In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Downtown Access Improvements Plan Town of Hillsborough 2014.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
MD 180 (Jefferson Pike) Community Safety and Enhancement Project Public Meeting December 11, 2013 Huqin (Aimee) Zhang
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Trail Funding Sources & General Information
Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
STA Safety Project PID #76439 December 12, 2006.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
ADA Compliance in Maryland AASHTO Subcommittee on Design July 2008 By: Kirk McClelland, P.E. Maryland SHA.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
City of Prairie Village 75 th Street Mission Road to State Line Road.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Improvements to Stockton Street
Scranton/Carter Road Reconstruction
32 Transportation Midway City 2016 General Plan
Hesperian Boulevard Corridor Improvement Project San Lorenzo
District 3 Complete Streets Projects
Transportation Alternatives (TA) Set-aside
Construction Management & Inspection
Highway 169 Bridge Replacement & Pavement Resurfacing
Early Voting Starts Oct. 20 | Election Day Nov
SE 12th Street Roadway Improvements February 8, 2005.
Geometric Design: General Concept CE331 Transportation Engineering.
Walker Street Reconstruction Project 25% Design Public Hearing
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
ODOT’s Responsibilities under the Americans with Disabilities Act
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule

Project Location MD 30 BUS from south of North Woods Trail to the CSX Railroad north of Hampstead.

Project Overview MD 30 Business is an undivided, two-lane urban minor arterial. Existing roadway has ft. lanes with parking lanes or shoulders. Speed limit is 30 mph.

Project Overview (continued) Rehabilitate the roadway Provide Americans With Disabilities Act (ADA) compliant sidewalks and sidewalk ramps Improve curb and gutter, driveway entrances, crosswalks, and pedestrian signals Address drainage concerns, upgrade drainage system, and provide new storm water management facilities

Project Overview (continued) Modify traffic signals and improve traffic markings and signage Pedestrian lighting Landscaping and aesthetics improvements Relocate utilities (BGE, Verizon, Comcast) Minimize adverse impacts to environment; environmental enhancements

MD 30 Business Main Street Corridor Typical Sections

Plans Overview

Plans Overview (continued)

Elements of Design Pedestrian Improvements Intersection and Roadway Improvements Drainage Landscaping and Aesthetic Improvements

P edestrian Safety and Connectivity Sidewalk Connectivity ADA Compliance Sidewalk Maintenance

Key Issues - Pervious Concrete Sidewalk Locations Function Maintenance

Elements of Design - Pedestrian Improvements ADA Compliant Sidewalk Sidewalk Ramps Driveway Apron Crossings Pedestrian Signal Proper Pedestrian Signage

Elements of Design - Pedestrian Improvements (cont’d) High Visibility Crosswalks Entrance-way Consolidation (where feasible) Pedestrian Refuge Areas

Elements of Design - Intersection and Roadway Improvements Signal timing Pedestrian Signals Signage Resurfacing Restriping

Elements of Design - Drainage New Curb & Gutter Upgrade Drainage System Storm Water Management Facilities

Elements of Design - Landscaping and Aesthetic Improvements Landscaping Potential Retaining Wall Aesthetics

Project Funding & Schedule Funding Project is fully funded for Preliminary Engineering and Construction Schedule Town’s waterline project to Advertise spring 2015, to be completed by spring 2016 Design Completion - Fall 2015 Construction – NTP Spring 2016 (SHA will hold another meeting regarding construction activities prior to Notice To Proceed) Construction completion – approximately 3 years