Linac 4 PSB BI LTB LT L4T 177.31 m from PIMS to foil: 69.83 m new line (to BHZ20) + 107.48 m present Linac2 line Active elements : 4+2bendings; 16+18 quads,

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Machine operator priorities for Linac 2 and 3 G Bellodi, BE-ABP-HSL G Bellodi, BI- BOSS-2 meeting, 10 June 2015.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
1 1. Some recent views ( ) 2 Linac tunnel
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
LINAC4 transfer line – optics M. Eshraqi, L. Hein, A. Lombardi (BE-ABP) LINAC4 transfer lines : m (from PIMS out to foil); m new line,then.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
ELENA installation progress F. Butin / ELENA collaboration.
Wim Weterings Remy Noulibos
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
Experience with beam instrumentation at Linac4
SLHC –PP WP6 LHC IR Upgrade - Phase I.
ELENA installation and commissioning status
BE-BI Software for LINAC4
Status of the BI Work Package in the LIU-PSB frame
WPs concerned by L4 connection:
Update on the PSB Transfer Lines
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
Elettra – Sincrotrone Trieste S.C.p.A.
Two-beam Test-stand Design and Construction Status
ThomX – Commissioning Meeting – 25/01/2018
East Hall under construction
SPS Injection BIS - Draft requirements
Presentation transcript:

Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads, steerers, 1 RF cavity

Coordination teams 14/10/2010J.Coupard2 EN/MEF-LPC J.Coupard EN/MEF-ABA N.Gilbert BE/ABP-HSL R.Scrivens Linac4 LTB PS Booster Linac2 LTP 4 access zones (Linac4, Linac2, inflector, PSB)

Coordination teams buildings 400 and 410 (till the wall at the end of transfert tunnel Transfert line) EN/MEF-LPC Julie Coupard Serge Grillot Building 363, LTP and LTB line BE/ABP-HSL Richard Scrivens Cristiano Mastrostefano 14/10/2010J.Coupard3

present limit

PRESENT LIMITS OF TRANSFER LINE LINAC4/PSB: -Beam optics: to stripper foil (AL) -Installation, coordination: to PSB wall No reason to have a common boundary at the distributor flange: 1. zoning (common line would extend over 2 access zones). 2. coordination responsibility. 3. control system and naming (existing limit LTB/BI). 4. elements bw. present boundary and distributor are used by the PSB operators for matching to PSB and alignment on distributor. In any case, linac beam optics goes further than the distributor…

Measure ment lines LBE, LBS LBE: – Layout fixed. Compatible with ion operation. – Laser scanning done to prepare an integration drawing. – Equipment specifications provided; EDMS document released. Still to be done before installation: – Final screen and camera design (same as for Linac4 dump line), equipment and support drawings and layout. – Add water-cooling to quadrupoles, exchange power converters – Move steerer dipole. – Dump design. – Beam pipes. LBS: – Layout proposed, compatible with ion operation. To be adapted in case slit dimensions and equipment positions (dump!) change. – Equipment specifications partially provided (depend on final layout); EDMS document on beam dump specifications has been released, slit specifications under approval. – Laser scanning done to prepare an integration drawing. Still to be done before installation: – Propose slit and dump designs, check compatibility with RP restrictions. – Finalize SEM grid and spectrometer magnet specifications. – Integration drawings needed in addition to layout drawings. – Prepare software application. – Solve problem of lifting existing/new equipment over BI line.

Responsibilities Coordination of installation: ok (J. Coupard, R. Scrivens/C. Mastrostefano) Layout to be frozen beginning 2011 General coordination (beam parameters, consistency, progress): C. Carli (was S. Maury) Beam optics: A. Lombardi Measurement lines: B. Mikulec (Th. Hermann) Magnets: Th. Zickler Power supplies: D. Nisbet Vacuum: G. Vandoni Diagnostics: U. Raich Question of the Pakistani contribution: design will be integrated with design office, but who will supervise the (potential) construction?

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury10 L4 Project meeting The LINAC4 machine and the PSB had their own review several years ago. The part between LINAC4 and the PSB was never reviewed. During the construction of the LINAC4 building a new LINAC2 building wall has been discovered with a direct impact on the position of quadrupoles and instrumentation of the transfer line. A designer to start working at the beginning of 2011 is strongly desired in order to be ready for installation at the end of C. Carli has kindly accepted to take the responsibility of the transfer line as from January

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury11 Conclusion1 The coordination/installation teams have been precise for each different sector of the LINAC4 project : EN/MEF-LPC takes the responsibility of the coordination and installation inside the new Linac4 building, the new transfer line until BHZ20 in the LINAC2 building. BE/ABP-HSL takes the responsibility of the in-situ coordination and installation or modification between BHZ20 and the PSB separation wall with the general coordination under EN/MEF-LPC responsibility. EN/MEF-ABA takes the responsibility of the coordination and installation or modification of the PSB machine after the separation wall.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury12 Conclusion2 The positions of the Pick-Ups and the BCT, before BHZ20, should be redefined. 3D scans between Linac2 and PSB are vital to provide accurate and complete view of the environment. All the drawings released for production should be completed by the end of 2012, the requests have to be addressed to the design office by the end of For all the different parts of the transfer line (L4T, LT, LTB, BI, LBE/LBS, PSB injection), an exhaustive list of the equipments, their responsible person, the deliverables and deadline should be built as soon as possible.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury13 Conclusion3 Up to now there is no technical show-stoppers or specific difficulties of the design of the transfer line magnet. 3D CAD model and 2D specification drawings and design for magnets will be complete by April 2011 (but needed now to make a hole in L2 Building?). – The collaboration with Pakistan will be reactivated in order to start the drawings under MME supervision in April Some clarifications on dump and slit design and position are still needed in order to finalize the design and the integration of the LBS line. There is a lift problem for the installation of the LBS line, a visit of the zone is organized.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury14 Conclusion4 Procurement of flanges, bellows and raw pipes, as well as the definition of apertures, instrumentation interfaces and magnet chamber shape should be done as soon as possible. 18 powering solutions should be defined (waiting for magnet parameters) and resources allocated. A proposal for the racks installation in is still need to be confirmed. Integration studies are required for BS[1,2,3,4] the 4 bending magnets around the stripper foil chicane.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury15 Conclusion5 A strategy needs to be defined for the production of the supports and vacuum chamber in Pakistan: Pakistan+MME should complete the drawings by the end of 2011 Construction should proceed in 2012 with delivery in dec/2012 If not, CERN WS in 01/2013 The project management should confirm beam loss assumptions taken into account in the design. The radiological aspects of the H0/H- dump for the PSB should be studied. Important to have all the RP information as soon as possible.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury16 Schedule The new installation planning has been presented. In order to avoid any interference with the LINAC2 runs, some shutdown periods have been indentified for possible installation. The modification in the existing transfer line and the upgrade of the PSB are depending of the General Schedule and will be precise at the next LHC workshop in January For the moment, the earliest date for transfer line readiness is beginning of The coordination teams have been precise for each different sector of the LINAC4 project : EN/MEF-LPC takes the responsibility of the coordination and installation inside the new Linac4 building, the new transfer line until BHZ20 in the LINAC2 building. BE/ABP-HSL takes the responsibility of the in situ coordination and installation or modification between BHZ20 and the PSB separation wall and the general coordination is under the responsibility of EN/MEF-LPC. EN/MEF-ABA takes the responsibility of the coordination and installation or modification of the PSB machine after the separation wall.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury17 Optics The new Linac4 transfer line optics has been presented: two quadrupoles doublets were replaced by a triplet and the buncher cavity was moved downstream. The bottlenecks of the line are the distributor, RF cavity and the septum magnet. The new transfer line will be send for the integration. The static alignment errors can be corrected with the steerers and the jitter in the bending power supplies should be below 10-4.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury18 Integration All the positions of equipments are now defined. The LTP, LTB and LBI lines will be modified and some elements will be inserted. Only 2D AUTOCAD drawings are available for these lines. Some 3D scans are performed to provide accurate and complete view of the environment. The positions of the Pick-Ups and the BCT, before BHZ20, should be redefined. As the energy of the beam is different of the present Linac2, a decision about the removal of the C-collimators installed in the present transfer line should be taken soon (next BCC meeting).

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury19 For all the different parts of the transfer line (L4T, LT, LTB, BI, LBE/LBS, PSB injection), an exhaustive list of the equipments, their responsible person, the deliverables and deadline should be built as soon as possible. As all the drawings released for production should be completed by the end of 2012, the requests have to be addressed to the design office by the end of It has been underlined that Design Office is not simply a drawing office and all drafting of mechanical designs not under Design Office responsibility will be carried out by sub-contractors following a procedure. It has been reminded that the Design Office will be overloaded during the next years 2011 to Design Office Plans

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury20 Magnet Status For the new part of the transfer line, 5 bendings, 20 quadrupoles and 6 steering magnets are required. Detailed parameters list exists for all the magnets. The 2D design for dipole and quadrupoles is available. The 3D magnetic design of the dipoles will be finished by the end of D CAD model and 2D specification drawings for dipole will be complete by April In parallel, the 3D magnetic design of quadrupoles and correctors are prepared. The tendering procedure will start in June Up to now there is no technical show-stoppers or specific difficulties of the design of the transfer line magnet. – All the supports and vacuum chambers of the transfer line will be designed and produced within the Pakistanese in-kind contribution. A provisional budget was allocated to face any major issue. The collaboration will be reactivated in order to start the drawings under MME supervision in April 2011.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury21 Measurements and dump lines – The design of the Linac4 dump line and LBE line are complete. – Some clarifications on dump and slit design and position are still needed in order to finalize the design of the LBS line. – An integration study is needed once the slit and spectrometer magnet design will have been finished. – Specifications have been provided for the three dumps, the slit, quadrupoles and the emittance measurement screens. SEM grid and spectrometer magnet specifications need finalization once all equipment positions in the LBS line will be fixed. – There is a lift problem for the installation of the LBS line, a visit of the zone is organized.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury22 Power converters – There are 130 power converters circuits between Linac4 and PS Booster (more than 50% will be installed or modified for Linac4 operation). – 18 powering solutions are not yet defined (waiting for magnet parameters) and resources have not been yet allocated. – A proposal for the racks installation in is still need to be confirmed. – Integration studies are required for BS[1,2,3,4] the 4 bending magnets around the stripper foil chicane. 22

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury23 Status of vacuum A draft layout for the vacuum in the L4T line already exists. Still need to define the exact position of every vacuum objects with the integration team. Procurement of flanges, bellows and raw pipes, as well as the definition of apertures, instrumentation interfaces and magnet chamber shape should be done as soon as possible. A strategy needs to be defined for the production of the vacuum chamber in Pakistan.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury24 Status of beam Instrumentation A list of the available diagnostics in the transfer line has been presented. The BCTs will be identical to the one used in Linac4 and the new electronics will be tested at the 3 MeV test stand. According to energy deposition simulation, SEMGrids will be built with carbon wires. The BSM (Feschenko) construction is almost finished.

L4 meeting 11 Nov 2010Conclusion of the L4T Review/ S. Maury25 Radio protection – The higher part of the transfer tunnel will be classified as a supervised radiation area during LINAC2 operation. – Temporary shielding on the LINAC2 side has to remain in place. The shielding requirements in the LINAC2-4 area for Linac4 operation will be specified by RP (end of 2010). – The project management should confirm beam loss assumptions taken into account in the design. The radiological aspects of the H0/H- dump for the PSB should be studied.