1 AIA Update on Integrated Project Delivery Lean Construction Institute Design Forum January 8 2009 Markku Allison, AIA.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

Overview How the change is implemented is critical for the successful adoption of new information resources Review several models and concepts for managing.
Life Science Services and Solutions
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2014 NASBP.
Global Congress Global Leadership Vision for Project Management.
Twelve Cs for Team Building
The HR Paradigm Shift Discover Stakeholder Value for the Human Resources Function.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
GHULAM DASTGIR KHAN LAND ACQUISITION AND SOCIAL IMPACTS ANALYST NATIONAL AND REGIONAL RESOURCE CORRIDORS PROGRAM SECRETARIAT MINISTRY OF MINES GHULAM DASTGIR.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Strategies for Managing Change - regarding the adoption/use of R4L Resources.
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
By Saurabh Sardesai October 2014.
Purpose of the Standards
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
Outsourcing: Managing Interorganizational Relations CHAPTER TWELVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
The BIM Project Execution Planning Procedure
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Introduction to Interactive Media 02. The Interactive Media Development Process.
Company Confidential 1 © 2007 Nokia Nokia/AOG Industry Collaboration in the ICT sector Abi Oxley Green January 28th.
Managing Fast – Tracked Projects: A Review of ECI Report Dr
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Andrew Studd Charity and Social Business Team Russell-Cooke LLP 12 July 2013 Funding Fair 2013 Joint Ventures, Collaborations and Mergers.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Industrial Engineering Roles In Industry
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Introduction to Interactive Media The Interactive Media Development Process.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Joint Venture in construction company in West Bank.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
What A written document that describes all the steps necessary for opening and operating a successful business. You plan should provide the following:
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
Cx Process in the Eyes of an Architect AABC Commissioning Group Michael Chelednik, AIA, CxA.
INSTRUCTOR'S MANUAL Chapter 3 ESTABLISHING A BUSINESS.
Job Analysis - Competency Modeling MANA 5322 Dr. Jeanne Michalski
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Working in Partnership
Improved Project Outcomes through Collaboration and Technology Charles Hardy, CCM Deputy Director, GSA PBS Great Lakes Region - Office of Property Development.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Managing for results Day 9 Module: Management.
Collaboration in Contracting Teresa Magnus Vulcan Insulation Co.
Chapter 8 - Integrative Process
Association of Enterprise Architects International Committee on Enterprise Architecture Standards Jan 23, Collaborative Expedition Workshop #57aeajournal.org.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Session 2: Developing a Comprehensive M&E Work Plan.
STEVE OGLESBEE, DREW WALKER, ALAN WONG SAN FRANCISCO WAR MEMORIAL.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
BEST East – Introduction Developing the capability to deliver more with less Neil Jarrett CWC.
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
BIM & IPD This PPT is about Building Information Modeling (BIM) and
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
PROJECT DELIVERY METHODS
PROJECT MANAGEMENT 2 Chu Eu Ho
© LEAN CONSTRUCTION INSTITUTE
Vision Facilitation Template
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Presentation transcript:

1 AIA Update on Integrated Project Delivery Lean Construction Institute Design Forum January Markku Allison, AIA

2 position statement | 2007

3 Position No. 26: Project Delivery The AIA believes that every project delivery process must address the quality, cost-effectiveness, and sustainability of our built environment. This can best be effected through industry-wide adoption of an integrated approach to project delivery methodologies characterized by early involvement of owners, designers, constructors, fabricators and end user/operators in an environment of effective collaboration and open information sharing. The AIA also believes that an architect is well qualified to serve as a leader on integrated project delivery teams. The AIA further believes that evolving project delivery processes require integration of education and practice in design and construction, both within and across disciplines.

4 Ramifications Applies to all projects Integrated, collaborative models are best Early involvement is important Open information sharing is important Design and construction education integration should happen Leadership may involve more than just the architect

5 sea change for the Institute

6 integrated project delivery guide |

7 ipdg | key ideas Principles of Integrated Project Delivery (general) Mutual Respect and Trust Mutual Benefit and Reward Collaborative Innovation and Decision Making Early Involvement of Key Participants Early Goal Definition Intensified Planning Open Communication Appropriate Technology Organization and Leadership

8 ipdg | key ideas

9 IPD principles can be applied to a variety of contractual arrangements

10 market interest ( ) Owner Designer Constructor Subcontractor Engineer Systems Supplier Attorney Insurer Student Educator None of the Above GRAND TOTAL % 44% 11% 2% 8% 2% 3% 1% 3% 11% 100%

11 research

12 Nearly 80% of respondents indicate they are aware of IPD; about half of respondents view themselves as knowledgeable or experienced. Confidential Base: Total Respondents n=2051

13 Based on the definition, reduction of conflict is the IPD attribute of greatest value to project teams. Confidential Base: Total Respondents n=2051

14 Based upon the definition, early involvement of key participants is the most important principle of IPD. Confidential Base: Total Respondents n=2051

15 Of the potential barriers provided to respondents, lack of legal precedent and industry partner skill sets are the greatest barriers to pursuing IPD. Confidential Base: Knowledgeable/Experienced with IPD n=1074

16 Lack of trust, lack of skills, lack of information about process and lack of appropriate technology are not significant barriers for most segments. Confidential Owner (n=137) Architect (n=708) Engineer (n=60) Contractor (n=137) Sub- contractor (n=32)* Know- ledgeable (n=583) Experienced (n=480) Lack of Legal Precedent61%67%57%52%53%76%47% Industry Partner Support Not There47%58%63%52%59%62%48% Lack of Insurance46%57%45%39%53%62%41% Procurement Constraints/Limitations56%54%43%48%44%58%45% Industry Partner Skill Sets53%64%67%50%63%67%53% Uncertainty About Risk48%59%53%39%38%67%39% Uncertainty about Compensation Structure 47%56%60%38%31%65%37% Lack of Trust in Industry Partners38%36%33%24%26%38%30% Lack of Necessary Skills34%25%24%10%22%29%18% Lack of Info About Process29%28%20%25%36%32%22% Lack Appropriate Technology34%21%18%13%22%26%17%  Owners are the least likely to believe that lack of support by the industry is a barrier to IPD. The remaining segments view it as a barrier.

17 Lack of trust, lack of skills, lack of information about process and lack of appropriate technology are not significant barriers for most segments. Confidential Owner (n=137) Architect (n=708) Engineer (n=60) Contractor (n=137) Sub- contractor (n=32)* Know- ledgeable (n=583) Experienced (n=480) Lack of Legal Precedent61%67%57%52%53%76%47% Industry Partner Support Not There47%58%63%52%59%62%48% Lack of Insurance46%57%45%39%53%62%41% Procurement Constraints/Limitations56%54%43%48%44%58%45% Industry Partner Skill Sets53%64%67%50%63%67%53% Uncertainty About Risk48%59%53%39%38%67%39% Uncertainty about Compensation Structure 47%56%60%38%31%65%37% Lack of Trust in Industry Partners38%36%33%24%26%38%30% Lack of Necessary Skills34%25%24%10%22%29%18% Lack of Info About Process29%28%20%25%36%32%22% Lack Appropriate Technology34%21%18%13%22%26%17%  Owners are the least likely to believe that lack of support by the industry is a barrier to IPD. The remaining segments view it as a barrier.

projects: over 30% behind schedule and over budget Source: AIA Survey 2008

19 Source: AIA Survey % of DBB projects behind schedule 22% of IPD projects behind schedule 62% of DBB projects on or ahead 78% of IPD projects on or ahead

20 Source: AIA Survey % of DBB projects over budget 25% of IPD projects over budget 63% of DBB projects on or under budget 75% of IPD projects on or under budget

IPD projects: overages drop by almost 2/3 Source: AIA Survey % of IPD projects on or ahead of schedule 86% of IPD projects on or under budget

22 BIM appears to be influential in the success of IPD projects. Confidential Base: Experienced with IPD n=488 Base: Experienced/Project included BIM n=254

23 Sustainability goals are common in IPD projects, and appear to be influential in achieving sustainability goals. Confidential Base: Experienced with IPD n=488 Base: Experienced/Project included Sustainability Goals n=336

24 Source: AIA Survey % 16% 4% 10% 14%

25 Anecdotal but driving to quantitative IPD seen as influential in accomplishing sustainability goals Collaborative models establish stronger goals Implementing complex sustainability strategies is best accomplished with more stakeholders Connections to Sustainability

26 50to50 |

27 50 specific strategies to move toward carbon reduction. A how-to resource for practitioners and others. Text, diagrams, and images. 50to50

28 agreements

29 Transitional Forms | B195, A195, A295 More recognizable, familiar Utilizes GMP contract with pre-construction services Immediately familiar and usable within today’s environment SPE – Full Integration | C195 More provocative, unique approach Single Purpose Entity (Limited Liability Company) All for one and one for all IPD Agreements – Two Approaches

30 GMP Amendment Owner Architect Agreement Business Terms General Conditions All Responsibilities of Owner, Architect and Contractor for All Phases of Design and Construction Owner Contractor Agreement Business Terms A295 Transitional IPD Forms

31 Owner C C C C A CM SPE SPE Contract Structure 1 1. SPE Agreement 2. SPE Member Services Agreement SPE Owner Agreement 3 4. Non-Member Agreement

32 Structures the SPE Provides for SPE management Includes procedure for establishing Target Cost Contains Dispute Resolution provision CM O A Owner Construction Manager Architect SPE SPE Agreement – C195

33 Owner Funds SPE Owner Audit Rights Limitation of Liability, Indemnification and Waiver of Claims All disputes resolved under SPE dispute resolution provisions CM A SPE Owner SPE Owner Agreement – C196

34 Services at Cost Incentive and Goal Achievement Comp. SPE has Audit Rights Limitation of Liability, Indemnification and Waiver of Claims All disputes resolved under SPE dispute resolution provisions SPE CM A Owner SPE Member Services Agreement – C196

35 With Non-Member consultants and contractors Contracts for stipulated sum or GMP C C C C Owner SPE CM A SPE Non-Member Agreements

36 E202: BIM Protocol Exhibit

37 Phase UniFormat 300 Series Level of Development Model Element Author Notes

38 Key Definitions Coordination Model Standards Ownership

39 Model Management

40 Levels of Development LOD 100: Massing content indicative of volume, location, and orientation. LOD 200: Generalized systems or assemblies with approximate quantities. LOD 300: Specific assemblies accurate in terms of quantity, size, shape, location, and orientation. LOD 400: LOD 300 with fabrication, assembly and detailing information added. LOD 500: “Record Model”

41 Flow-down

42 Traditional Delivery

43 Integrated Project Delivery

44 Non-UniFormat Elements

MHC SmartMarket Report xPT Whitepaper Consensus opinions about industry change from owners, contractors, and architects

46 Coming soon! On Compensation: Considerations for Teams in a Transformed Industry Outline Introduction Motivations of Team Members: Why Do We Do This Compensation for What: Ingredients of Compensation Current Compensation Models New Value Propositions Appendix A: Three Sample Models Appendix B: FAQs about Compensation

47