GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
30 June 2005 FSW Status Review 1 GLAST Large Area Telescope Instrument Flight Software LAT Monthly June 30, 2005 Terry Schalk U. C. Santa Cruz Gamma-ray.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status August 1, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST Large Area Telescope Engineering Meeting 23 November 2004 Charge Injection Calibration James Swain Stanford Linear Accelerator Center
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Primary Boot Code (PBC) D. Wood Naval Research Laboratory.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration James Swain Stanford Linear.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 4 of 12 Flight Software 1 GLAST Large Area Telescope LAT Pre-Shipment Review Flight.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Secondary Boot Code (SBC) D.Wood Naval Research Laboratory.
GLAST Large Area Telescope Instrument Flight Software Jeff Fisher, FSW Manager Flight Unit Peer Review Overview/Management/Schedule September 16, 2004.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
Electrical Ground Support Equipment Verification Test Support
EPU load – same as SIU load except…
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

September 16, 2005 FSW System Checkout TRR: Current Status 2 Current Status RFAs Development status Open JIRA Items Test Environment (NCR) Procedure/Script Status (dry runs)

September 16, 2005 FSW System Checkout TRR: Current Status 3 RFA Status 6 Flight Unit Peer Review RFAs –Closed: 1 –Responses submitted and awaiting closure: 5 Action Plan –Ensure all RFAs closed prior to FSW System Test TRR

September 16, 2005 FSW System Checkout TRR: Current Status 4 Development Status Current status –Known liens Implementation of output to the Science Data Interface Command/control/telemetry/mode interface to event data (LPA) Action plan –Build will include event filtering plus implementation of subset of output across SDI to enable completion of a subset of test scripts –Subsequent build will provide all remaining functions

September 16, 2005 FSW System Checkout TRR: Current Status 5 FSW in QT Build LayerFSW Packages in QT Build Basic ServicesATTCMXCCSDS CDM LEM EFCEMPIMM LATC MEM MONMSGPBC PBI PBSMDB PIGRAD750 SBC SIB THS VXW ZLIB DriverCTDBLCBD ServicesITCLCS CTSEDS ApplicationsLFS/FILELHKLCILCMLIM LMCLSMLTCLPA Software Config Files (CDM) CAL_DBCPU_DBCTS_DB FILE_DBLCI_DBLCM_DB LCS_DBLHK_DBLIM_DB LSM_DBLTC_DBMEM_DB MON_DBMSG_DBPBC_DB PIG_DB

September 16, 2005 FSW System Checkout TRR: Current Status 6 Open JIRA Items

September 16, 2005 FSW System Checkout TRR: Current Status 7 Open JIRA Items (2)

September 16, 2005 FSW System Checkout TRR: Current Status 8 Open JIRA Items (3)

September 16, 2005 FSW System Checkout TRR: Current Status 9 Test Environment Status Current status –VSC science data decoder SW Action plan –Complete ASAP

September 16, 2005 FSW System Checkout TRR: Current Status 10 Procedure/Script Status All test procedure documents baselined: –Most likely need update depending on status Test script development nearing completion: –Many scripts have been run to completion and are ready for QT –Some scripts have related FSW liens, but will be ready for QT once the liens are satisfied TestScript StatusFSW Liens Primary boot (nominal) FSWINI_001: SIU primary bootSuccessfully Run to Completion N/A FSWINI_009: boot status on discretes, boot HSK Does Not Yet Run to Completion N/A FSWINI_005: EPU prim. BootSuccessfully Run to Completion N/A CMDFNC_001: soft reset commandSuccessfully Run to Completion N/A

September 16, 2005 FSW System Checkout TRR: Current Status 11 Script Status (2) TestScript StatusFSW Liens Secondary boot (nominal) FSWINI_010: SIU and EPU secondary bootDoes Not Yet Run to Completion N/A NBTLMV_001: HSK, low rate science tlmDoes Not Yet Run to Completion JIRA FSW-168 Configuration (nominal) SIUCFG_001: LAT subsystem data collection Runs to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path SIUCFG_002: LAT subsystem configurationRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path FILMGT_001: File managementDoes Not Yet Run to Completion JIRA FSW-114 Mode Control OPMODE_001: Mode controlRuns to Completion (Need to Incorporate Development Liens) VSC science data processing

September 16, 2005 FSW System Checkout TRR: Current Status 12 Script Status (3) TestScript StatusFSW Liens Charge Injection FECALB_001: TOT measurementsRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path JIRA FSW-232 FECALB_002: TKR threshold & charge scansRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path JIRA FSW-232 FECALB_003: TKR trigger checkRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path JIRA FSW-232 FECALB_004: ACD calibrationRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path JIRA FSW-232 FECALB_005: CAL calibrationRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path JIRA FSW-232

September 16, 2005 FSW System Checkout TRR: Current Status 13 Script Status (4) TestScript StatusFSW Liens Diagnostic Functions DCMODE_001, 002, 003 (ACD, CAL, and TKR diagnostics) Run to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path EVTPMO_001: DeadtimeRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path EVTPMO_002: GEM VETO ratesRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path EVTPMO_003: L1 Trigger RatesRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path EVTPMO_004: Monitor CNO RatesRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path

September 16, 2005 FSW System Checkout TRR: Current Status 14 Script Status (5) TestScript StatusFSW Liens Filter EVTFIL_001: Interface from EBMRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path EVTFIL_002: Rates and capacityRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path EVTFIL_003: Filter reprogramRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path EVTFIL_004: Filter bypassRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path WBTLMV_001: Sci. data format and volume Runs to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output path

September 16, 2005 FSW System Checkout TRR: Current Status 15 Script Status (6) TestScript StatusFSW Liens Primary boot (non-nominal) FSWINI_002: Boot self-test FSWINI_003: Multiple boot images FSWINI_004: Reboot on discrete signal Do Not Yet Run to Completion N/A FSWINI_007: Retrieve SIU primary boot error log FSWINI_006: Reset source Successfully Run to Completion N/A FSWINI_008: Retrieve EPU primary boot error log Does Not Yet Run to Completion N/A FSWINI_012: SEU protection FSWINI_013: Memory scrubbing FSWINI_014: Watchdog management Do Not Yet Run to Completion N/A

September 16, 2005 FSW System Checkout TRR: Current Status 16 Script Status (7) TestScript StatusFSW Liens Secondary boot (non-nominal) FSWINI_011: SIU and EPU secondary boot error mitigation Does Not Yet Run to Completion N/A CMDFNC_003: 1553 interface and command functional verification Does Not Yet Run to Completion N/A Configuration (non-nominal) MEMMGT_001: Memory managementSuccessfully Run to Completion JIRA FSW-108 MEMMGT_002: Memory load dataDoes Not Yet Run to Completion N/A Other non-nominal NBTLMV_003: ACD HSK AnomalyDoes Not Yet Run to Completion N/A TIMPRC_001: Time servicesRuns to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output Magic 7 in SSR telemetry JIRA FSW-217, 163

September 16, 2005 FSW System Checkout TRR: Current Status 17 Script Status (8) TestScript StatusFSW Liens Interface Formats NBTLMV_002: Diagnostic telemetrySuccessfully Run to Completion N/A IPCFNC_001: Inter-processor communications Runs to Completion (Need to Incorporate Development Liens) VSC science data processing Science data formatting SSR output Magic 7 in SSR telmetry JIRA FSW-163 VSGIFV_001: Discrete signal interfacesDoes Not Yet Run to Completion N/A Thermal Control THRMCS_001: Thermal control systemDoes Not Yet Run to Completion JIRA FSW-215 JIRA FSW-216 JIRA FSW-167