 1.9%

While six sigma is most commonly used in manufacturing processes, the same methodology can be used to improve other business processes. It can be used to: Identify ways to increase production capacities in equipment. Improve on time delivery. Reduce cycle time for hiring & training new employees. Reduce quality or delivery problems with suppliers. Improve logistics. Improve quality of customer service. Almost 50% of all American manufacturing companies have a six sigma program in place, while just under 40% of service companies have implemented a program. Also, within a business different functional groups also use six sigma, the following chart shows results from the same Quality Digest survey

Manufacturing 15.64% Plant Operations 10.74% Engineering 10.50% Customer Service 9.36% Test/Inspection 9.06% Administration 9.03% Purchasing 7.70% Shipping Receiving 7.22% Sales 6.23% R&D 5.81% Document Control 5.72% Pollution Prevention 3.01%

Why use Six Sigma? Since the Six Sigma philosophy focuses on defects, it would be obvious that it can reduce production times, but six sigma can be used for much more Through reduction in defects, a six sigma program can reduce overhead costs. Since nearly every product produced is of prescribed quality, inventories can be reduced. WIP and cycle times can be reduced. Managers are freed from the process. With vastly improved product quality managers no longer have to spend time “problem solving” Six Sigma will increase customer satisfaction, less defects means more people who get what they wanted the first time. Six Sigma companies have shown greater ease of expansion. Because of the emphasis placed on quality and the problem solving skills required to achieve that quality, these companies recover from the initial setbacks of a new process quicker.

Six Sigma transforms the way a company thinks and works on major business issues - Process design: Designed to have the best and most consistent outcome from the beginning. - Analysis & reasoning: Using facts to find root cause, instead of educated guesses & intuition. - Focus on process improvement as a key to excellence in quality. - Broader participation in problem solving. - Goal setting: aiming at stretch goals, not “good enough” targets. This ensures the company is always striving for improvement. - Suppliers are no longer evaluated on cost, instead evaluated on relative capability to consistently provide quality materials with short lead times.

DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools are employed to turn a practical problem into a statistical problem, then generate a statistical solution and turn it back into a practical solution. Each letter represents a phase in six sigma implementation, from the initial project design to ensuring the benefits gained using this system stay implemented. The DMAIC roadmap is usually implemented for a process that is underperforming, not a process in the design stage.

D: Define The purpose of the define phase is to clearly identify the problem, the requirements of the project, or it’s objectives. These should be critical issues and aligned with the company business strategy, and the customer requirements. This phase includes: Development of defect definitions Development of a team charter and a champion Estimate the financial impact of the project Senior management approval

Key Questions for the Define phase What matters to the customer? What defect are we trying to reduce? By how much? By when? How much are defects costing right now? Who will be in the project team? Who is going to support this project implementation? At this point in implementation, visual charts (pareto, trend, process flow,) are useful to see the development of defects.

M: Measure The purpose of the measure phase is to fully understand the process and it’s current performance by identifying how to best measure performance. These measurements must be realistic as well as useful, in order to provide help in reducing defects. This phase includes Identifying specific performance requirements of relevant critical-to-quality (CTQ) characteristics Mapping of relevant processes, with all inputs that effect a particular output identified. Analyze measurement system capability & establish relevant baseline for process capacity Collect data (ensuring opportunities for error are evaluated) Verify the problem actually exists

Key Questions for the Measure phase What is the process? How does it function? Which outputs effect CTQ the most? Which inputs effect outputs the most? Is the ability to measure/detect sufficient? How is the current process performing? What is the “best” the process was designed to do? At this point fishbone diagrams, process mapping and cause and effect analysis are useful tools.

A: Analyze In the analyze phase, the information collected in the measure phase is analyzed. Hypotheses on root cause of variations in measured values are developed. Statistical analysis is undertaken to validate these hypotheses. This phase includes: Generation of hypotheses about possible root causes of variation & potential critical inputs. Identify the vital root causes and critical inputs that have the most significant impact. Validate these hypotheses by performing multivariable statistical analysis.

Key Questions for the Analyze phase Which inputs actually affect CTQ’s most (based on actual data)? By how much? Do combinations of variables affect inputs? If an input is changed, does the output really change in the desired way? How many observations are required to draw conclusions? What is the level of confidence? At this point in the process, statistical analysis, as well as the “five why’s” are useful tools.

I: Improve The improve phase focuses on developing ideas to remove root causes of variation, testing & standardizing these solutions. This phase includes: Identifying ways of removing causes of variation. Verify critical inputs. Discover relationships between variables. Establish operating tolerances which are upper and lower specifications. of the process, and if followed precisely will ensure “defect free” products. Optimize critical inputs or reconfigure the current process.

Key Questions for the Improve phase Once it is known which inputs affect the outputs most, how can they be controlled? How many trials do we need to ensure optimal settings have been achieved? Should the old process be improved, or should a new process be designed? By how much has the defects per million opportunities decreased? The most applicable tool at this phase is process mapping to show new & improved processes.

C: Control The control phase aims to establish standard measures to maintain performance & to correct problems as needed, including those with the measurement system. This phase includes: The validation of measuring systems. Validation of long term capability. Implementation of process control with a plan to ensure problems don’t reoccur.

Key Questions for the Control phase Once defects have been reduced, how to ensure the improvement is sustained? What systems need to be in place to check that the improved procedures stay implemented? How can these improvements be shared with the rest of the company? During the control phase, a standardized set of documents for procedures, as well as a means to record data and check it against historical values are important tools.

So you want to implement Six Sigma? Although the results of a six sigma project are highly desirable by most companies, the implementation process must be carefully considered. Six Sigma is a long term commitment, and will not produce results overnight. To build six sigma capacity requires the following steps: Discover: recognize the need for six sigma & explore the impact it may have on the company. Decide: management approves the initiative, then defines purpose & scope. Initialize: create detailed deployment plans for numbers of Black Belts, as well as other human resources needed, training requirements, proposals for 6σ projects and the financial impact of each. Deploy: train project Champions & Black Belts. Meanwhile select and implement improvement projects: Sustain: train 6σ Green Belts & process improvement team leaders to speed up improvements & maintain acheivements.

Factors Critical to Six Sigma Success Senior management must be committed: without this six sigma projects are doomed to failure. GE’s success with the program is due to the role Jack Welch (former CEO) played in advocating the program and integrating it into the core of business strategy at GE. Training the right people: The methods of analysis often used for six sigma projects are technical by nature, and training programs focused on analytical problem solving skills as well as leadership are critical to initial momentum. People selected for a six sigma initiative should be motivated by compensation, rewards, recognition & promotion. Selecting the right project: Initial six sigma projects should be focused on key problem areas with impact to critical aspects of business success. Not all business problems need a six sigma solution.